Information Notices - 1998
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
IN-98-45 | Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds | -- | 12/15/1998 | -- |
IN-98-44 | Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping | -- | 12/10/1998 | -- |
IN-98-43 | Leaks in the Emergency Diesel Generator Lubricating Oil and Jacket Cooling Water Piping | -- | 12/04/1998 | -- |
IN-98-42 | Implementation of 10 CFR 50.55a(g) Inservice Inspection Requirements | -- | 12/01/1998 | -- |
IN-98-41 | Spurious Shutdown of Emergency Diesel Generators from Design Oversight | -- | 11/20/1998 | -- |
IN-98-40 | Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents | -- | 10/26/1998 | -- |
IN-98-39 | Summary of Fitness-For-Duty Program Performance Reports for Calendar Years 1996 and 1997 | -- | 10/30/1998 | -- |
IN-98-38 | Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections | -- | 10/15/1998 | -- |
IN-98-37 | Eligibility of Operator License Applicants | -- | 10/01/1998 | -- |
IN-98-36 | Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems | -- | 09/18/1998 | -- |
IN-98-35 | Threat Assessments and Consideration of Heightened Physical Protection Measures issued | W, Superseded by RIS 2002-12A, RIS 2002-12C, RIS 2002-12D, RIS 2002-12i | 02/17/2023 | |
-- | 09/04/1998 | -- | ||
IN-98-34 | Configuration Control Errors | -- | 08/28/1998 | -- |
IN-98-33 | NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities | -- | 08/28/1998 | -- |
IN-98-32 | NONE | -- | 01/26/1999 | -- |
IN-98-31 | Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 2 | -- | 08/18/1998 | -- |
IN-98-30 | Effect of the Year 2000 Computer Problem on NRC Licensees and Certificate Holders | -- | 08/12/1998 | -- |
IN-98-29 | Predicted Increase in Fuel Rod Cladding Oxidation | -- | 08/03/1998 A 08/03/1998 B | -- |
IN-98-28 | Development of Systematic Sample Plan for Operator Licensing Examinations | -- | 07/31/1998 | -- |
IN-98-27 | Steam Generator Tube End Cracking | -- | 07/24/1998 | -- |
IN-98-26 | Settlement Monitoring and Inspection of Plant Structures Affected by Degradation of Porous Concrete Subfoundations | -- | 07/24/1998 | -- |
IN-98-25 | Loss of Inventory from Safety-Related, Closed-Loop Cooling Water Systems | -- | 07/08/1998 | -- |
IN-98-24 | Stem Binding in Turbine Governor Valves in Reactor Core Isolation Cooling (RCIC) and Auxiliary Feedwater (AFW) Systems | -- | 06/26/1998 | -- |
IN-98-23 | Crosby Relief Valve Setpoint Drift Problems Caused by Corrosion of The Guide Ring | -- | 06/23/1998 | -- |
IN-98-22 | Deficiencies Identified During NRC Design Inspections | -- | 06/17/1998 | -- |
IN-98-21 | Potential Deficiency of Electrical Cable/Connection Systems | -- | 06/04/1998 | -- |
IN-98-20 | Problems with Emergency Preparedness Respiratory Protection Programs | -- | 06/03/1998 | -- |
IN-98-19 | Shaft Binding in General Electric Type SBM Control Switches | -- | 06/03/1998 | -- |
IN-98-18 | Recent Contamination Incidences Resulting from Failure to Perform Adequate Surveys | -- | 05/13/1998 | -- |
IN-98-17 | Federal Bureau of Investigation's (FBI) Awareness of National Security Issues and Response (ANSIR) Program | -- | 05/07/1998 | -- |
IN-98-16 | Inadequate Operational Checks of Alarm Ratemeters | -- | 04/30/1998 | -- |
IN-98-15 | Integrity of Operator Licensing Examinations | -- | 04/20/1998 | -- |
IN-98-14 | Undocumented Changes to Non-Power Reactor Safety System Wiring | -- | 04/20/1998 | -- |
IN-98-13 | Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality | -- | 04/20/1998 | -- |
IN-98-12 | Licensees' Responsibilities Regarding Reporting and Follow-Up Requirements for Nuclear-Powered Pacemakers | -- | 04/03/1998 | -- |
IN-98-11 | Cracking of Reactor Vessel Internal Baffle Former Bolts in Foreign Plants | -- | 03/25/1998 | -- |
IN-98-10 | Probable Misadministrations Occurring During Intravascular Brachytherapy with the Novoste Beta-Cath System | -- | 03/09/1998 | -- |
IN-98-09 | Collapse of an ISOCAM II, Dual-Headed Nuclear Medicine Gamma Camera | -- | 03/05/1998 | -- |
IN-98-08 | Information Likely to be Requested if an Emergency is Declared | -- | 03/02/1998 | -- |
IN-98-07 | Offsite Power Reliability Challenges from Industry Deregulation | -- | 02/27/1998 | -- |
IN-98-06 | Unauthorized Use of License to Obtain Radioactive Materials, and its Implications under the Expanded Title 18 of the U.S. Code | -- | 02/19/1998 | -- |
IN-98-05 | Criminal History Record Information | -- | 02/11/1998 | -- |
IN-98-04 | 1997 Enforcement Sanctions for Deliberate Violations of NRC Employee Protection Requirements | -- | 02/09/1998 | -- |
IN-98-03 | Inadequate Verification of Overcurrent Trip Setpoints in Metal-Clad, Low-Voltage Circuit Breakers | -- | 01/21/1998 | -- |
IN-98-02 | Nuclear Power Plant Cold Weather Problems and Protective Measures | -- | 01/21/1998 | -- |
IN-98-01 | Thefts of Portable Gauges | -- | 01/15/1998 A 01/15/1998 B | -- |
Page Last Reviewed/Updated Thursday, January 09, 2025
Page Last Reviewed/Updated Thursday, January 09, 2025