Information Notices – 2018
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
IN-18-11 | Kobe Steel Quality Assurance Record Falsification | S1 | 12/01/2020 | -- |
-- | 09/24/2018 | -- | ||
IN-18-10 | Thermal Sleeve Flange Wear Leads to Stuck Control Rod at Foreign Nuclear Plant | -- | 08/29/2018 | -- |
IN-18-09 | Electrical Arc Flash Caused by Foreign Material Damages Fire Door | -- | 08/10/2018 | -- |
IN-18-08 | Failure to Enter the Required Technical Specifications Action Statement for Operation During Recent Surveillance Testing While Using a Reactor Protection System Test Box | -- | 06/13/2018 | -- |
IN-18-07 | Pump/Turbine Bearing Oil Sight Glass Problems | -- | 06/13/2018 | -- |
IN-18-06 | Determination of Management Measures for Process Isolation Controls Designated as Items Relied on for Safety and Implementation of Adequate Quality Assurance Measures for Plant Features and Procedures | -- | 04/10/2018 | -- |
IN-18-05 | Long-Term Fissile Material Accumulation Due to Unanalyzed or Improperly Analyzed Conditions at Fuel Cycle Facilities | -- | 03/26/2018 | -- |
IN-18-04 | Operating Experience Regarding Failure of Operators to Trip the Plant When Experiencing Unstable Conditions | -- | 02/26/2018 | -- |
IN-18-03 | Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions | -- | 02/26/2018 | -- |
IN-18-02 | Testing and Operations-Induced Degradation of 3-Stage Target Rock Safety Relief Valves | -- | 02/26/2018 | -- |
IN-18-01 | Noble Fission Gas Releases During Spent Fuel Cask Loading Operations | -- | 02/21/2018 | -- |