Information Notices - 2014
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
IN-14-15 | Inadequate Controls of Respiratory Protection Accessibility, Training, and Maintenance | -- | 12/01/2014 | -- |
IN-14-14 | Potential Safety Enhancements to Spent Fuel Pool Storage | -- | 11/14/2014 | -- |
IN-14-13 | -- | Not Issued | -- | |
IN-14-12 | Crane and Heavy Lift Issues Identified during NRC Inspections | -- | 11/14/2014 | -- |
IN-14-11 | Recent Issues Related to the Qualification of Safety-Related Components | -- | 09/19/2014 | -- |
IN-14-10 | Potential Circuit Failure-Induced Secondary Fires or Equipment Damage | -- | 09/16/2014 | -- |
IN-14-09 | Spent Fuel Storage or Transportation System Misloading | -- | 06/20/2014 | -- |
IN-14-08 | Need for Continuous Monitoring Of Active Systems in Loaded Spent Fuel Storage Canisters (Including Vacuum Drying Process) | -- | 05/16/2014 | -- |
IN-14-07 | Degradation of Leak Chase Channel Systems for Floor Welds of Metal Containment Shell and Concrete Containment Metallic Liner | -- | 05/05/2014 | -- |
IN-14-06 | Damage Of Industrial Radiographic Equipment Due To Falling Equipment and Improper Mounting | -- | 04/28/2014 | -- |
IN-14-05 | Verifying Appropriate Dosimetry Evaluation | -- | 05/12/2014 | -- |
IN-14-04 | Potential for Teflon® Material Degradation in Containment Penetrations, Mechanical Seals and Other Components | -- | 03/26/2014 | -- |
IN-14-03 | Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues | -- | 02/25/2014 | -- |
IN-14-02 | Failure To Properly Pressure Test Reactor Vessel Flange Leak-Off Lines | -- | 02/25/2014 | -- |
IN-14-01 | Fuel Safety Limit Calculation Inputs Were Inconsistent with NRC-Approved Correlation Limit Values | -- | 02/21/2014 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021