Generic Letters – 1989
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
GL-89-23 | NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26 | -- | 10/23/1989 | -- |
GL-89-22 | Potential for Increased Roof Loads and Plant Area Flood Runoff Depth Due to Recent Change in Probable Maximum Precipitation Criteria Developed by the National Weather Service | -- | 10/19/1989 | -- |
GL-89-21 | Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements | -- | 10/19/1989 | -- |
GL-89-20 | Protected Area Long-Term Housekeeping | -- | 09/26/1989 | -- |
GL-89-19 | Request for Actions Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants" Pursuant to 10 CFR 50.54(f) | -- | 09/20/1989 | -- |
GL-89-18 | Resolution of Unresolved Safety Issues A-17, "Systems Interactions in Nuclear Power Plants" | -- | 09/06/1989 | -- |
GL-89-17 | Planned Administrative Changes to the NRC Operator Licensing Written Examination Process | W | 81 FR 73448 10/25/16 |
-- |
09/06/1989 | ||||
GL-89-16 | Installation of a Hardened Wetwell Vent | -- | 09/01/1989 | -- |
GL-89-15 | Emergency Response Data System | -- | 08/21/1989 | -- |
GL-89-14 | Line-Item Improvements in Technical Specifications - Removal of 3.25 Limit on Extending Surveillance Intervals | -- | 08/21/1989 | -- |
GL-89-13 | Service Water System Problems Affecting Safety-Related Equipment | S1 | 04/04/1990 | -- |
-- | 07/18/1989 | -- | ||
GL-89-12 | Operator Licensing Examination | -- | 07/06/1989 | -- |
GL-89-11 | Resolution of Generic Issue 101 "Boiling Water Reactor Water Level Redundancy" | -- | 06/30/1989 | -- |
GL-89-10 | Safety-Related Motor-Operated Valve Testing and Surveillance | S7 | 01/24/1996 | -- |
S6 | 03/08/1994 | -- | ||
S5 | 06/28/1993 | -- | ||
S4 | 02/12/1992 | -- | ||
S3 | 10/25/1990 | -- | ||
S2 | 08/03/1990 | -- | ||
S1 | 06/13/1990 | -- | ||
-- | 06/28/1989 | -- | ||
GL-89-09 | ASME Section III Component Replacements | -- | 05/08/1989 | -- |
GL-89-08 | Erosion/Corrosion-Induced Pipe Wall Thinning | -- | 05/02/1989 | -- |
GL-89-07 | Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs | S1 | 08/21/1989 | -- |
-- | 04/28/1989 | -- | ||
GL-89-06 | Task Action Item I.D.2 - Safety Parameter Display System - 10 CFR 50.54 (f) | -- | 04/12/1989 | -- |
GL-89-05 | Pilot Testing of the Fundamentals Examination | -- | 04/04/1989 | -- |
GL-89-04 | Guidance on Developing Acceptable Inservice Testing Programs | S1 | 04/04/1995 | -- |
-- | 04/03/1989 | -- | ||
GL-89-03 | Operator Licensing Examination Schedule | 81 FR 31969 05/20/2016 |
-- | |
03/24/1989 | ||||
GL-89-02 | Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products | -- | 03/21/1989 | -- |
GL-89-01 | Implementation of Programmatic and Procedural Controls for Radiological Effluent Technical Specifications | S1 | 11/14/1990 | -- |
-- | 01/31/1989 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021