Generic Letters - 1993
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
GL-93-08 | Relocation of Technical Specification Tables of Instrument Response Time Limits | -- | 12/29/1993 | -- |
GL-93-07 | Modification of the Technical Specification Administrative Control Requirements for Emergency and Security Plans | -- | 12/28/1993 | -- |
GL-93-06 | Research Results on Generic Safety Issue 106, "Piping and the Use of Highly Combustible Gases in Vital Areas" | -- | 10/25/1993 | -- |
GL-93-05 | Line-Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operation | -- | 09/27/1993 | -- |
GL-93-04 | Rod Control System Failure and Withdrawal of Rod Control Cluster Assemblies, 10 CFR 50.54(f) | -- | 06/21/1993 | -- |
GL-93-03 | Verification of Plant Records | -- | 10/20/1995 | -- |
GL-93-02 | NRC Public Workshop on Commercial Grade Procurement and Dedication | -- | 03/23/1993 | -- |
GL-93-01 | Emergency Response Data System Test Program | -- | 03/03/1993 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021