Generic Letters - 1979
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
GL-79-70 | Environmental Monitoring for Direct Radiation | -- | 12/21/1979 | -- |
GL-79-69 | Cladding Rupture, Swelling, and Coolant Blockage as a Result of a Reactor Accident | -- | 12/20/1970 | -- |
GL-79-68 | Audit of Small Break LOCA Guidelines | -- | 12/17/1979 | -- |
GL-79-67 | Estimates for Evacuation of Various Areas Around Nuclear Power Reactors | -- | 11/29/1979 | -- |
GL-79-66 | Additional Information Re 11/09/79 Letter on ECCS Calculations | -- | 11/27/1979 | -- |
GL-79-65 | Radiological Environmental Monitoring Program Requirements – Enclosing Branch Technical Position, Revision 1 | -- | 11/27/1979 | -- |
GL-79-64 | Suspension of All Operating Licenses | -- | 11/23/1979 | -- |
GL-79-63 | Upgraded Emergency Plans | -- | 11/21/1979 | -- |
GL-79-62 | Duplicate of GL-79-58 | -- | -- | -- |
GL-79-61 | Discussion of Lessons Learned Short Term Requirements | -- | 11/09/1979 | -- |
GL-79-60 | Discussion of Lessons Learned Short Term Requirements | -- | 11/09/1979 | -- |
GL-79-58 | ECCS Calculations on Fuel Cladding | -- | Date Unknown | -- |
GL-79-57 | Acceptance Criteria for the Mark I Containment Long Term Program | -- | Date Unknown | -- |
GL-79-56 | Discussion of Lessons Learned Short Term Requirements | -- | 10/30/1979 | -- |
GL-79-55 | Summary of Meeting Held on October 12, 1979 to Discuss Responses to IE Bulletins 79-05C and 79-06C and HPI Termination Criteria | -- | Date Unknown | -- |
GL-79-54 | Containment Purging and Venting During Normal Operation | -- | Date Unknown | -- |
GL-79-53 | ATWS | -- | Date Unknown | -- |
GL-79-52 | Radioactive Release at North Anna Unit 1 and Lessons Learned | -- | Date Unknown | -- |
GL-79-51 | Follow-up Actions Resulting from the NRC Staff Reviews Regarding the TMI-2 Accident | -- | 10/10/1979 | -- |
GL-79-50 | Emergency Plans Submittal Dates | -- | Date Unknown | -- |
GL-79-49 | Summary of Meetings Held on 9/18-20/79 to Discuss Potential Unreviewed Safety Question on Systems Interaction for B&W Pl | -- | 10/05/1979 | -- |
GL-79-48 | Confirmatory Requirements Relating to Condensation Oscillation Loads for the Mark I Containment Long Term Program | -- | 10/02/1979 | -- |
GL-79-47 | Radiation Training | -- | 10/02/1979 | -- |
GL-79-46 | Containment Purging and Venting During Normal Operation – Guidelines for Valve Operability | -- | 09/27/1979 | -- |
GL-79-45 | Transmittal of Reports Regarding Foreign Reactor Operating Experiences | -- | 09/25/1979 | -- |
GL-79-44 | Referencing 6/29/79 Letter Re Multiple Equipment Failures | -- | 09/21/1979 | -- |
GL-79-43 | Reactor Cavity Seal Ring Generic Issue | -- | Date Unknown | -- |
GL-79-42 | Potential Unreviewed Question on Interaction Between Non-Safety Grade Systems and Safety Grade Systems | -- | 09/17/1979 | -- |
GL-79-41 | Compliance with 40 CFR 190, EPA Uranium Fuel Cycle Standard | -- | 09/17/1979 | -- |
GL-79-40 | Follow-up Actions Resulting from the NRC Staff Reviews Regarding the TMI-2 Accident | -- | 09/13/1979 | -- |
GL-79-39 | Transmitting Division 5 Draft Regulatory Guide and Value Impact Statement | -- | 08/22/1979 | -- |
GL-79-38 | BWR Off-Gas Systems – Enclosing NUREG/CR-0727 | -- | 08/22/1979 | -- |
GL-79-37 | Amendment to 10 CFR 73.55 Deferral from 8/1/79 to 11/1/79 | -- | 08/10/1973 | -- |
GL-79-36 | Adequacy of Station Electric Distribution Systems Voltages | -- | 08/08/1979 | -- |
GL-79-35 | Regional Meetings to Discuss Impacts on Emergency Planning | -- | 08/03/1979 | -- |
GL-79-34 | New Physical Security Plans (FR 43280-285) | -- | 07/30/1979 | -- |
GL-79-33 | Transmitting NUREG-0576 - Security Training and Qualification Plans | -- | 07/30/1979 | -- |
GL-79-32 | Transmitting NUREG-0578, "TMI-2 Lessons Learned" | -- | Date Unknown | -- |
GL-79-31 | Submittal of Copies of Response to 6/29/79 NRC Request | -- | Date Unknown | -- |
GL-79-30 | Transmitting NUREG-0472, Revision 2, Draft Radiological Technical Specifications | -- | 07/18/1979 | -- |
GL-79-29 | Transmitting NUREG-0473, Revision 2, Draft Radiological Effluent Technical Specifications | -- | 07/18/1979 | -- |
GL-79-28 | Evaluation of Semi-Scale Small Break Experiment | -- | 07/10/1979 | -- |
GL-79-27 | Operability Testing of Relief and Safety Relief Valves | -- | 07/16/1979 | -- |
GL-79-26 | Upgraded Standard Technical Specification Bases Program | -- | Date Unknown | -- |
GL-79-25 | Information Required to Review Corporate Capabilities | -- | Date Unknown | -- |
GL-79-24 | Multiple Equipment Failures in Safety-Related Systems | -- | 06/26/1979 | -- |
GL-79-23 | NRC Staff Review of Responses to I&E Bulletin 79-08 | -- | 06/20/1979 | -- |
GL-79-22 | Enclosing NUREG-0560, "Staff Report on the Generic Assessment of Feedwater Transients in PWRs Designed by B&W | -- | 06/11/1979 | -- |
GL-79-21 | Enclosing NUREG/CR 0660, "Enhancement of on Site Emergency Diesel Generator Reliability" | -- | 06/04/1979 | -- |
GL-79-20 | Cracking in Feedwater Lines | -- | 05/25/1979 | -- |
GL-79-19 | NRC Staff Review of Responses to I&E Bulletins 79-06 and 79-06a | -- | 05/22/1979 | -- |
GL-79-18 | Westinghouse Two-Loop NSSS | -- | 05/15/1979 | -- |
GL-79-17 | Reliability of Onsite Diesel Generators at Light Water Reactors | -- | 04/18/1979 | -- |
GL-79-16 | Meeting Re Implementation Of Physical Security Requirements | -- | 03/22/1979 | -- |
GL-79-15 | Steam Generators-Enclosing Summary of Operating Experience with Recirculating Steam Generators, NUREG-0523 | -- | 03/21/1979 | -- |
GL-79-14 | Pipe Crack Study Group – Enclosing NUREG-0531 and Notice | -- | 03/15/1979 | -- |
GL-79-13 | Schedule for Implementation and Resolution of Mark I Containment Long Term Program | -- | 03/12/1979 | -- |
GL-79-12 | ATWS – Enclosing Letter to GE, with NUREG-0460, Vol. 3 | -- | 03/12/1979 | -- |
GL-79-11 | Transmitting "Summary of Operating Experience with Recalculating Steam Generators, January 1979" NUREG-0523 | -- | Date Unknown | -- |
GL-79-10 | Transmitting Regulatory Guide 2.6 for Comment | -- | 02/28/1979 | -- |
GL-79-09 | Staff Evaluation of Interim Multiple-Consecutive Safety-Relief Valve Actuations | -- | 02/27/1979 | -- |
GL-79-08 | Amendment to 10 CFR 73.55 | -- | 02/20/1979 | -- |
GL-79-07 | Seismic (SSE) and LOCA Responses (NUREG-0484) | -- | 02/21/1979 | -- |
GL-79-06 | Contents of the Offsite Dose Calculation Manual | -- | 02/14/1979 | -- |
GL-79-05 | Information Relating to Categorization of Recent Regulatory Guides by the Regulatory Requirements Review Committee | -- | 01/26/1979 | -- |
GL-79-04 | Referencing 4/14/78 Letter – Modifications to NRC Guidance "Review and Acceptance of Spent Fuel Pool Storage and Handling" | -- | 01/18/1979 | -- |
GL-79-03 | Offsite Dose Calculation Manual | -- | 01/18/1979 | -- |
GL-79-02 | Transmitting Rev. to Entry Control Systems Handbook (SAND 77-1033), Intrusion Detection Handbook (SAND 76-0554), and Barrier Penetration Database | -- | 01/09/1979 | -- |
GL-79-01 | Interservice Procedures for Instructional Systems Development – TRADOC | -- | 01/09/1979 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021