Generic Letters - 1996
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
GL-96-07 | Interim Guidance on Transportation of Steam Generators | -- | 12/05/1996 | -- |
GL-96-06 | Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions | S1 | 11/13/1997 | -- |
-- | 09/30/1996 | -- | ||
GL-96-05 | Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves | -- | 09/18/1996 | -- |
GL-96-04 | Boraflex Degradation in Spent Fuel Pool Storage Racks | -- | 06/26/1996 | -- |
GL-96-03 | Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits | -- | 01/31/1996 | -- |
GL-96-02 | Reconsideration of Nuclear Power Plant Security Requirements Associated with an Internal Threat | -- | 02/13/1996 | -- |
GL-96-01 | Testing of Safety-Related Logic Circuits | -- | 01/10/1996 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021