Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Generic Letters - 1996

Document Number Title Revision Publish Date Reviewed Date
GL-96-07 Interim Guidance on Transportation of Steam Generators -- 12/05/1996 --
GL-96-06 Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions S1 11/13/1997 --
-- 09/30/1996 --
GL-96-05 Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves -- 09/18/1996 --
GL-96-04 Boraflex Degradation in Spent Fuel Pool Storage Racks -- 06/26/1996 --
GL-96-03 Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits -- 01/31/1996 --
GL-96-02 Reconsideration of Nuclear Power Plant Security Requirements Associated with an Internal Threat -- 02/13/1996 --
GL-96-01 Testing of Safety-Related Logic Circuits -- 01/10/1996 --

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021