Generic Letters - 1981
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
GL-81-40 | Qualifications of Reactor Operators | -- | 12/16/1981 | -- |
GL-81-39 | NRC Volume Reduction Policy | -- | 11/30/1981 | -- |
GL-81-38 | Storage of Low Level Radioactive Wastes at Power Reactor Sites | -- | 11/10/1981 | -- |
GL-81-37 | ODYN Code Reanalysis Requirements | -- | 12/29/1981 | -- |
GL-81-36 | Revised Schedule for Completion of TMI Action Plan Item II.D.1, Relief and Safety Valve Testing | -- | 09/29/1981 | -- |
GL-81-35 | Safety Concerns Associated with Pipe Breaks in the BWR Scram System | -- | 08/31/1981 | -- |
GL-81-34 | Safety Concerns Associated with Pipe Breaks in the BWR Scram System | -- | 08/31/1981 | -- |
GL-81-33 | Technical Specification for Station Batteries Multiplant Action | -- | Not Issued | -- |
GL-81-32 | NUREG-0737, Item II.K.3.44-Evaluation of Anticipated Transients Combined with Single Failure | -- | 08/07/1981 | -- |
GL-81-31 | Small Break LOCA Confirmatory Integral Systems Experiments for B&W DesignedPlants | -- | Not Issued | -- |
GL-81-30 | Safety Concerns Associated with Pipe Breaks in the BWR Scram System | -- | 07/31/1981 | -- |
GL-81-29 | Simulator Examinations | -- | 08/07/1981 | -- |
GL-81-28 | Steam Generator Overfill | -- | 07/31/1981 | -- |
GL-81-27 | Privacy and Proprietary Material in Emergency Plans | -- | 07/09/1981 | -- |
GL-81-26 | Licensing Requirements for Pending Construction Permit and Manufacturing License Applications | -- | 07/14/1981 | -- |
GL-81-25 | Change in Implementing Schedule for Submission and Evaluation of Upgraded Emergency Plans | -- | 06/15/1981 | -- |
GL-81-24 | Multi-Plant Issue B-56 Control Rods Fail to Fully Insert | -- | 06/15/1981 | -- |
GL-81-23 | INPO Plant Specific Evaluation Reports | S1 | 07/06/1981 | -- |
-- | 06/04/1981 | -- | ||
GL-81-22 | Engineering Evaluation of the H.B. Robinson Reactor Coolant System Leak on 1/29/81 | -- | 05/05/1981 | -- |
GL-81-21 | Natural Circulation Cooldown | -- | 05/05/1981 | -- |
GL-81-20 | Safety Concerns Associated with Pipe Breaks in the BWR Scram System | -- | 04/10/1981 | -- |
GL-81-19 | Thermal Shock to Reactor Pressure Vessels | -- | 04/20/1981 | -- |
GL-81-18 | BWR Scram Discharge System-Clarification of Diverse Instrumentation Requirements | -- | 03/30/1981 | -- |
GL-81-17 | Functional Criteria for Emergency Response Facilities | -- | 03/05/1981 | -- |
GL-81-16 | NUREG-0737 Item I.C.1 SER on Abnormal Transient Operating Guidelines (ATOG) | -- | 06/01/1981 | -- |
GL-81-15 | Environmental Qualification of Class 1E Electrical Equipment-Clarification of Staffs Handling of Proprietary Information | -- | 03/10/1981 | -- |
GL-81-14 | Seismic Qualifications for Auxiliary Feedwater Systems | -- | 02/10/1981 | -- |
GL-81-13 | SER for GEXL Correlation for 8X8R Fuel Reload Applications for Appendix D Submittals of the GE Topical Report | -- | 05/28/1981 | -- |
GL-81-12 | Fire Protection Rule (45 FR 76602, 11/19/80) | -- | 02/20/1981 | -- |
GL-81-11 | BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking (NUREG-0619) | -- | 02/29/1981 | -- |
GL-81-10 | Post-TMI Requirements for the Emergency Operations Facility | -- | 02/18/1981 | -- |
GL-81-09 | BWR Scram Discharge System | -- | 01/23/1981 | -- |
GL-81-08 | Odyn Code | -- | 01/29/1981 | -- |
GL-81-07 | Control of Heavy Loads | -- | 02/03/1981 | -- |
GL-81-06 | Periodic Updating of Final Safety Analysis Reports (FSARS) | -- | 02/26/1981 | -- |
GL-81-05 | Information Regarding the Program for Environmental Qualification Of Safety-Related Electrical Equipment | -- | 01/19/1981 | -- |
GL-81-04 | Emergency Procedures And Training for Station Blackout Events | -- | 02/25/1981 | -- |
GL-81-03 | Implementation of NUREG-0313,Technical Report on Material Selection & Processing GL for BWR Coolant Press Boundary Piping | -- | 02/26/1981 | -- |
GL-81-02 | Analysis, Conclusions and Recommendations Concerning Operator Licensing | -- | 01/27/1981 | -- |
GL-81-01 | Qualification of Inspection, Examination, Testing and Audit Personnel | -- | 05/04/1981 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021