Generic Letters - 1985
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
GL-85-22 | Potential for Loss of Post-LOCA Recirculation Capability Due to Insulation Debris Blockage | -- | 12/03/1985 | -- |
GL-85-21 | -- | Not Issued | -- | |
GL-85-20 | Resolution of Generic Issue 69: High Pressure Injection/Make-up Nozzle Cracking in Babcock And Wilcox Plants | -- | 11/08/1985 | -- |
GL-85-19 | Reporting Requirements on Primary Coolant Iodine Spikes | -- | 09/27/1985 | -- |
GL-85-18 | Operator Licensing Examinations | 81 FR 31969 05/20/2016 |
-- | |
09/27/1985 | ||||
GL-85-17 | Availability of Supplements 2 and 3 to NUREG-0933, "A Prioritization of Generic Safety Issues" | -- | 08/23/1985 | -- |
GL-85-16 | High Boron Concentrations | -- | 08/23/1985 | -- |
GL-85-15 | Information on Deadlines for 10CFR50.49, "Environmental Qualification of Electric Equipment Important to Safety at Nuclear Power Plants" | -- | 08/06/1985 | -- |
GL-85-14 | Commercial Storage at Power Reactor Sites of Low Level Radioactive Waste Not Generated by The Utility | -- | 08/01/1985 | -- |
GL-85-13 | Transmittal of NUREG-1154 Regarding The Davis-Besse Loss of Main And Auxiliary Feedwater Event | -- | 08/05/1985 | -- |
GL-85-12 | Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps | -- | 06/28/1985 | -- |
GL-85-11 | Completion of Phase II of "Control of Heavy Loads at Nuclear Power Plants" NUREG-0612 | -- | 06/28/1985 | -- |
GL-85-10 | Technical Specification for Generic Letter 83-28, Items 4.3 and 4.4 | -- | 05/23/1985 | -- |
GL-85-09 | Technical Specifications for Generic Letter 83-28, Item 4.3 | -- | 05/23/1985 | -- |
GL-85-08 | 10 CFR 20.408 Termination Reports - Format | -- | 05/23/1985 | -- |
GL-85-07 | Implementation of Integrated Schedules for Plant Modifications | -- | 05/02/1985 | -- |
GL-85-06 | Quality Assurance Guidance for ATWS Equipment That is Not Safety-Related | -- | 01/16/1985 | -- |
GL-85-05 | Inadvertent Boron Dilution Events | -- | 01/31/1985 | -- |
GL-85-04 | Operating Licensing Examinations | 81 FR 31969 05/20/2016 |
-- | |
01/28/1985 | ||||
GL-85-03 | Clarification of Equivalent Control Capacity for Standby Liquid Control Systems | -- | 01/28/1985 | -- |
GL-85-02 | Staff Recommended Actions ... Regarding Steam Generator Tube Integrity | -- | 04/17/1985 | -- |
GL-85-01 | Fire Protection Policy Steering Committee Report | -- | 01/09/1985 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021