Preliminary Notification (PN) Reports for 2018
| April | May | October | November |
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
November | ||
---|---|---|
PNO-III-19-002 | 11/14/2018 | Palisades Nuclear Plant, Through-Wall Leak Identified on A Reactor Vessel Head Nozzle |
![]() |
||
October | ||
PNO-III-19-001 | 10/18/2018 | Palisades Nuclear Plant, Maintenance Outage to Repair Control Rod Drive and Failed Transformer |
![]() |
||
May | ||
PNO-III-18-003A | 05/08/2018 | UPDATE: Fermi Power Plant, Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer #64 and Subsequent Reactor Scram |
![]() |
||
April | ||
PNO-III-18-003 | 04/17/2018 | Fermi Power Plant, Unplanned Shutdown Greater Than 72 Hours Following A Loss Of Station System Transformer #64 And Subsequent Reactor Scram |
PNO-III-18-002 | 04/04/2018 | Beaver Valley, Davis-Besse, Perry Notification of Bankruptcy Filing By FirstEnergy Solutions |
![]() |