December | ||
---|---|---|
PNO-IV-04-030 | 12/13/2004 | Ground Engineering Consultants: Lost Source from a Troxler Moisture Density Gauge |
November | ||
PNO-II-04-011 | 11/24/2004 | Paducah Gaseous Diffusion Plant: Fire in Product Withdrawal Building |
PNO-I-04-014 | 11/16/2004 | Connecticut Yankee Atomic Power Company: Fire Inside Containment Structure at Decommissioning Reactor Site |
PNO-III-04-015 | 11/15/2004 | FirstEnergy Nuclear Operating Co./Perry Nuclear Power Plant: Inadvertent Discharge of Co2 Fire Protection System in Turbine Building |
PNO-III-04-014 | 11/04/2004 | Perry Nuclear Power Plant: Chemical Spill in Water Treatment Building |
October | ||
PNO-IV-04-029 | 10/20/2004 | Cooper Nuclear Station: Reactor Shutdown Because of Main Turbine High Vibration |
PNO-II-04-010 | 10/18/2004 | McGuire, Unit 1: Shutdown of McGuire, Unit 1 for Greater than 72 Hours |
PNO-1-04-013 | 10/12/2004 | PSEG Nuclear LLC/Hope Creek: Hope Creek Unplanned Shutdown of Greater than 72 Hours - Steam Leak Due to a Rupture of the Hope Creek "A" Moisture Separator (MS) Drain Line to the Condenser |
PNO-IV-04-027 | 10/04/2004 | River Bend Station: Shutdown Greater than 72 Hours |
September | ||
PNO-IV-04-026A | 09/29/2004 | Diablo Canyon, Units 1 & 2: Response to California Earthquake - Update |
PNO-I-04-012 | 09/28/2004 | Connecticut Yankee Atomic Power Company: Fire in Vacant Administration Building at Decommissioning Reactor Site |
PNO-IV-04-026 | 09/28/2004 | Diablo Canyon, Units 1 & 2: Response to California Earthquake |
PNO-II-04-009C | 09/27/2004 | Florida Power and Light: Tropical Storm/Hurricane Jeanne |
PNO-II-04-009B | 09/26/2004 | Florida Power Corporation: Region II Response to Hurricane Jeanne |
PNO-II-04-009A | 09/26/2004 | Florida Power and Light Co.: Region II Response to Hurricane Jeanne |
PNO-II-04-009 | 09/25/2004 | Florida Power and Light Co.: Region II Response to Hurricane Jeanne |
PNO-IV-04-024A | 09/20/2004 | CANSPEC (USA): Updated info Concerning a Truck Fire Involving an AEA Technology Model 880D Radiography Camera |
PNO-IV-04-025A | 09/16/2004 | River Bend & Waterford 3: Region IV Response to Hurricane Ivan |
PNO-IV-04-025 | 09/15/2004 | River Bend & Waterford 3: Region IV Response to Hurricane Ivan |
PNO-IV-04-024 | 09/13/2004 | CANSPEC (USA): Truck Fire Involving an AEA Technology Model 880 Radiography Camera |
PNO-II-04-08C | 09/07/2004 | Florida Power & Light & Progress Energy - Florida Power Corporation: Tropical Storm Frances |
PNO-II-04-008B | 09/05/2004 | Florida Power Corporation: RII Response to Hurricane Frances |
PNO-II-04-008A | 09/03/2004 | Florida Power and Light Co.: Region II Response to Hurricane Frances |
PNO-II-04-008 | 09/02/2004 | Florida Power and Light Co.: Region II Response to Hurricane Frances |
PNO-IV-04-021A | 09/01/2004 | High Mountain Inspection Service, Inc.: Updated Information on a Potentail Radiation Overexposure of a Radiographer |
August | ||
PNO-III-04-012A | 08/23/2004 | Premcor Refining Group, Lima, OH: Radiation Exposure to Contract Workers (Update) |
PNO-IV-04-023 | 08/19/2004 | Department of Energy: Update on Report of Potential Leaking Shipping Containers |
PNO-III-04-012 | 08/19/2004 | Premcor Refining Group, Lima, OH: Radiation Exposure to Contract Workers |
PNO-IV-04-017A | 08/17/2004 | Humboldt Bay Power Plant Unit 3: Update of Previously Reported Missing fuel Rod Segments |
PNO-II-04-007B | 08/14/2004 | Progress Energy: Correction - Region II Response to Hurricane Charley |
PNO-II-04-007A | 08/14/2004 | Progress Energy: Update - Region II Response to Hurricane Charley |
PNO-II-04-007 | 08/14/2004 | Progress Energy: Region II Response to Hurricane Charley |
PNO-II-04-006A | 08/13/2004 | Progress Energy - Florida Power Corporation: Update - Region II Response to Hurricane Charley |
PNO-II-04-006 | 08/13/2004 | Progress Energy - Florida Power Corporation: Region II Response to Hurricane Charley |
PNO-III-04-011 | 08/12/2004 | Cardinal Health, Madison, WI: Iodine-131 Spill at Nuclear Pharmacy |
PNO-III-04-010 | 08/11/2004 | Nuclear Management Company/Palisades Nuclear Plant: Palisades Shut Down to Repair Control Rod Drive Mechanism Leakage |
PNO-III-04-009 | 08/09/2004 | Detroit Edison/Fermi Nuclear Power Station: Fermi Shuts Down to Repair Emergency Diesel Generator |
PNO-IV-04-022 | 08/06/2004 | Horace Gill (owner of scrap metal yard) Dumas, Arkansas: Discovery of Radioactive Device |
PNO-IV-04-021 | 08/05/2004 | High Mountain Inspection Service, Inc.: Potential Radiation Overexposure of a Radiographer |
PNO-III-04-008 | 08/04/2004 | FirstEnergy/Davis-Besse: Automatic Reactor Shutdown |
PNO-IV-04-020 | 08/02/2004 | Energy Northwest Columbia Generating Station: Automatic Reactor Scram with Two Control Rods Indicating Not Fully Inserted |
July | ||
PNO-IV-04-019 | 07/28/2004 | Colorado State University Fort Collins, Colorado: Stuck Irradiator Source |
PNO-IV-04-018 | 07/27/2004 | Department of Energy: Leak of Anhydrous Hydrofluoric Acide Gas Contained in Overpack Near NRC Licensed Facility |
PNO-III-04-007 | 07/20/2004 | Perry: Alert Declared Because of Malfunctioning Radiation Monitor |
PNO-IV-04-016 | 07/19/2004 | Schlumberger Technology Corporation: Potential Overexposure to Members of Public |
PNO-IV-04-017 | 07/16/2004 | Pacific Gas & Electric Company, Humbolt Bay Power Plant Unit 3: Notification of Fuel Inventory Discrepancy at Humbolt Bay |
June | ||
PNO-IV-04-015 | 06/30/2004 | Baker Hughes Oil Field Operations: Truck Fire Involving Byproduct Material |
PNO-IV-04-014 | 06/25/2004 | Department of Energy Idaho Operations Office: Leak of Anhydrous Hydrofluoric Acid Gas Cylinder near NRC Licensed Facility |
PNO-IV-04-013 | 06/24/2004 | Diablo Canyon Power Plant, Units 1 & 2: Fire in Protected Area Generated Media Interest |
PNO-IV-04-012B | 06/18/2004 | Palo Verde Generating Station, Units 1, 2, 3: Augmented Inspection Team (AIT) to Finish at Palo Verde |
PNO-II-04-004A | 06/14/2004 | Global Nuclear Fuels - Americas, LLC: Additional Information on the Transportation Accident Involving Shipment of Nuclear Fuel Assemblies |
PNO-IV-04-012 | 06/14/2004 | Palo Verde Nuclear Generating Station: Complete Loss of Offsite Power |
PNO-IV-04-012A | 06/14/2004 | Palo Verde Nuclear Generating Station: Augmented Inspection Team (AIT) Dispatched to Palo Verde |
PNO-II-04-004 | 06/08/2004 | Global Nuclear Fuels - Americas, LLC: Transportation Accident Involving Shipment of Nuclear Fuel Assemblies |
May | ||
PNO-II-04-003 | 05/24/2004 | Virginia Electric and Power Company: Surry Unit 2 Reactor Trip and Auxiliary Feedwater System Issues Causing a Unit Shutdown to Cold Shutdown |
PNO-IV-04-011 | 05/20/2004 | Scela, Inc. d/b/a Radiopharmacy of Boise: Contamination Events Due to Spill of Iodine-131 |
PNO-I-04-011B | 05/11/2004 | Baxter Healthcare Corporation: Augmented Inspection Team Onsite to Review Baxter Healthcare Event |
PN0-III-04-006 | 05/06/2004 | The Timken Company: Melted Cesium-137 Source at Steel Manufacturing Plant |
April | ||
PNO-I-04-011A | 04/30/2004 | Baxter Healthcare Corporation: Update to Unshielded Source Rack at Irradiator in Puerto Rico and Formation of an Augmented Inspection Team (AIT) |
PNO-III-04-005 | 04/23/2004 | Missouri Baptist Medical Center: Brachytherapy Medical Event |
PNO-I-04-011 | 04/23/2004 | Baxter Healthcare Corporation: Unshielded Source Rack at Irradiator in Puerto Rico |
PNO-II-04-001 | 04/14/2004 | Paducah Gaseous Diffusion Plant: Media Interest in Small Uranium Hexafluoride Leak |
PNO-I-04-010 | 04/14/2004 | Yankee Atomic Electric Company: Notification of Unusual Event |
March | ||
PNO-III-04-004 | 03/30/2004 | D. C. Cook: Shutdown of D.C. Cook Unit 1 for Greater than 72 Hours |
PNO-III-04-003 | 03/17/2004 | Davis-Besse Nuclear Power Plant: Shutdown of the Davis-Besse Nuclear Power Station Plant for Greater than 72 Hours |
PNO-I-04-008A | 03/12/2004 | St. Mary Hospital: Update to Potential Medical Event Involving a Prostate Seed Implant |
PNO-IV-04-009 | 03/02/2004 | Palo Verde Unit 3: Shutdown of Unit 3 for Greater than 72 Hours |
PNO-I-04-009 | 03/02/2004 | Yankee Atomic Electric Company: Spill of Low Level Radioactive Waste from Package While in Transit |
February | ||
PNO-IV-04-008 | 02/27/2004 | Altru Health System: Medical Event- Radiation Dose to an Unintended Site |
PNO-I-04-008 | 02/27/2004 | St. Mary Hospital: Potential Medical Event Involving a Prostate Seed Implant |
PNO-III-04-002 | 02/24/2004 | Joseph M. Keyzers: Damaged Gauge Caused by Fire |
PNO-I-04-007 | 02/24/2004 | University of Virginia: Lost Brachytherapy Source |
PNO-IV-04-007 | 02/20/2004 | Arizona Public Service Co., Palo Verde 2: Palo Verde Unplanned Reactor Shutdown to Exceed 72 Hours |
PNO-I-04-006 | 02/10/2004 | PMK Group, Inc.: Missing Sources from Damaged Portable Gauge |
PNO-I-04-005A | 02/10/2004 | Mercy Fitzgerald Hospital: Update to Medical Event Reported Following Identification of Leaking Iodine-125 Source(s) |
PNO-IV-04-006 | 02/05/2004 | Callaway Plant: Callaway Shutdown |
PNO-IV-04-005 | 02/04/2004 | Arizona Public Service Co.: Technical Specification Required Shutdown to Exceed 72 Hours |
PNO-I-04-005 | 02/02/2004 | Mercy Fitzgerald Hospital: Medical Event Reported Following Identification of Leaking Iodine-125 Source |
January | ||
PNO-IV-04-004 | 01/28/2004 | Taylor Forge Engineered Systems, Inc.: Potential Radiation Overexposure of a Radiographer |
PNO-IV-04-003 | 01/27/2004 | Southern California Edison: Unit 3 Shutdown to Repair a Letdown System Piping Leak |
PNO-I-04-004 | 01/27/2004 | Bowling Green Medical Center: Potential Occupational Extremity Overexposure During Intravascular Brachytherapy Treatment |
PNO-I-04-003 | 01/27/2004 | Industrial Services of America: Damaged Gauge Found at Scrap Yard |
PNO-III-04-001 | 01/20/2004 | Kewaunee Nuclear Station: Plant Shutdown Greater than 72 Hours and Initiation of NRC Special Inspection to Look into Plant Shutdown Due to Both Trains of Safety Injection System Declared Inoperable |
PNO-I-04-002 | 01/16/2004 | Commonwealth of Pennsylvania Department of Transportation (PennDot): Accident Involving Moisture/Density Gauge |
PNO-I-04-01A | 01/13/2004 | Onyx Greentree Landfill: Identification of the Radioactive Source Found at Landfill in Kersey, Pennsylvania |
PNO-I-04-01 | 01/12/2004 | Onyx Greentree Landfill: Radioactive Source Found at Landfill in Kersey, Pennsylvania |