Section | Title | Rev. | Date Updated |
---|---|---|---|
19.0 | Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors | Final Rev. 3 | 12/2015 |
Draft Rev. 3 | 11/2014 | ||
Draft Rev. 3 | 09/2012 | ||
Rev. 2 | 06/2007 | ||
Rev. 1 | 11/2002 | ||
Draft Rev. 1 | 06/2001 | ||
19.1 | Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities | Rev. 3 | 09/2012 |
Rev. 2 | 06/2007 | ||
Rev. 1 | 09/2006 | ||
Initial Issuance | 02/2004 | ||
19.2 | Review of Risk Information Used to Support Permanent Plant-Specific Changes to the Licensing Basis: General Guidance | Initial Issuance | 06/2007 |
19.3 | Regulatory Treatment of Non-Safety Systems (RTNSS) for Passive Advanced Light Water Reactors | Rev. 0 | 06/2014 |
Draft Rev. 0 | 07/2013 | ||
19.4 | Strategies and Guidance to Address Loss-of-Large Areas of the Plant Due to Explosions and Fires | Rev. 0 | 06/2015 |
Draft Rev. 0 | 05/2013 | ||
19.5 | Adequacy of Design features and functional capabilities identified and described for withstanding Aircraft Impacts | Rev. 0 | 04/2013 |