StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Steam and Power Conversion System (NUREG-0800,Chapter 10)
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Section | Title | Rev. | Date Updated |
---|---|---|---|
10.2 | Turbine Generator | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 04/1978 | ||
Rev. 0 | 11/1975 | ||
10.2.3 | Turbine Rotor Integrity | Rev. 2 | 03/2007 |
Draft Rev. 2 | 06/1996 | ||
Rev. 1 | 07/1981 | ||
Rev. 0 | 11/1975 | ||
10.3 | Main Steam Supply System | Rev. 4 | 03/2007 |
Draft Rev. 4 | 06/1996 | ||
Rev. 3 | 04/1984 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 04/1978 | ||
Rev. 0 | 11/1975 | ||
10.3.6 | Steam and Feedwater System Materials | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 04/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.1 | Main Condensers | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 04/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.2 | Main Condenser Evacuation System | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 07/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.3 | Turbine Gland Sealing System | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 07/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.4 | Turbine Bypass System | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 04/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.5 | Circulating Water System | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 03/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.6 | Condensate Cleanup System | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 03/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.7 | Condensate and Feedwater System | Rev. 4 | 03/2007 |
Draft Rev. 4 | 06/1996 | ||
Rev. 3 | 04/1984 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 03/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.8 | Steam Generator Blowdown System (PWR) | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 07/1978 | ||
Rev. 0 | 11/1975 | ||
10.4.9 | Auxiliary Feedwater System (PWR) | Rev. 3 | 03/2007 |
Draft Rev. 3 | 06/1996 | ||
Rev. 2 | 07/1981 | ||
Rev. 1 | 04/1978 | ||
Rev. 0 | 11/1975 | ||
Branch Technical Positions (BTPs) | |||
BTP 10-1 | Design Guidelines for Auxiliary Feedwater System Pump Drive and Power Supply Diversity for Pressurized Water Reactor Plants (Former Section 10.4.9 BTP has been separated into an individual section.) | Rev. 3 | 03/2007 |
BTP 10-2 | Design Guidelines for Avoiding Water Hammers in Steam Generators (Former Section 10.4.7 BTP has been separated into an individual section.) | Rev. 4 | 03/2007 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021