Publications Available in the Agencywide Documents Access and Management System (ADAMS) – 2025
Documents added in 2025 | |||
---|---|---|---|
V = Volume | N = Number | R = Revision | P = Part | S = Supplement | Ch = Chapter | Add = Addendum | Sec = Section | DFC = Draft For Comment | |||
PUBLICATION NUMBER |
TITLE | DATE OF PUBLICATION |
ADAMS ACCESSION NUMBER |
NUREG-1437, S23 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 23, Second Renewal Regarding Subsequent License Renewal for Point Beach Nuclear Plant Units 1 and 2 | August 2025 | ML25191A238 |
NUREG-1437, S63 |
Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 63 Regarding License Renewal for Clinton Power Station, Unit 1 | August 2025 | ML25212A224 |
NUREG-1478, R3, DFC | Operator Licensing Examiner Standards for Research and Test Reactors | July 2025 | ML25199A236 |
NUREG/CR-7306, R1 | Fuel Assembly and Irradiation Parametric Study for Extended-Enrichment and High-Burnup Light-Water Reactor Spent Nuclear Fuel in Dry Storage Casks and Transportation Packages | July 2025 | ML25206A004 |
NUREG/CR-7312 | Irradiation Effects on Reinforced Concrete Structures – Experimental and Analytical Study on Irradiated Concrete – Steel Bonding, Modeling and Simulation of Structural Response | July 2025 | ML25210A564 |
NUREG/IA-0557 | TRACE Nodalization Performance in PSB-VVER SB-LOCA Benchmark | July 2025 | ML25202A011 |
NUREG-2221, S1 | Technical Bases for Changes in the Subsequent License Renewal Guidance Documents, NUREG–2191, Revision 1, and NUREG–2192, Revision 1, Supplement 1 - Final Report | July 2025 | ML25113A024 |
NUREG-2192, R1 | Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants– Final Report | July 2025 | ML25113A023 |
NUREG-2191, R1, V2 | Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report – Final Report | July 2025 | ML25113A022 |
NUREG-2191, R1, V1 | Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report – Final Report | July 2025 | ML25113A021 |
NUREG-0713, V45 | Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2023: Fifty-Sixth Annual Report | July 2025 | ML25191A324 |
NUREG/CR-6471, V1 | Characterization of Flaws in U.S. Reactor Pressure Vessels: Density and Distribution in Flaw Indication in PVRUF | November 1998 | ML20199L413 |
NUREG/CR-7310 | Spent Fuel Storage and Transportation of Accident Tolerant Concepts: Cr-Coated Zirconium Alloy Cladding, FeCrAl Cladding, High Burnup and High Enrichment Fuel | June 2025 | ML25174A009 |
NUREG/IA-0542 | Multi-Scale Coupling of Trace and TrioCFD with the Interface for CodeCoupling (ICoCo) |
June 2025 |
ML25163A061 |
NUREG-1437, S62 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 62 Regarding License Renewal of Diablo Canyon Nuclear Power Plant, Units 1 and 2, Final Report | June 2025 | ML25156A357 |
NUREG/IA-0556 | TRACE/RELAP5 Calculation of NPP Krško SGTR Accident Under Realistic and SRP Conditions | June 2025 | ML25163A053 |
NUREG/IA-0552 | Analysis of CRDM Nozzle Break at the ATLAS Facility with 3D Components in MARS-KS and TRACE | June 2025 | ML25163A045 |
NUREG/IA-0551 | Assessments of 3D Components in System Codes Against Separate Effect Tests | June 2025 | ML25128A007 |
NUREG-1100, V41 | Congressional Budget Justification: Fiscal Year 2026 | June 2025 | ML25160A154 |
NUREG-0090, V47 | Report to Congress on Abnormal Occurrences Fiscal Year 2024 | May 2025 | ML25150A343 |
NUREG-1437, S17, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Dresden Nuclear Power Station, Units 2 and 3 - Draft Report for Comment | May 2025 | ML25132A151 |
NUREG-1437, S21 Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal of Browns Ferry Nuclear Power Plant, Units 1, 2, and 3 - Draft Report for Comment | May 2025 | ML25133A156 |
NUREG-1437, S10, Second Renewal, S1, DFC | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 - Draft Report for Comment | May 2025 | ML25111A147 |
NUREG-1437, S15, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Virgil C. Summer Nuclear Station - Final Report | May 2025 | ML25128A160 |
NUREG-0980, V1, N12 | Nuclear Regulatory Legislation: 117th Congress; 2nd Session | April 2025 | ML25120A424 |
NUREG-1437, S61 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Perry Nuclear Power Plant, Final Report | April 2025 | ML25113A032 |
NUREG/CR-7311 | Determination of Bias and Bias Uncertainty for Criticality Safety Computational Methods | April 2025 | ML25120A337 |
NUREG-0711, R2 | Human Factors Engineering Program Review Model | February 2004 | ML040770540 |
NUREG-0711, R1 | Human Factors Engineering Program Review Model | May 2002 | ML021560629 |
NUREG-0711, R0 | Human Factors Engineering Program Review Model | June 1996 | ML20072D914 |
NUREG-0700, R1, V3 | Human-System Interface Design Review Guideline: Review Software and User's Guide | June 1996 | ML20134N403 |
NUREG-0700, R1, V2 | Human-System Interface Design Review Guideline: Reviewer’s Checklist | June 1996 | ML20134N356 |
NUREG-0700, R1, V1 | Human-System Interface Design Review Guideline: Process and Guidelines | June 1996 | ML20134N366 |
NUREG-0700, R0 | Guidelines for Control Room Design Reviews | September 1981 | ML20010H660 |
NUREG-0750, V100 | Nuclear Regulatory Commission Issuances, July 1, 2024 - December 31, 2024 | April 2025 | ML25111A263 |
NUREG-1437, S23, Second Renewal, DFC | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Point Beach Nuclear Plant, Units 1 and 2 - Draft Report for Comment | April 2025 | ML25069A710 |
NUREG-1437 S63, DFC | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal for Clinton Power Station, Unit 1 – Draft Report for Comment | April 2025 | ML25072A105 |
NUREG/CR-7308 | Sensitivity/Uncertainty Methods for Nuclear Criticality Safety Validation | April 2025 | ML25099A002 |
NUREG-1379, R4 | NRC Editorial Style Guide | April 2025 | ML25098A236 |
NUREG/CR-7309 | Validation Studies for High Burnup and Extended Enrichment Fuels in Burnup Credit Criticality Safety Analyses | April 2025 | ML25093A004 |
NUREG/BR-0254, R14 | Payment Methods | March 2025 | ML25072A290 |
NUREG-1482, DFC, R4 | Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants - Draft Report for Comment | February 2025 | ML24277A142 |
NUREG-1350, V35 | Information Digest, 2024–2025 | February 2025 | ML25051A094 |
NUREG-0750, 83 – 92, Indexes |
Nuclear Regulatory Commission Issuances, NRCI Indexes, January 2016 through December 2020 | February 2025 | ML25052A232 |
NUREG/BR-0533 | Atomic Fission: The Breakup of the Atomic Energy Commission and the Energy Reorganization Act of 1974 | February 2025 | ML25044A364 |
NUREG/IA-0555 | Kuosheng BWR Decommissioning SBO Analysis with RELAP5/MOD 3.3 | February 2025 | ML25043A358 |
NUREG/IA-0554 | TRACE simulations of LOCAs Together with the Complete Loss of One Emergency Core Cooling Function in Two-Loop PWR | February 2025 | ML25042A074 |
NUREG-1830, V21 | Office of Investigations Annual Report Fiscal Year 2024 | February 2025 | ML25041A010 |
NUREG/BR-0531, R1 | NRC Safeguards Information Program: Helpful Resources for Applicants and Preapplicants | February 2025 | ML25038A063 |
NUREG-1307, R20 | Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities — Final Report | February 2025 | ML25037A226 |
NUREG-1437, S2, Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Oconee Nuclear Station Units 1, 2, and 3 - Final Report | January 2025 | ML25031A307 |
NUREG-1028 | Ruptured Cesium-137 Well-Logging Source at Shelwell Services, Inc., Hebron, Ohio | April 1984 | ML20090J115 |
NUREG/IA-0553 | Study on the Effect of Dissolved Air During Hydroaccumulator Injection | January 2025 | ML25015A134 |
NUREG/BR-0532 | NRC Facility Security Clearance Program: Helpful Resources For Licensees, Applicants, And Other Entities | January 2025 | ML25010A266 |
Page Last Reviewed/Updated Monday, August 18, 2025
Page Last Reviewed/Updated Monday, August 18, 2025