Publications Available in the Agencywide Documents Access and Management System (ADAMS) – 2024
Documents added in 2024 | |||
---|---|---|---|
V = Volume | N = Number | R = Revision | P = Part | S = Supplement | Ch = Chapter | Add = Addendum | Sec = Section | DFC = Draft For Comment | |||
PUBLICATION NUMBER |
TITLE | DATE OF PUBLICATION |
ADAMS ACCESSION NUMBER |
NUREG/CR-6393 | Integrated System Validation: Methodology and Review Criteria | January 1997 | ML20134E396 |
NUREG-1437, S15, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Virgil C. Summer Nuclear Station - Draft Report for Comment | November 2024 | ML24330A271 |
NUREG-2255 | Guidance for Conducting Expert Elicitation in Risk-Informed Decisionmaking Activities | November 2024 | ML24325A566 |
NUREG-1437, S26, Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Monticello Nuclear Generating Plant, Unit 1 – Final Report | November 2024 | ML24309A221 |
NUREG-2220, V8 | Fiscal Year 2024 – Agency Financial Report | November 2024 | ML24319A274 |
NUREG/IA-0550 | Modelling Guidelines for CCFL Representation During IBLOCA Scenarios of PWR Reactors | October 2024 | ML24297A297 |
NUREG-0713, V44 | Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2022: Fifty-Fifth Annual Report | October 2024 | ML24303A136 |
NUREG-1437 S62 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Diablo Canyon Nuclear Power Plant, Units 1 and 2, Draft Report for Comment | October 2024 | ML24299A167 |
NUREG/BR-0254, R13 | Payment Methods | October 2024 | ML24297A632 |
NUREG-2249, DFC | Generic Environmental Impact Statement for Licensing of New Nuclear Reactors – Draft Report for Comment | September 2024 | ML24176A220 |
NUREG-1885, R17 | Report to Congress on the Security Inspection Program for Operating Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update - Annual Report for Calendar Year 2023 | September 2024 | ML24254A418 |
NUREG-1022, R3, S2 | Event Report Guidelines 10 CFR 50.72(b)(3)(ii) and 10 CFR 50.73(a)(2)(ii) – Final Report | September 2024 | ML24191A376 |
NUREG-1437, S61, DFC | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Perry Nuclear Power Plant, Draft Report for Comment | August 2024 | ML24241A256 |
NUREG/BR-0096, R2 | Instructions and Guidance for Completing Physical Inventory Summary Reports (NRC Form 327) - Final Report | October 2023 | ML23303A221 |
NUREG-1601 | Chemical Process Safety at Fuel Cycle Facilities | August 1997 | ML20210J626 |
NUREG/IA-0546 | Assessment of a PWR Control Rod Drop Transient with 3D Neutronic-Thermalhydraulic Coupled Codes RELAP5/ PARCSv2.7 and TRACEv5.0P3/PARCSv3.0 | August 2024 | ML24219A108 |
NUREG/BR-0175, R3 | A Short History of Nuclear Regulation, 1946–2024 | July 2024 | ML24211A051 |
NUREG-1555, S1, R2 | Standard Review Plans for Environmental Reviews for Nuclear Power Plants - Supplement 1: Operating License Renewal — Final Report | August 2024 | ML23201A227 |
NUREG-1437, V3, R2 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Appendices B – J — Final Report | August 2024 | ML24086A528 |
NUREG-1437, V2, R2 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Appendix A — Final Report | August 2024 | ML24086A527 |
NUREG-1437, V1, R2 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Main Report — Final Report | August 2024 | ML24086A526 |
NUREG-2266 | Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels – Final Report | July 2024 | ML24207A210 |
NUREG-2267 | NRCDose3 Code, Version 1.1.4: User Guide and Technical Manual | July 2024 | ML24207A225 |
NUREG-1437, S7a, Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plant: Regarding Subsequent License Renewal for North Anna Power Station Units 1 and 2 – Final Report | July 2024 | ML24204A104 |
NUREG/IA-0549 | Maanshan PWR FLEX Program Enhance with RELAP5/MOD 3.3 | July 2024 | ML24198A227 |
NUREG/BR-0531 | U.S. Nuclear Regulatory Commission Safeguards Information Program: Helpful Resources for Applicants and Preapplicants | June 2024 | ML24176A197 |
NUREG/KM-0019 | Technical and Regulatory Bases for Regulatory Guide 1.236, PWR Control Rod Ejection and BWR Control Rod Drop Accidents | June 2024 | ML24176A124 |
NUREG/CR-7267 | Default Parameter Values and Distribution in RESRAD-ONSITE V7.2, RESRAD-BUILD V3.5, and RESRAD-OFFSITE V4.0 Computer Codes | June 2024 | ML24173A152 |
NUREG/BR-0254, R12 | Payment Methods | June 2024 |
ML24166A288 |
NUREG/CR-7307 | Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized- and Boiling-Water Reactors | May 2024 | ML24155A058 |
NUREG-2180, S1 | Determining the Effectiveness, Limitations, and Operator Response for Very Early Warning Fire Detection Systems in Nuclear Facilities – Update to Event Tree Parameters (Alpha and Pi) and Integration of NUREG-2230 Methods – Final Report | May 2024 | ML24143A010 |
NUREG-1556, V2, R1, S1 | Program-Specific Guidance About Industrial Radiography Licenses | May 2024 | ML24134A269 |
NUREG/CR-2907, V27 | Radioactive Effluents from Nuclear Power Plants: Annual Report 2021 | May 2024 | ML24134A119 |
NUREG/IA-0539 | New Functionality of TRACE: The 3D Post-Processing for the VESSEL Component in SALOME Platform | May 2024 | ML24122A809 |
NUREG/CR-7306 | Fuel Assembly and Irradiation Parametric Study for Extended-Enrichment and High-Burnup Light-Water Reactor Spent Nuclear Fuel in Dry Storage Casks and Transportation Packages | April 2024 | ML24114A120 |
NUREG-0090, V46 | Report to Congress on Abnormal Occurrences, Fiscal Year 2023 | April 2024 | ML24121A231 |
NUREG-1437 S26 Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Monticello Nuclear Generating Plant, Unit 1 – Draft Report for Comment | April 2024 | ML24102A276 |
NUREG-1437, S60 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Comanche Peak Nuclear Power Plant, Final Report | April 2024 | ML24078A261 |
NUREG-1022, R3, S2, DFC | Event Report Guidelines 10 CFR 50.72(b)(3)(ii) and 10 CFR 50.73(a)(2)(ii) – Draft Report for Comment | April 2024 | ML24102A280 |
NUREG/IA-0547 | Uncertainty and Sensitivity Analysis of Hot Leg LOCA in Two-Loop PWR Using RELAP5 Version 3.3lj | April 2024 | ML24103A191 |
NUREG/IA-0548 | Assessment of TRACE V5.0 Patch 7 Using OECD-ATLAS2 B3.2 Test | April 2024 | ML24101A103 |
NUREG-1437, S6, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Surry Power Station Units 1 and 2 – Final Report | April 2020 | ML20071D538 |
NUREG-1437, S5a, Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report | March 2024 | ML24087A061 |
NUREG/IA-0544 | RELAP5, TRACE and APROS Model Benchmark for the IAEA SPE-2 Experiment | March 2024 | ML24082A018 |
NUREG-1437, S60, DFC | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Comanche Peak Nuclear Power Plant, Draft Report for Comment | October 2023 | ML23299A252 |
NUREG/IA-0545 | Post-Test Analysis of PKL III Test H2.2 Run 2 (SBO) with TRACE | March 2024 | ML24075A100 |
NUREG-1437, S10, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3, Final Report | January 2020 | ML20023A937 |
NUREG/CR-3331 | A Methodology for Allocating Nuclear Power Plant Control Nuclear to Human or Automatic Control | August 1983 | ML20024E954 |
NUREG-1100, V40 | U.S. NRC Congressional Budget Justification Fiscal Year 2025 | March 2024 | ML24061A093 |
NUREG-0713, V43 | Occupation Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2021: Fifty-Fourth Annual Report | February 2024 | ML24060A017 |
NUREG-1650, R8, S1 | Answers to Questions From the Peer Review By Contracting Parties on the United States of America Ninth National Report For the Convention on Nuclear Safety | February 2024 | ML24058A267 |
NUREG-1650, R7, S1 | Updated Recommendations Related to Spent Fuel Transport and Dry Storage Shielding Analyses |
February 2024 | ML24058A128 |
NUREG/BR-0297, R1 | NRC Public Meetings | February 2024 | ML24059A221 |
NUREG-2250, V3 | Annual Evaluation Plan: Fiscal Year 2025 | February 2024 | ML24059A451 |
NUREG-1830, V20 | Office of Investigations Annual Report Fiscal Year 2023 | February 2024 | ML24052A308 |
NUREG-0410 | NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants | January 1978 | ML20062G769 |
NUREG-1437, S2, Second Renewal, DFC | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Oconee Nuclear Station Units 1, 2, and 3 - Draft Report for Comment | February 2024 | ML24033A298 |
NUREG/CR-7302, R1 | Updated Recommendations Related to Spent Fuel Transport and Dry Storage Shielding Analyses | February 2024 | ML24031A600 |
NUREG/BR-0280, R2 | Regulating Nuclear Fuel | January 2024 | ML24031A358 |
NUREG-2191, V2, R1 | Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | January 2024 | ML24026A234 |
NUREG-2194, V1, R1 | Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 1: Specifications | January 2024 | ML24026A214 |
NUREG-1456 | An Alternative Format for Category I Fuel Cycle Facility Physical Protection Plans | June 1992 | ML20101K045 |
NUREG-1322 | Acceptance Criteria for the Evaluation of Category I Fuel Cycle Facility Physical Security Plans | October 1991 | ML20085G840 |
Page Last Reviewed/Updated Tuesday, January 14, 2025
Page Last Reviewed/Updated Tuesday, January 14, 2025