Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Regulatory Issue Summaries - 2013

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
RIS-13-19 Removal of Safeguards Information Designation from Attachment 2 to Order EA-02-261, "Order for Compensatory Measures Related to Access Authorization" -- 12/13/2013 --
RIS-13-18 Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs W 81 FR 73448
10/25/2016
--
-- 11/15/2013 --
RIS-13-17 Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown -- 10/17/2013 --
RIS-13-16 Interactions Between the NRC and NRC Stakeholders During a Lapse of Agency Appropriations W 82 FR 27085
06/13/2017
05/17
S1 10/09/2013 --
W 82 FR 27085
06/13/2017
05/17
-- 10/01/2013 --
RIS-13-15 Not Issued -- -- --
RIS-13-14 Reporting Transactions Involving Temporary Jobsites to the National Source Tracking System -- 09/11/2013 --
RIS-13-13 Not Issued -- -- --
RIS-13-12 Notice Of Issuance Of Enforcement Guidance Memorandum – Interim Guidance For Dispositioning Violations Involving 10 CFR 35.60 And 10 CFR 35.63 For The Calibration Of Instrumentation To Measure The Activity Of Rubidium-82 And The Determination Of Rubidium-82 Patient Dosages -- 08/23/2013 --
RIS-13-11 Resolution of Licensing Process Expectations for Pressurized Water Reactor Fuel Assemblies Susceptible to Top Nozzle Stress Corrosion Cracking in Dry Cask Spent Fuel Storage and Transportation -- 09/04/2013 --
RIS-13-10 Permanent Implant Brachytherapy Medical Event Reporting Under 10 CFR Part 35 -- 07/30/2013 --
RIS-13-09 Guidelines for Effective Prevention and Management of System Gas Accumulation -- 08/23/2013 --
RIS-13-08 Process For Scheduling Acceptance Reviews Of New Reactor Licensing And Design Certification Applications And Process For Determining Budget Needs For Fiscal Year 2016 W 81 FR 73448
10/25/2016
--
-- 05/28/2013 --
RIS-13-07 NRC Staff Position On The Use of American Society Of Mechanical Engineers Certification Mark -- 05/28/2013 --
RIS-13-06 Preparation and Scheduling of Operator Licensing Examinations W 81 FR 31969
05/20/2016
--
  06/07/2013
RIS-13-05 NRC Position on the Relationship between General Design Criteria and Technical Specification Operability -- 05/09/2013 --
RIS-13-04 Content Specification and Shielding Evaluation for Type B Transportation Packages -- 04/23/2013 --
RIS-13-03 Pre-Application Communication and Scheduling for Medical Radioisotope Facilities Intending to Produce Molybdenum-99 -- 04/24/2013 --
RIS-13-02 Impact of Sequestration on NRC Activities and NRC Stakeholders -- 03/01/2013 --
RIS-13-01 Use Of Aftermarket Sealed Sources Registered Under 10 CFR 32.210 -- 03/12/2013 --

To top of page

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021