Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Regulatory Issue Summaries - 2004

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
RIS-04-20 Lessons Learned from Review of 10 CFR Parts 71 and 72 Applications -- 12/16/2004 --
RIS-04-19 Authorized Nuclear Inservice Inspector Access and NRC Approved Alternatives to ASME Code -- 12/10/2004 --
RIS-04-18 Expiration Date for 10 CFR Part 71 Quality Assurance Program Approvals -- 12/01/2004 --
RIS-04-17 Revised Decay-In-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material 1 09/27/2005 --
-- Not Issued --
RIS-04-16 Use of Later Editions and Addenda to ASME Code Section XI for Repair/Replacement Activities -- 10/19/2004 --
RIS-04-15 Emergency Preparedness Issues: Post-9/11 S1 05/25/2006 --
-- 10/18/2004 --
RIS-04-14 Focusing Resources in the Office of Nuclear Reactor Regulation as a result of review of Security Plan Changes -- 09/20/2004 --
RIS-04-13 Consideration of Sheltering in Licensee's Range of Protective Action Recommendations S1 03/10/2005 --
-- 08/02/2004 --
RIS-04-12 Clarification on use of Later Editions and Addenda to the ASME OM Code and Section XI -- 07/28/2004 --
RIS-04-11 Supporting Information Associated with Requests for Withholding Proprietary Information -- 06/29/2004 --
RIS-04-10 Preparation and Scheduling of Operator Licensing Examinations W 81 FR 31969
05/20/2016
--
  06/14/2004
RIS-04-09 Status on Deferral of Active Regulation of Ground-Water Protection at in SITU Leach Uranium Extraction Facilities -- 06/07/2004 --
RIS-04-08 Results of the License Termination Rule Analysis -- 05/28/2004 --
RIS-04-07 Release of Final Review Standard (RS)-002, "Processing Applications for Early Site Permits" -- 05/19/2004 --
RIS-04-06 Independent Survey of Power Reactor Licensees -- 04/16/2004 --
RIS-04-05 Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power -- 04/15/2004 --
RIS-04-04 Use of Code Cases N-588, N-640, and N-641 in Developing Pressure-Temperature Operating Limits -- 04/05/2004 --
RIS-04-03 Risk-Informed Approach for Post-Fire Safe-Shutdown Circuit Inspections 1 12/29/2004 --
-- Not Issued --
RIS-04-02 Deferral of Active Regulation of Ground-Water Protection at In Situ Leach Uranium Extraction Facilities -- 02/23/2004 --
RIS-04-01 Method for Estimating Effective Dose Equivalent from External Radiation Sources Using Two Dosimeters W 81 FR 73448
10/25/2016
--
-- 02/17/2004 --

To top of page

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021