| Date |
Title |
| 02/16/1988 |
ACRS Comments On SECY-87-314, Interim Policy Statement On Maintenance Of Nuclear Power Plants, Dated December 30, 1987 |
| 02/16/1988 |
ACRS Comments On Development Of A Method To Establish Priorities For Research Activities |
| 02/17/1988 |
ACRS Comments On Selected FY 1988 NRC Radioactive Waste Management Research Programs |
| 02/17/1988 |
Letter to Honorable George H. W. Bush, President of the Senate |
| 02/19/1988 |
ACRS Report On The Tennessee Valley Authority's Management Reorganization |
| 03/15/1988 |
ACRS Comments On the Need For Greater Coherence Among New Regulatory Policies |
| 03/15/1988 |
ACRS Reports On The Restart Of The Sequoyah Nuclear Plant |
| 03/15/1988 |
ACRS Comments On Embrittlement Of Structural Steel |
| 03/15/1988 |
ACRS Comments On Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement Of Reactor Vessel Materials" Dated March 1988 |
| 04/12/1988 |
Program To Implement The Safety Goal Policy --ACRS Comments |
| 04/12/1988 |
Effectiveness Of Programs Relating To Generic And Unresolved Safety Issues -- ACRS Comments |
| 04/12/1988 |
Proposed Resolution Of USI A-47, "Safety Implications Of Control Systems"--ACRS Comments |
| 04/12/1988 |
ACRS Review Of Shutdown Nuclear Power Plants |
| 04/12/1988 |
Updated Policy Statement On Training And Qualification Of Nuclear Power Plant Personnel--ACRS Comments |
| 04/12/1988 |
ACRS Waste Management Subcommittee Report On Q-List Technical Position |
| 04/13/1988 |
Proposed Rule On Fitness For Duty Program --ACRS Comments |
| 05/10/1988 |
Proposed Generic Letter On Individual Plant Examinations And The Proposed Integrated Safety Assessment Program II |
| 05/10/1988 |
Proposed Commission Policy Statement On The Professional Conduct Of Nuclear Power Plant Operators (SECY-88-57) |
| 05/10/1988 |
Proposed Revision Of The ECCs Rule Contained In 10 CFR 50.46 And Appendix K |
| 05/10/1988 |
Fire Risk Scoping Study |
| 05/10/1988 |
Revision 2 To Regulatory Guide 1.100, "Seismic Qualification Of Electric And Mechanical Equipment for Nuclear Power Plants" |
| 06/07/1988 |
NRC Research Related To Heat Transfer And Fluid Transport In Nuclear Power Plants |
| 06/07/1988 |
NRC Proposed Rule On Early Site Permits, Standard Design Certification, And Combined Licenses For Nuclear Power Reactors |
| 06/07/1988 |
Proposed Revisions Of 10 CFR 20, "Standards For Protection Against Radiation" |
| 06/07/1988 |
Inservice Inspection Of Boiling Water Reactor Pressure Vessels |
| 06/07/1988 |
Rulemaking On Emergency Planning And Preparedness |
| 06/07/1988 |
The Babcock & Wilcox Owners Group Safety And Performance Improvement Program |
| 06/07/1988 |
Proposed Priority Rankings Of Generic Issues: Fifth Group |
| 07/20/1988 |
Comments On The NRC Staff's Draft Safety Evaluation Of The Westinghouse Topical Report, WCAP-10924, "Westinghouse Large-Break LOCA Best-Estimate Methodology" |
| 07/20/1988 |
Report On Key Licensing Issues Associated With DOE Sponsored Reactor Designs |
| 07/20/1988 |
Report On Proposed Revised Policy Statement On Nuclear Power Plant Staff Working Hours |
| 07/20/1988 |
Report On The Integration Plan For Closure Of Severe Accident Issues (SECY-88-147) |
| 08/16/1988 |
Proposed Resolution Of USI A-17, "Systems Interactions In Nuclear Power Plants" |
| 08/16/1988 |
Proposed Resolution Of USI A-47, "Safety Implications Of Control Systems" |
| 08/16/1988 |
Report On NUREG-1150, "Reactor Risk Reference Document" |
| 09/13/1988 |
NRC Staff's TVA Lessons Learned Effort |
| 09/13/1988 |
Proposed Rulemaking Related To Maintenance Of Nuclear Power Plants |
| 09/13/1988 |
Proposed Resolution Of Unresolved Issue 99, "Improved Reliability Of RHR Capability In PWRs" |
| 09/14/1988 |
Proposed Restart Of The Pilgrim Nuclear Power Station |
| 09/14/1988 |
Proposed Resolution Of Unresolved Safety Issue A-45, "Shutdown Decay Heat Removal Requirements" |
| 10/11/1988 |
ACRS Action On The Proposed Amendment Of CFR 50, Appendix J, "Primary Containment Leakage Testing For Water-Cooled Power Reactors" |
| 10/13/1988 |
Preapplication Safety Evaluation Report For The Modular High Temperature Gas Cooled Reactor |
| 10/13/1988 |
Licensing Of All Chemical Isotope Enrichment, Inc. Facilities |
| 11/22/1988 |
Safety Evaluation Report For The "Power Reactor Inherently Safe Module" (PRISM) Design |
| 11/22/1988 |
ACRS Action On Proposed Regulatory Guide 1.9, Revision 3, "Selection, Design, Qualification, Testing, And Reliability Of Diesel Generator Units As Onsite Electric Power Systems At Nuclear Power Plants" |
| 11/22/1988 |
ACRS Action On Proposed Regulatory Guide, Task No. EE-006-5, "Qualification Of Safety-Related Lead Storage Batteries For Nuclear Power Plants" |
| 12/20/1988 |
Equipment Qualification-Risk Scoping Study |