| Date |
Title |
| 12/20/1983 |
ACRS Report On The Decentralization Of NRC Regulatory Activities |
| 12/19/1983 |
ACRS Comments On The NRC Staff Requirements For Reinspection Of BWR |
| 12/19/1983 |
ACRS Action On Revision 1 To Proposed Regulatory Guide 1.89 On Environmental Qualification Of Electric Equipment |
| 12/19/1983 |
ACRS Report On Training and Qualification Of Nuclear Power Plant Personnel |
| 12/19/1983 |
ACRS Action On Rev. 1 To Proposed Reg. Guide 1.89 |
| 12/19/1983 |
ACRS Report On The Proposed Addition Of A Human Factors Criterion To 10 CFR 50, Appendix A |
| 11/22/1983 |
Report on the Expanded Systematic Evaluation Program Integrated Plant Safety Assessment of the Big Rock Point Plant. |
| 11/22/1983 |
ACRS Action On Reg. Guide 1.105, Rev. 2, Instrument Setpoints For Safety-Related Systems. |
| 11/22/1983 |
Generic Issue B-10, Hydrodynamic Loads On Mark III Containment Structures. |
| 10/18/1983 |
Need For Rapid Depressurization Capability In Newer Combustion Engineering, Inc. Plants. |
| 10/18/1983 |
ACRS Interim Report Related to the Operating License Application for the Limerick Generating Station, Units 1 and 2 |
| 10/18/1983 |
Severe Accident Decisions for Existing Nuclear Power Plants. |
| 10/18/1983 |
ACRS Comments On The NRC Integrated Program For The Resolution Of Unresolved Safety Issues |
| 10/17/1983 |
ACRS Comments On Use Of The TAU Effect At The Diablo Canyon Nuclear Power Plant. |
| 09/07/1983 |
ACRS Review Of NRC Staff Resolution For Unresolved Safety Issues. |
| 09/06/1983 |
Letter To Honorable Victor Gilinsky. |
| 09/06/1983 |
ACRS Report On The Proposed Insider Safeguards Rules |
| 09/02/1983 |
ACRS Report On Training and Qualification Of Nuclear Power Plant Personnel |
| 09/02/1983 |
ACRS Report On The Severe Accident Policy. |
| 08/16/1983 |
ACRS Comments OnThe Prioritization Of Generic Safety Issues. |
| 08/09/1983 |
ACRS Report On The Rule Concerning Fitness For Duty Of Nuclear Power Plant Personnel. |
| 08/09/1983 |
ACRS Report On a Proposed Rule Requiring On-Shift Engineering Expertise |
| 08/09/1983 |
ACRS Report On Flaw Evaluation Procedures For BWR Pipe Cracks |
| 08/09/1983 |
Revisions To Operational Controls For The Shipment Of Small Quantities Of Plutonium Using the PAT-2 Package |
| 07/15/1983 |
Additional ACRS Comments On The Prioritization Of Generic Issues |
| 07/15/1983 |
ACRS Report On The Proposed Final Rule On Anticipated Transients Without Scram |
| 07/14/1983 |
ACRS Comments On USI A-17, Systems Interaction |
| 07/13/1983 |
ACRS Comments On The NRC Staff Proposal For Resolution Of USI A-44 Station Blackout |
| 07/12/1983 |
Proposed Integrated Safety Assessment Program (ISAP) |
| 07/11/1983 |
ACRS Comments On The NRR Pilot Program For Decentralization Of Operating Reactor Licensing Activities. |
| 06/20/1983 |
ACRS Comments On The Prioritization Of Generic Issues. |
| 06/16/1983 |
Comments On the NRC Safety Research Program Budget For Fiscal Years 1985 And 1986. |
| 06/15/1983 |
ACRS Report Related To The Final Design Approval Of The GESSAR II BWR-6 Nuclear Island Design. |
| 06/14/1983 |
Fracture Mechanics Approach To Pipe Failure. |
| 05/18/1983 |
ACRS Report On The Accident Sequence Precursor Study And The Use Of Operational Experience. |
| 05/17/1983 |
ACRS Subcommittee Report On Control Room Habitability. |
| 05/17/1983 |
ACRS Report on the Systematic Evaluation Program Review of the La Crosse Boiling Water Reactor. |
| 05/17/1983 |
ACRS Report on the Systematic Evaluation Program Review of the Haddam Neck Plant. |
| 05/16/1983 |
ACRS Report On Regionalization. |
| 05/16/1983 |
ACRS Report On The Proposed Final Rules On Immediate Notification Requirements (10 CFR 50.72) and (10 CFR 50.73). |
| 05/16/1983 |
ACRS Action On Proposed Regulatory Guide On Instrument Sensing Lines (Task No. IC 126-5). |
| 04/29/1983 |
Survivability Of Safety-Related Equipment. |
| 04/19/1983 |
ACRS Report on the Systematic Evaluation Program Review of the Yankee Nuclear Power Station. |
| 04/19/1983 |
ACRS Report on Low Power Operation of the Seabrook Station, Units 1 and 2. |
| 04/19/1983 |
ACRS Report on the Clinch River Breeder Reactor Plant. |
| 04/19/1983 |
ACRS Comments On Regionalization Of NRC Staff Activities. |
| 03/16/1983 |
ACRS Comments Regarding Potential Pipe Break Effects On Control Rod Drive. |
| 03/15/1983 |
ACRS Report on the Catawba Nuclear Station, Units 1 and 2. |
| 02/16/1983 |
ACRS Report on the Skagit-Hanford Nuclear Project, Units 1 and 2. |
| 01/11/1983 |
Quantification Of Seismic Design Margins. |
| 01/11/1983 |
ACRS Report On The Proposed Generic Safety Issues Prioritization Methodology. |
| 01/11/1983 |
ACRS Action On Regulatory Guides. |
| 01/11/1983 |
Clarification - ACRS Report on the Systematic Evaluation Program Review of the Millstone N P S, Unit 1. |
| 01/10/1983 |
ACRS Report On SECY-82-1B |