| Date |
Title |
| 01/14/1985 |
ACRS Action On Regulatory Guide 1.28, Revision 3, "Quality Assurance Program Requirements (Design and Construction)" |
| 01/15/1985 |
Diesel-Generator Failures At North Anna Power Station, Unit 2 |
| 01/15/1985 |
ACRS Report On The Use Of The "Check-Operator" Concept For Licensed Reactor Operator Requalification |
| 01/15/1985 |
Subcommittee Comments On High Level Waste Repository |
| 02/11/1985 |
ACRS Report On The Braidwood Station, Units 1 and 2 |
| 02/11/1985 |
ACRS Comments On D.L. Baskedas' Professional Opinion Concerning The Proposed Final rule On Pressurized Thermal Shock |
| 03/11/1985 |
ACRS Report On The Nine Mile Point Nuclear Station, Unit 2 |
| 03/12/1985 |
ACRS Comments On The Proposed Rule On Backfitting |
| 03/12/1985 |
ACRS Comments On The NRC Staff Proposal For The Resolution Of USI A-44, "Station Blackout" |
| 03/13/1985 |
ACRS Comments On Proposed Amendments To 10 CFR 60, "Disposal Of High-Level, Radioactive Waste In Geologic Repositories" |
| 03/13/1985 |
Need For Information Concerning Preferred Operator Action for Postulated Scenarios In Which AC Power Is Restored After Severe Core Damage Has Occurred |
| 03/13/1985 |
ACRS Comments Regarding Designation Of Steam Generator And BWR Vessel Overfill As a Separate Issue |
| 03/13/1985 |
ACRS Comments On The Possibility Of An Organization Like The National Transportation Safety Board (NTSB) For Nuclear Safety |
| 04/15/1985 |
Severe Accident Policy -Systematic Review Of Nuclear Power Plants |
| 04/15/1985 |
A "BASE" Program Of NRC Safety Research |
| 04/15/1985 |
ACRS Role In The Civilian Radioactive Waste Management Program |
| 04/17/1985 |
Comments On NRC Programs For The Quantification Of Seismic Design Margins |
| 04/17/1985 |
Notification of NRC of Significant Results Arising From Industry-Sponsored Probabilistic Risk Assessments |
| 05/13/1985 |
ACRS Report On Palo Verde Nuclear Generating Station, Units 1, 2 and 3 |
| 05/13/1985 |
National Academy Of Sciences Study Of Human Factors Research Needs In Nuclear Regulatory Research |
| 05/13/1985 |
Second Set Of ACRS Comments On The Prioritization Of The Remaining Generic Issues |
| 06/10/1985 |
ACRS Comments On The Consideration Of Earthquakes In Off-Site Emergency Planning |
| 06/11/1985 |
ACRS Action On The Proposed Revisions to Appendix J of 10 CFR 50 And the Related Regulatory Guide |
| 06/11/1985 |
ACRS Action On Proposed Regulatory Guide, Task No. IC 127-5 |
| 06/11/1985 |
ACRS Comments On The NRC Safety Research Program and Budget For Fiscal Year 1987 |
| 07/17/1985 |
ACRS Comments On The Long Term Seismic Program Plan For The Diablo Canyon Power Plant |
| 07/17/1985 |
ACRS Comments On Emergency Preparedness For Fuel Cycle And Other Radioactive Material Licensees |
| 07/17/1985 |
ACRS Comments On Proposed NRC Safety Goal Evaluation Report |
| 07/17/1985 |
ACRS Comments On Provisions For Protection Against Sabotage |
| 07/17/1985 |
Incident Investigation At The Davis-Besse Nuclear Power Station |
| 07/17/1985 |
ACRS Comments On EPA Standards For High-Level Radioactive Waste Disposal |
| 07/18/1985 |
ACRS Comments On Primary Coolant System Defect Evaluation |
| 07/18/1985 |
ACRS Comments On Nuclear Power Plant Control Room Habitability |
| 08/13/1985 |
ACRS Report On The Vogtle Electric Generating plant, Unites 1 and 2 |
| 08/13/1985 |
ACRS Report On The Systematic Evaluation Program Review Of The San Onofre Nuclear Generating Station, Unit 1 |
| 08/13/1985 |
ACRS Advisory Role On The NRC High Level Radioactive Waste Program |
| 08/13/1985 |
ACRS Comments On The Systematic Analysis Of Operating Plants For Severer Accidents |
| 08/13/1985 |
ACRS Comments On The INPO Program On Radiation Protection |
| 08/13/1985 |
ACRS Status Report On Long Range Planning |
| 08/13/1985 |
ACRS Comments On The Status Of USI A-46 (Seismic Qualification Of Equipment In Operating Plants |
| 08/13/1985 |
ACRS Comments On The NRC Maintenance And Surveillance Program Plan (SECY -85-129 Dated April 12, 1985) |
| 09/16/1985 |
ACRS Report On Full Power Operation Of River Bend Station, Unit 1 |
| 09/16/1985 |
ACRS Review Of Comanche Peak Steam Electric Station, Units 1 and 2 Safety Evaluation Report Supplements 7 through 11 |
| 09/16/1985 |
ACRS Review Of Proposed Resolution For USI A-43, "Containment Emergency Sump Performance" and Regulatory Guide 1.82, Revision 1, "Water Sources For Long Term Recirculation Cooling Following A Loss Of Coolant Accident" |
| 09/17/1985 |
ACRS Action On The Proposed Revision 2 To Regulatory Guide 1.99 |
| 09/20/1985 |
ACRS Comments On Turkey Point Nuclear Generating Plant, Unit 3 Auxilaiary Feedwater Failure |
| 10/15/1985 |
ACRS Action On Proposed Regulatory Guides |
| 10/16/1985 |
ACRS Comments On The Proposed NRC Advanced Reactor Policy Statement |
| 10/16/1985 |
Additional ACRS Comments On The EPA Standards For A High-Level Radioactive Waste Repository |
| 10/16/1985 |
ACRS Report On Impacts Of Natural Phenomena On Off-Site Emergency Response |
| 10/17/1985 |
ACRS Comments On Consideration Of Earthquakes in Off-Site Emergency Planning |
| 11/13/1985 |
ACRS Report On Beaver Valley Power Station, Unit 2 |
| 11/14/1985 |
Additional ACRS Comments On EPA Standards For A High-Level Radioactive Waste Repository |
| 11/14/1985 |
ACRS Comments On The NRC Incident Investigation Program |
| 11/19/1985 |
Indian Point Special Proceeding |
| 12/10/1985 |
ACRS Report On A Full-Term Operating License For The Millstone Nuclear Power Station, Unit 1 |
| 12/10/1985 |
ACRS Comments On 10 CFR Part 60, Definition Of High-Level Waste |
| 12/10/1985 |
ACRS Comments Regarding Potential Upgrade Of Auxiliary Feedwater Systems In Certain Operating Plants |
| 12/10/1985 |
Third Set Of ACRS Comments On The Prioritization Of The Remaining Generic Issues |
| 12/12/1985 |
ACRS Comments On Requalification Programs For Licensed Power Reactor Operators |
| 12/12/1985 |
ACRS Comments On Rulemaking For Revisions To Operator Licensing Requirements |
| 12/12/1985 |
ACRS Comments On Nureg-0956, "Reassessment Of The Technical Bases For Estimating Source Terms--Draft Report For Comment" |
| 12/16/1985 |
ACRS Report On Impacts Of Natural Phenomena On Off-Site Emergency Response - Clarifying Comments |