Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

ACRS 1974 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/12/1974 Report on Perry Nuclear Power Plant, Units 1 and 2
12/12/1974 Report on St. Lucie Plant Unit No. 2
12/12/1974 Report on Allens Creek Nuclear Generating Station, Units 1 and 2
12/10/1974 Report on Seabrook Station, Units 1 and 2
12/09/1974 Report on Zion Station Units 1 and 2
11/20/1974 Report on Trojan Nuclear Plant
11/20/1974 Report on Beaver Valley Power Station, Unit 1
11/20/1974 Report On Water Reactor Safety Research
11/20/1974 Report On Evaluation Models for Emergency Core Cooling Systems For LWC Nuclear Power Reactors
11/08/1974 Conceputal Design for Prototype Gas-Cooled Fast Breeder Reactor (GCFBR)
11/08/1974 Systems Analysis Of Engineered Safety Systems
10/18/1974 Report on Comanche Peak Steam Electric Station
10/17/1974 Report on Crystal River Nuclear Generating Plant, Unit 3
09/10/1974 Report on Nine Mile Point Nuclear Station Unit 1
08/15/1974 Design Criterion - ACRS Action
08/13/1974 ACRS Documents Relating To Sitting Evaluation
08/13/1974 Report on the Greenwood Energy Center, Units 2 and 3
08/13/1974 Release Of ACRS Documents
07/16/1974 Report on the Bellefonte Nuclear Plant, Units 1 and 2
07/16/1974 Report on Pilgrim Nuclear Power Station Unit 1
07/16/1974 Report on Surry Power Station, Units 3 and 4
07/15/1974 Letter To L. M. Muntzing
06/12/1974 Report on Vermont Yankee Nuclear Power Station
06/11/1974 Report on the Millstone Nuclear Power Station, Unit No. 2
06/11/1974 Report on H.B. Robinson Unit No. 2
05/17/1974 ACRS Review of Watts Bar ECCS
05/15/1974 Report on Grand Gulf Nuclear Station, Units 1 and 2
05/13/1974 Letter To The Honorable Chet Holifield
04/16/1974 Report on Millstone Nuclear Power Station Unit No. 3
04/16/1974 Report on Alvin W. Vogtle Nuclear Plant, Units 1, 2, 3, and 4
04/15/1974 Report on North Anna Power Station, Units 1, 2, 3 and 4
02/13/1974 Status Of Generic Items Relating to Light-Water Reactors
02/13/1974 Review Of Proposed Reload Fuel For Nuclear Reactors
02/12/1974 Report on Hope Creek Generating Station (Formerly Newbold Island Generating Station), Units 1 and 2
02/12/1974 Report On General Electric 8x8 Fuel Design for Reload Use
02/12/1974 Emergency Planning for the Salem-Hope Creek Nuclear Generating Stations
01/14/1974 Report on the Edwin I. Hatch Nuclear Plant, Unit 1
01/14/1974 Report on Calvert Cliffs Nuclear Power Plant, Units 1 and 2

Page Last Reviewed/Updated Tuesday, July 22, 2025

Page Last Reviewed/Updated Tuesday, July 22, 2025