| Date |
Title |
| 12/12/1974 |
Report on Perry Nuclear Power Plant, Units 1 and 2 |
| 12/12/1974 |
Report on St. Lucie Plant Unit No. 2 |
| 12/12/1974 |
Report on Allens Creek Nuclear Generating Station, Units 1 and 2 |
| 12/10/1974 |
Report on Seabrook Station, Units 1 and 2 |
| 12/09/1974 |
Report on Zion Station Units 1 and 2 |
| 11/20/1974 |
Report on Trojan Nuclear Plant |
| 11/20/1974 |
Report on Beaver Valley Power Station, Unit 1 |
| 11/20/1974 |
Report On Water Reactor Safety Research |
| 11/20/1974 |
Report On Evaluation Models for Emergency Core Cooling Systems For LWC Nuclear Power Reactors |
| 11/08/1974 |
Conceputal Design for Prototype Gas-Cooled Fast Breeder Reactor (GCFBR) |
| 11/08/1974 |
Systems Analysis Of Engineered Safety Systems |
| 10/18/1974 |
Report on Comanche Peak Steam Electric Station |
| 10/17/1974 |
Report on Crystal River Nuclear Generating Plant, Unit 3 |
| 09/10/1974 |
Report on Nine Mile Point Nuclear Station Unit 1 |
| 08/15/1974 |
Design Criterion - ACRS Action |
| 08/13/1974 |
ACRS Documents Relating To Sitting Evaluation |
| 08/13/1974 |
Report on the Greenwood Energy Center, Units 2 and 3 |
| 08/13/1974 |
Release Of ACRS Documents |
| 07/16/1974 |
Report on the Bellefonte Nuclear Plant, Units 1 and 2 |
| 07/16/1974 |
Report on Pilgrim Nuclear Power Station Unit 1 |
| 07/16/1974 |
Report on Surry Power Station, Units 3 and 4 |
| 07/15/1974 |
Letter To L. M. Muntzing |
| 06/12/1974 |
Report on Vermont Yankee Nuclear Power Station |
| 06/11/1974 |
Report on the Millstone Nuclear Power Station, Unit No. 2 |
| 06/11/1974 |
Report on H.B. Robinson Unit No. 2 |
| 05/17/1974 |
ACRS Review of Watts Bar ECCS |
| 05/15/1974 |
Report on Grand Gulf Nuclear Station, Units 1 and 2 |
| 05/13/1974 |
Letter To The Honorable Chet Holifield |
| 04/16/1974 |
Report on Millstone Nuclear Power Station Unit No. 3 |
| 04/16/1974 |
Report on Alvin W. Vogtle Nuclear Plant, Units 1, 2, 3, and 4 |
| 04/15/1974 |
Report on North Anna Power Station, Units 1, 2, 3 and 4 |
| 02/13/1974 |
Status Of Generic Items Relating to Light-Water Reactors |
| 02/13/1974 |
Review Of Proposed Reload Fuel For Nuclear Reactors |
| 02/12/1974 |
Report on Hope Creek Generating Station (Formerly Newbold Island Generating Station), Units 1 and 2 |
| 02/12/1974 |
Report On General Electric 8x8 Fuel Design for Reload Use |
| 02/12/1974 |
Emergency Planning for the Salem-Hope Creek Nuclear Generating Stations |
| 01/14/1974 |
Report on the Edwin I. Hatch Nuclear Plant, Unit 1 |
| 01/14/1974 |
Report on Calvert Cliffs Nuclear Power Plant, Units 1 and 2 |