ROP Evaluation

subscribe to page updates

icon/hyperlink for: Evaluation of the ROP page; consisting of a circle target image with light green outline and red and white alternating rings with a large white arrowhead pointer pointing in the center

On this page:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Annual Self-Assessments

On February 24, 2000, the staff issued SECY-00-0049, "Results of the Revised Reactor Oversight Process Pilot Program". The resulting staff requirements memorandum (SRM), issued on March 28, 2000, approved initial implementation of the ROP as recommended by the staff. The initial implementation of the ROP began on April 2, 2000. In a follow-up SRM issued on May 17, 2000, the Commission directed the staff to report on the ROP results after the first year of implementation. The staff did so and documented the results in SECY-01-0114, "Results of the Initial Implementation of the New Reactor Oversight Process", issued June 25, 2001. SECY-01-0114 also noted the staff's intention to continue to perform an annual self-assessment of the ROP.

The objectives and details of the ROP self-assessment program are contained in IMC 0307, "Reactor Oversight Process Self-Assessment Program" and its appendices. ROP self-assessment activities leverage data analysis and trending tools to (1) assess program-wide uniformity and effectiveness of ROP implementation, (2) evaluate the effectiveness of recent significant changes to the ROP, (3) evaluate the NRC's response to significant licensee events and declining licensee performance, and (4) perform periodic in-depth reviews of specific areas of interest, including the baseline inspection program. These ROP self-assessment activities help the staff determine whether the ROP was implemented in accordance with current governance documents, whether it was implemented uniformly and effectively across the regions and headquarters, whether it met its pre-established ROP goals and intended outcomes, and whether it was implemented consistent with the NRC Principles of Good Regulation. Taken in aggregate, these determinations form the basis for the staff's annual evaluation of whether the ROP remains effective. Finally, the ROP self-assessment approach ensures that the staff appropriately invests resources in addressing lessons learned that improve the efficiency and effectiveness of the ROP.

Each year, the staff issues an ROP performance metrics report and an ROP self-assessment Commission paper in support of the Agency Action Review Meeting (AARM). The staff also briefs the Commission on the ROP self-assessment results following the AARM. The results of these activities are summarized in the table below.

Time Period

Commission Paper

Commission Meeting

Commission SRM

Metric Report

CY 2024

COMSECY-25-0001

 

SRM-COMSECY-25-0001

CY24 Activity Summary

CY 2024

CY 2023

SECY-24-0030

July 11, 2024

Meeting SRM M240711

CY 2023

CY 2022

SECY-23-0032

June 20, 2023

Meeting SRM M230620

CY 2022

CY 2021

SECY-22-0029

June 16, 2022

Meeting SRM M220616

CY 2021

CY 2020

SECY-21-0038

June 10, 2021

Meeting SRM M210610

CY 2020

CY 2019

SECY-20-0040

September 30, 2020

Meeting SRM M200930

CY 2019

CY 2018

SECY-19-0037

June 20, 2019

Meeting SRM M190620

CY 2018

CY 2017

SECY-18-0045

June 19, 2018

Meeting SRM M180619

CY 2017

CY 2016

SECY-17-0049

June 15, 2017

Meeting SRM M170615

CY 2016

CY 2015

SECY-16-0047

June 2, 2016

Meeting SRM M160602B

CY 2015

CY 2014

COMSECY-14-0030

May 21, 2015

COMSECY SRM

Meeting SRM M150521B 

 

CY 2013

SECY-14-0047

June 3, 2014

Meeting SRM M140603

CY 2013

CY 2012

SECY-13-0037

May 29, 2013

Meeting SRM M130529

CY 2012

CY 2011

SECY-12-0055

June 1, 2012

Meeting SRM M120601

CY 2011

CY 2010

SECY-11-0054

May 27, 2011

Meeting SRM M110527

CY 2010

CY 2009

SECY-10-0042

May 27, 2010

Meeting SRM M100527

CY 2009

CY 2008

SECY-09-0054

May 14, 2009

Meeting SRM M090514

CY 2008

CY 2007

SECY-08-0046

June 4, 2008

Meeting SRM M080604

CY 2007

CY 2006

SECY-07-0069

May 31, 2007

Meeting SRM M070531

CY 2006

CY 2005

SECY-06-0074

May 16, 2006

Meeting SRM M060516B

CY 2005

CY 2004

SECY-05-0070

May 25, 2005

Meeting SRM M050525B

CY 2004

CY 2003

SECY-04-0053

May 4, 2004

Meeting SRM M040504B

SECY-04-0053, Attachment 3

CY 2002

SECY-03-0062

May 15, 2003

Meeting SRM M030515

SECY-03-0062, Attachment 3

CY 2001

SECY-02-0062

May 1, 2002

Meeting SRM M020501

SECY-02-0062, Attachment 2

Initial Implementation

SECY-01-0114

July 19, 2001

Meeting SRM M010719B

N/A

Pilot Program

SECY-00-0049

March 7, 2000

SRM 1 / SRM 2

N/A

Independent Evaluations

In addition to the ROP self-assessment program, several independent evaluations have been performed since the inception of the ROP to analyze its effectiveness and recommend improvements. Over the past several years, the Government Accountability Office (GAO), the Office of Management and Budget (OMB), the Office of the Inspector General (OIG), the Advisory Committee for Reactor Safeguards (ACRS), the Davis-Besse Lessons Learned Task Force (DBLLTF), and the SDP Task Group have all performed evaluations of the ROP. Early on, two evaluation panels performed detailed reviews of the pilot program and initial implementation of the ROP. These evaluations have generally provided favorable results, but have also suggested potential areas of improvement. Several recommendations from these independent evaluations have been or are being incorporated into the ROP as detailed in the annual self-assessments above and staff responses below.

Entity

Final Report

Staff Response/Program Improvements

Reactor Oversight Process Independent Assessment Report

2013

04/23/2014
Working Group Recommendations to Revise the Substantive Cross-Cutting Issue
Process
SECY-15-0108
IMC 0305

Audit of the NRC's Nuclear Power Reactor Inspection Issue Screening OIG-21-A-07

OIG-21-A-07

05/13/2021

Audit of NRC's Nuclear Power Plant Surveillance Test Inspection Program OIG-20-A-11

OIG-20-A-11

02/11/2021, 08/11/2020

Audit of the NRC Oversight of Supplemental Inspection Corrective Actions OIG-19-A-19

OIG-19-A-19

04/13/2021, 11/09/2020, 11/21/2019

Audit of NRC's Cyber Security Inspections at Nuclear Power Plants OIG-19-A-13

OIG-19-A-13

01/13/2021, 12/03/2019, 08/20/2019

Audit of NRC's Special and Infrequently Performed Inspections OIG-18-A-13

OIG-18-A-13

02/03/2021, 07/30/2020, 03/12/2020, 12/11/2019, 08/20/2019, 07/25/2018

Audit of NRC's Fire Protection Oversight for Operating Reactors OIG-17-A-10

OIG-17-A-10

02/01/2018, 05/31/2017

Audit of NRC's SDP for Reactor Safety OIG-16-A-21

OIG-16-A-21

03/16/2020, 08/20/2019, 02/27/2019, 10/15/2018, 03/01/2018, 08/08/2017, 12/01/2016

Audit of NRC's Oversight of 10 CFR 50.59 OIG-16-A-19

OIG-16-A-19

03/29/2017, 10/05/2016

Audit of NRC's ROP: Reactor Safety Baseline Inspection Procedures OIG-16-A-12

OIG-16-A-12

02/10/2017, 10/27/2016, 06/06/2016

Audit of NRC's Oversight of Spent Fuel Pools OIG-15-A-06

OIG-15-A-06

02/10/2021, 02/11/2020, 03/11/2019, 12/04/2018, 03/15/2018, 08/10/2017, 12/08/2016, 06/10/2016, 05/18/2016, 12/02/2015, 04/29/2015

Audit of NRC's Cyber Security Inspection Program for Nuclear Power Plants OIG-14-A-15

OIG-14-A-15

No Recommendations

Audit of NRC's Management of the Baseline Security Inspection Program OIG-12-A-10

OIG-12-A-10

01/04/2018, 10/10/2017,03/16/2017, 11/12/2015, 01/22/2015, 07/09/2013, 11/20/2012, 05/02/2012

OIG audit of Support to Resident Inspectors

OIG-14-A-12  03/2014

OIG-14-A-12, Appendix C

Commission-Directed Independent Review of ROP per SRM to SECY-12-0081

Working Group Report  02/2014

SECY-14-0047, Enclosure 2

OIG audit of Active Component Aging

OIG-14-A-02  10/2013

OIG-14-A-02, Appendix B

GAO report on Regional Differences and Access to Information

GAO-13-743 09/2013

Response  12/2013

Independent Evaluation of the Reactor Oversight and Incident Response Program

12/31/2008

Action Plan 6/09

NRC Cross-cutting review and Palo Verde Lessons Learned

12/2008

Draft dispositions current as of April 17, 2008

GAO report on Nuclear Reactor Oversight

GAO-06-1029 09/2006

Response 11/06

OIG audit of the Reactor Program System

OIG-05-A-11 04/2005

Status 11/05 (closes items 5 and 10)
Status 02/06 (closes remaining items)

OIG audit of the Baseline Inspection Program

OIG-05-A-06 12/2004

Status 09/05 (closes items 1, 5, 6, 9, and 10)
Status 12/05 (closes items 7 and 8)
Status 06/06 (closes items 3 and 4)

OIG audit of the Significance Determination Process

OIG-02-A-15 08/2002

Status updates in annual SECYs

SDP Task Group

Task Group Report 12/2002

Status updates in annual SECYs

Advisory Committee for Reactor Safeguards

Latest Letter 03/2003

Latest response 04/2003

Davis-Besse Lessons Learned Task Force

DBLLTF final report 09/2002

Final Report
Status/Closure
Significant Improvements

OMB Program Assessment Rating Tool Evaluation

Final Report & Status of Performance Measures and Follow-up Actions 09/2003

Final Report & Status of Performance Measures and Follow-up Actions

Initial Implementation Evaluation Panel

IIEP final report 05/2001

SECY-01-0014, Attachment 5

Pilot Program Evaluation Panel

PPEP final report 12/1999

SECY-00-0049, Attachment 3

Stakeholder Feedback

External Surveys/Feedback

External stakeholder engagement opportunities are not limited to the following; however, these are the primary Communication events:
 
Monthly Public Meetings: The staff conducts monthly public working-level meetings with the Nuclear Energy Institute (NEI), the industry, and interested stakeholders to discuss the status of ongoing refinements to the ROP.   This is an opportunity to solicit for feedback from NEI, industry, and interested stakeholders on initiatives or status of projects. 

Date

Description

06/10/2025

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on June 5, 2025

04/09/2025

Summary Of Reactor Oversight Process Bi Monthly Public Meeting Held on March 26, 2025

02/13/2025

Summary of the Reactor Oversight Process Bi‑Monthly Public Meeting Held on January 29, 2025

12/17/2024

Summary of the Reactor Oversight Process Bi‑Monthly Public Meeting Held on November 20, 2024

10/10/2024

Summary of the Reactor Oversight Process Bi‑Monthly Public Meeting Held on September 25, 2024

08/06/2024

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on July 17, 2024

05/28/2024

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on May 15, 2024

04/11/2024

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on March 26, 2024

01/25/2024

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on January 17, 2024

12/05/2023

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on November 16, 2023

10/04/2023

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on September 20, 2023

08/07/2023

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on July 13, 2023

06/08/2023

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on May 18, 2023

04/18/2023

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on April 05, 2023

01/25/2023

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on January 18, 2023

11/30/2022

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on November 17, 2022

10/20/2022

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on September 28, 2022

08/11/2022

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on July 27, 2022

06/08/2022

Summary of the Reactor Oversight Process Bi-Monthly Public Meeting Held on May 26, 2022

04/01/2022

Summary of Reactor Oversight Process Bi-Monthly Public Meeting Held on March 23, 2022

02/03/2022

Summary of Reactor Oversight Process Bi-Monthly Public Meeting Held on January 26, 2022

12/14/2021

Summary of Reactor Oversight Process Monthly Public Meeting Held on December 2, 2021

10/20/2021

Summary of the Reactor Oversight Process Monthly Public Meeting Summary Held on October 20, 2021

09/23/2021

Summary of the Reactor Oversight Process Monthly Public Meeting Held on September 23, 2021

09/09/2021

Summary of the Reactor Oversight Process Monthly Public Meeting Held on August 26, 2021

08/17/2021

Summary of the Reactor Oversight Process Monthly Public Meeting Held on July 28, 2021

05/25/2021

Summary of the Reactor Oversight Process Monthly Public Meeting Held on May 20, 2021

05/05/2021

Summary of the Reactor Oversight Process Monthly Public Meeting Held on April 21, 2021

04/20/2021

Summary of the Reactor Oversight Process Monthly Public Meeting Held on March 25, 2021

03/11/2021

Summary of the Reactor Oversight Process Monthly Public Meeting Held on February 24, 2021

02/16/2021

Summary of the Reactor Oversight Process Monthly Meeting Held on January 27, 2021

12/03/2020

Summary Of The Reactor Oversight Process Monthly Public Meeting Held On November 18, 2020

10/28/2020

Summary Of The Reactor Oversight Process Monthly Public Meeting Held On October 28, 2020

08/26/2020

Summary of the Reactor Oversight Process Monthly Public Meeting held on August 26, 2020

07/14/2020

Summary of the Reactor Oversight Process Monthly Public Meeting held on June 24, 2020

05/04/2020

Summary of the Reactor Oversight Process Monthly Public Meeting on April 22, 2020

03/12/2020

Summary Of The Reactor Oversight Process Monthly Public Meeting on February 26, 2020

02/07/2020

Summary Of The Reactor Oversight Process Monthly Public Meeting on January 22, 2020

01/14/2020

Summary of Meeting To Discuss NEI White Paper, "Implementing A 24-Month Frequency For Emergency Preparedness Program Review" Frequency Option held on January 14, 2020

12/18/2019

Summary of Public Meeting to Discuss Updates to the Radiation Safety Cornerstones held on December 18, 2019

12/18/2019

Summary of the Reactor Oversight Process Monthly Meeting on November 20, 2019

11/07/2019

Summary of the Reactor Oversight Process Monthly Meeting on October 23, 2019

10/30/2019

NEI White Paper, "Implementing a 24–Month Frequency for Emergency Preparedness Program Reviews" to Support the 10 CFR 50.54(t)(1) 24-Month Emergency Preparedness Program Review held on October 29, 2019

10/21/2019

Summary of the Reactor Oversight Process Monthly Meeting on September 25, 2019

09/23/2019

Summary of the Reactor Oversight Process Monthly Meeting on August 28, 2019

07/31/2019

Summary of the Reactor Oversight Process Monthly Meeting on July 31, 2019

06/19/2019

Summary of the Reactor Oversight Process Monthly Meeting on June 19, 2019

06/18/2019

Summary of the Reactor Oversight Process Monthly Public Meeting on May 22, 2019

06/11/2019

Summary of Public Meeting to Discuss the Update of Inspection Procedure 71124, "Radiation Safety - Public and Occupational," held on May 30, 2019

05/30/2019

Summary of the Reactor Oversight Process Monthly Public Meeting on April 24, 2019

05/20/2019

NEI's Response Letter on the March 27, 2019 ROP Executive Meeting, entitled, "Proposed SECY and ROP Enhancement"

04/24/2019

Summary of the Reactor Oversight Process Monthly Public Meeting on March 27, 2019

04/04/2019

Summary of The Reactor Oversight Process Monthly Public Meeting on March 7, 2019

02/27/2019

Summary of Nuclear Regulatory Commission Public Meeting on January 10, 2019, to Discuss the Focused Self-Assessment of the Emergency Preparedness Significance Determination Process

02/13/2019

Summary of the Reactor Oversight Process Monthly Public Meeting on January 17, 2019

01/17/2019

NEI Presentation on CDF Trending ROP Indicator at January 17, 2019 ROP Public Meeting

01/16/2019

Summary of Nuclear Regulatory Commission Public Meeting on December 14, 2018 to Discuss Radiation Protection Aspects of the ROP Enhancement – Industry Perspectives

01/03/2019

Summary of December 13, 2018, Reactor Oversight Process Enhancement Public Meeting

12/14/2018

11/15/2018 Summary of Reactor Oversight Process Working Group Meeting with Nuclear Energy Institute's ROP Task Force and Other Industry Representatives

11/30/2018

ROP Enhancement Public Meeting Presentation

10/01/2018

Summary of September 20, 2018 Reactor Oversight Process Public Meeting

09/20/2018

ROP Monthly Public Meeting NEI Presentation on ROP Enhancement


 

 
Local public meetings and engagements in vicinity of each operating reactor: The staff conducts public meetings or other engagement activities in the vicinity of each operating reactor to discuss the results of the NRC’s assessment of the licensee’s performance. These annual engagements provide an opportunity to engage interested stakeholders on the NRC’s role in ensuring safe and secure plant operations.
 
Annual Regulatory Information Conference (RIC): The staff typically sponsors a technical session at the annual RIC focused on ROP-related issues and topics of interest, or sponsors an interactive ROP exhibit so that interested stakeholders can gather information and ask questions about the ROP.  Additional ROP topics are typically discussed during the regional technical session. Please see RIC website
 
External Feedback Forms: In addition to sharing staff perspectives and gathering feedback during public meeting discussions, the staff compiles feedback forms from ROP public meetings (i.e., the working group meetings, focused meetings/workshops, and annual assessment meetings) to evaluate the effectiveness of public communications and use of plain language. These feedback forms are used to inform external communication initiatives to ensure that external content and publications relative to the ROP are clear, comprehensible, and understandable.
 
ROP “Contact Us” Form: External stakeholders can provide feedback or ask questions regarding ROP implementation across a wide array of topic areas using the ROP “Contact Us” link. 
 
Historical External Surveys:  From the inception of the ROP through CY 2011, the staff published regular surveys in the Federal Register for external stakeholders to specifically provide feedback on the ROP.  The staff has since discontinued this practice as discussed in SECY-14-0047.  The general results of those surveys were discussed in the respective annual ROP self-assessment Commission papers.  From CY 2004 through CY 2011, the staff provided comprehensive detailed responses to the feedback received in those surveys and those staff responses are listed below.
 

CY 2011/2010

Consolidated Response

CY 2009/2008

Consolidated Response

CY 2007

Consolidated Response

CY 2006

Consolidated Response

CY 2005

Consolidated Response

CY 2004

Consolidated Response

 

Internal Surveys/Feedback

Internal stakeholder engagement opportunities are not limited to the following; however, these are the primary Communication events:

  •  NRC staff and management conduct biweekly conference calls with regional management and staff to discuss current issues associated with the ROP. The staff also meets periodically with regional managers to discuss more complex ROP topics and issues.
  • Headquarters staff participate in each region’s inspector counterpart meeting and/or end-of-cycle meetings so that regional staff and management can provide feedback on ROP implementation.
  • The ROP feedback process described in IMC 0801 allows the NRC staff to identify concerns or issues and recommend improvements related to ROP governance or guidance documents. Responsible staff will respond to and address the feedback in accordance with the requirements and expectations of IMC 0801.
  • NRC staff maintains an internal Contact Us Form where internal stakeholders can provide feedback or ask questions regarding ROP implementation across a wide array of topic areas, including but not limited to resident support concerns. 

 