Correspondence Related to NRC Bulletin 2004-01
On May 28, 2004, NRC issued NRC Bulletin 2004-01, "Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors," Agencywide Documents Access and Management System (ADAMS) Accession No. ML041480034).
Operating experience has demonstrated that Alloy 82/182/600 materials exposed to primary coolant water (or steam) at the normal operating conditions of PWR plants have cracked due primary water stress corrosion cracking (PWSCC). The purpose of Bulletin 2004-01 is to (1) advise PWR licensees that current methods of inspecting Alloy 82/182/600 materials used in the fabrication of pressurizer penetrations and steam space piping connections may need to be supplemented with additional measures to detect and adequately characterize flaws due to PWSCC, (2) request PWR addressees to provide information related to pressurizer penetrations, steam space piping connections, and its Alloy 82/182/600 inspection program, and (3) require PWR addressees to provide a written response in accordance with 10 CFR 50.54(f).
On this page:
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Region 1
Plant Name | Initial 60 Day Response | 60 Day Post Outage Response | Related Documents |
---|---|---|---|
Beaver Valley 1 |
09/29/04 Supplemental Response |
||
Beaver Valley 2 |
09/29/04 Supplemental Response |
||
Calvert Cliffs 1 | |||
Calvert Cliffs 2 | |||
Ginna |
|
|
|
Indian Point 2 |
|
|
|
Indian Point 3 |
|
|
|
Millstone 2 |
10/04/04 Supplemental Response |
||
Millstone 3 |
|
10/04/04 Supplemental Response |
|
Salem 1 |
|
|
|
Salem 2 |
|
|
|
Seabrook 1 | |||
Three Mile Island 1 |
|
07/07/05 Supplemental Response |
Region 2
Plant Name | Initial 60 Day Response | 60 Day Post Outage Response | Related Documents |
---|---|---|---|
Catawba 1 |
09/21/04 Supplemental Response |
||
Catawba 2 |
09/21/04 Supplemental Response |
||
Crystal River 3 |
The facility was permanently shut down on February 20, 2013 |
||
Farley 1 |
|
10/21/04 Supplemental Response |
|
Farley 2 |
|
10/21/04 Supplemental Response |
|
McGuire 1 |
|
09/21/04 Supplemental Response |
|
McGuire 2 |
09/21/04 Supplemental Response |
||
North Anna 1 |
10/04/04 Supplemental Response |
||
North Anna 2 |
|
10/04/04 Supplemental Response |
|
Oconee 1 |
09/21/04 Supplemental Response |
||
Oconee 2 |
|
09/21/04 Supplemental Response |
|
Oconee 3 |
09/21/04 Supplemental Response |
||
Robinson 2 |
|
|
|
Sequoyah 1 |
11/10/04 RAI |
||
Sequoyah 2 |
|
11/10/04 RAI |
|
Shearon Harris 1 | |||
St. Lucie 1 |
|
11/23/04 RAI 01/31/2007 Inspection and Mitigation of Alloy 82/182 butt welds |
|
St. Lucie 2 |
11/23/04 RAI 01/31/2007 Inspection and Mitigation of Alloy 82/182 butt welds |
||
Summer |
|
06/11/05 15 day Response Letter |
|
Surry 1 |
|
10/04/04 Supplemental Response |
|
Surry 2 |
|
10/04/04 Supplemental Response |
|
Turkey Point 3 |
|
|
|
Turkey Point 4 |
|
|
|
Vogtle 1 |
10/21/04 Supplemental Response |
||
Vogtle 2 |
|
10/21/04 Supplemental Response |
|
Watts Bar 1 |
02/11/05 Supplemental Response |
Region 3
Plant Name | Initial 60 Day Response | 60 Day Post Outage Response | Related Documents |
---|---|---|---|
Braidwood 1 |
|
||
Braidwood 2 |
|
||
Byron 1 |
|
||
Byron 2 |
|
||
Davis Besse |
02/25/05 Supplemental Response |
||
DC Cook 1 |
|
10/28/04 Supplemental Response |
|
DC Cook 2 |
10/28/04 Supplemental Response |
||
Kewaunee |
|
09/3/04 Supplemental Response Kewaunee Power Station was permanently shut down on May 7, 2013 |
|
Palisades |
11/9/04 Supplemental Response |
||
Point Beach 1 |
|
|
|
Point Beach 2 |
|
|
|
Prairie Island 1 |
|
|
|
Prairie Island 2 |
|
|
Region 4
Plant Name | Initial 60 Day Response | 60 Day Post Outage Response | Related Documents |
---|---|---|---|
Arkansas Nuclear 1 |
|
|
|
Arkansas Nuclear 2 |
|
||
Callaway |
|
||
Comanche Peak 1 |
|
03/07/05 Supplemental Response |
|
Comanche Peak 2 |
|
03/07/05 Supplemental Response |
|
Diablo Canyon 1 |
10/14/04 Supplemental Response |
||
Diablo Canyon 2 |
|
10/14/04 Supplemental Response |
|
Fort Calhoun |
|
Fort Calhoun Station was permanently shut down on October 24, 2016 |
|
Palo Verde 1 |
|
02/23/06 Supplemental Response |
|
Palo Verde 2 |
|
|
|
Palo Verde 3 |
|
||
San Onofre 2 |
|
|
|
San Onofre 3 |
Station was permanently shut down on June 12, 2013 |
||
South Texas 1 |
Station was permanently shut down on June 12, 2013 |
||
South Texas 2 |
|
||
Waterford 3 |
|
|
|
Wolf Creek 1 |
|
|
Page Last Reviewed/Updated Thursday, August 27, 2020
Page Last Reviewed/Updated Thursday, August 27, 2020