Clinch River Nuclear Site Application
Graphic provided by Tennessee Valley Authority
Who: | Tennessee Valley Authority (TVA) |
What: | Application for a Construction Permit for a small modular reactor (BWRX-300) |
When: | April 2025 to present (date of application submittal) February 2022 to April 2025 (pre-application) |
Website: | https://www.tva.com/energy/technology-innovation/advanced-nuclear-solutions |
Dashboard: | TVA Clinch River Dashboard |
On this page:
- Project Overview
- Topical Reports
- Public Meeting Materials and Meeting Summaries
- Audits and Audit Reports
- Exemption Requests
- Key Milestones
- Contacts
Project Overview
The U.S. Nuclear Regulatory Commission (NRC) is currently engaged in review activities for Tennessee Valley Authority’s (TVA) construction permit application for the Clinch River Nuclear Site in Oak Ridge, Tennessee. This comes after the NRC’s issuance of the site’s Early Site Permit (ESP) in 2019.
Additional information on pre-application activities can be obtained from ADAMS using a search by docket number 99902056.
Additional information regarding the ESP can be found at Clinch River Nuclear Site Early Site Permit webpage.
Topical Reports
Submittal Date | Title | Reference | Status |
---|---|---|---|
08/25/2022 | Clinch River, Topical Report Quality Assurance Program Description for New Nuclear Program | Rev 0 Rev 1 Rev 2 |
Public Meeting Materials and Meeting Summaries
Meeting Date | Title |
---|---|
01/14/2025 | Meeting between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority (TVA) regarding TVA’s request for clarification and alignment on the acceptability of TVA's approach to mapping of geology and geologic features during excavation activities at the Clinch River Nuclear Site |
12/05/2024 | Meeting between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority regarding Tennessee Valley Authority’s request for clarification on the following question: “When the Spent Fuel Pool and Reactor Cavity pool water volumes are cojoined during refueling operation (Pool divider gate removed), is the Regulatory Guidance provided in Regulatory Guide 1.13 and Standard Review Plans 9.1.2 and 9.1.4 applicable to the contiguous volume of water? |
10/18/2023 | Pre-Submittal Meeting for CRN PSAR Chapter 7 NRC Annotated Outline Audit Comments on Use of NRC I&C Design Review Guide |
09/13/2023 | TVA Clinch River CRN-1 Reactor Building Excavation |
10/03/2022 | Pre-Application Topics for Discussion |
08/22/2022 | Pre-Application Standing Meeting with Tennessee Valley Authority on Matters Related to the Development of a Construction Permit Application for the Clinch River Nuclear Site |
05/02/2023 | TVA CRN Strategy on Structural and Seismic Analyses based on existing Subsurface Investigation |
Audits and Audit Reports
Title | Status/Report |
---|---|
Pre-Application Readiness Assessment Activities and Audit Plan for the Clinch River Nuclear Site Draft Application | Complete |
Construction Permit Readiness Assessment for TVA’s Clinch River Nuclear Site (Preliminary Safety Analysis Report) | |
Construction Permit Readiness Assessment for TVA’s Clinch River Nuclear Site (Environmental Report) |
Exemption Requests
Key Milestones
Milestones | Completion Date Actual - A Target - T |
---|---|
Environmental Report Submitted (Part One) | April 28, 2025 – A |
Preliminary Safety Analysis Report Submitted (Part Two) | May 20, 2025 – A |
Environmental Report Acceptance Review Completion (Decision Letter Issued) | June 12, 2025 – A |
Preliminary Safety Analysis Report Acceptance Review Completion (Decision Letter Issued) | July 11, 2025 – T; July 9, 2025 - A |
Review Schedule Established/Schedule Letter Issued to Applicant | TBD |
Safety Review* | TBD |
Environmental Review* | TBD |
Hearing | TBD |
Construction Permit Decision | TBD |
Contacts
Contacts for Clinch River Nuclear Site | |
---|---|
Safety Project Manager (co-lead) | Allen Fetter |
Safety Project Manager (co-lead) | Stacy Joseph |
Safety Project Manager | Ricky Vivanco |
Safety Project Manager | Jordan Glisan |
Safety Project Manager | India Banks |
Environmental Project Manager | Madelyn Nagel |
Contact a Public Affairs Officer |
Page Last Reviewed/Updated Friday, August 08, 2025