Hearing Opportunities and License Applications
subscribe to page updatesThis page provides notices of major licensing applications submitted to the U.S. Nuclear Regulatory Commission (NRC), as well as notices of applicants' intentions to file applications that would constitute major licensing actions. This page also provides current information regarding major licensing proceedings undertaken by the NRC. The availability of this information provides ample opportunities for members of the public to easily identify any such proceedings for which they may wish to request a hearing or file a petition to intervene. The NRC has developed resources for understanding NRC's Rules of Practice for Hearings, 10 CFR Part 2. Requests for hearings submitted in response to hearing opportunity notices published in the Federal Register or on this page on or after October 15, 2007, must be filed in accordance with the E-Filing rule, 72 Fed. Reg. 49,139 (Aug. 28, 2007), now incorporated into 10 CFR Part 2. Further information about E-Filing is available on the Electronic Submittal page.
On this page:
- Letters of Intent for a Major License Application
- Receipt of Major License Application
- Major License Application Accepted for Technical Review
- Opportunities to Request a Hearing or File a Petition to Intervene
- Deadline for Filing Hearing Requests and Intervention Petitions
- Extensions of Time to File Hearing Requests and Intervention Petitions
- Notice of Ownership Change
- Notice of Application for Transfer of Control for Material Licenses Under 10 CFR Part 30 and/or Part 40
- Material Licensing and Other Related Actions Received on a Monthly Basis
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
The following links to non-NRC servers and websites are provided solely as a reference for the convenience of users. NRC cannot guarantee the authenticity of documents or the validity of information obtained at these non-NRC websites. See our Site Disclaimer for more information.
Letters of Intent to Apply for a Major License Application
Some of the applications referenced in these letters of intent are likely to contain or reference Safeguards Information (SGI). Because of the time required to perform a required background check, the NRC has established procedures to allow members of the public who may wish to request a hearing to request access to SGI if there is "a need to know." Before submitting a request, please contact the individual listed for that application, to determine if the application is likely to contain SGI.
For the status of reactor license renewal applications see Status of License Renewal Applications and Industry Activities and Status of Subsequent License Renewal Applications.
Facility and | Applicant | Licensing Action | Submission Date | |
---|---|---|---|---|
H. B. Robinson Steam Electric Plant, Unit Number 2 | Duke Energy Carolinas, LLC | Subsequent License Renewal Application | Apr. 2025 to Jun. 2025 | |
Edwin I. Hatch Units 1 and 2 | Southern Nuclear | Subsequent License Renewal Application | Oct. to Dec. 2025 | |
Prairie Island Nuclear Generating Plant, Units 1 and 2 | Northern States Power Co. – Minnesota | Subsequent License Renewal Application | Oct. to Dec. 2026 | |
Donald C. Cook Nuclear Plant, Units 1 and 2 | Indiana Michigan Power Co. | Subsequent License Renewal Application | Prior to December 31, 2027 | |
Millstone Power Station, Units 2 and 3 | Dominion Energy Nuclear Connecticut, Inc | Subsequent License Renewal Application | Oct. to Dec. 2027 |
Receipt of Major License Application
For the status of reactor license renewal applications see License Renewal Applications and Industry Activities.
Facility and Location | Applicant | Licensing Action | ADAMS | Contact |
---|---|---|---|---|
There is no content at this time. |
Major License Application Accepted for Technical Review
The applications for the proposed licensing actions listed below have undergone an acceptance review by the NRC, have been found to be acceptable and, accordingly, have been docketed.
Date | Facility | Applicant | Licensing | ADAMS | Contact |
---|---|---|---|---|---|
08/04/2025 | Paducah Laser Enrichment Facility, McCracken County, Kentucky | Global Laser Enrichment, LLC | New License Application for Special Nuclear Material | Matt Bartlett | |
05/01/2024 | Dresden Nuclear Power Station, Units 2 and 3, Morris, IL | Constellation Energy Generation, LLC | Subsequent License Renewal Application | Mark Yoo | |
02/29/2024 | Clinton Power Station, Unit 1, | Constellation Energy Generation, LLC | License Renewal Application | Chris Tyree | |
03/15/2024 | Browns Ferry Nuclear Plant, Units 1, 2 & 3, Athens, AL | Tennessee Valley Authority (TVA) | Subsequent License Renewal Application | Jessica Hammock | |
11/30/2023 | Urenco USA, The National Enrichment Facility, | Louisiana Energy Services, LLC | License Amendment Request | Jonathan Rowley | |
10/11/2023 | Virgil C. Summer Nuclear Station, Unit 1 | Dominion Energy | Subsequent License Renewal Application | Marieliz Johnson | |
09/22/2023 | Perry Nuclear Power Plant, Unit 1 | Energy Harbor Nuclear Corp. | License Renewal Application | Vaughn Thomas | |
09/11/2023 | Hermes 2, Units 1 and 2, Oak Ridge, TN | Kairos Power LLC | New Part 50 Construction Permit | Michael Orenak | |
03/03/2023 | Monticello Nuclear Generating Plant, Unit 1, Monticello, MN | Northern States Power Company - Minnesota | Subsequent License Renewal | Marieliz Johnson | |
11/18/2022 | TRISO-X, LLC, Nuclear Fuel Fabrication Facility, Oak Ridge, Tennessee | TRISO-X, LLC | New License Application for Special Nuclear Material | Matt Bartlett | |
10/07/2022 | Cimarron Facility | Cimarron Environmental | Revised Facility Decommissioning | ML22284A145 | James Smith |
08/03/2021 | St. Lucie Plant, Units 1 & 2, Jensen Beach, FL | Florida Power & Light Co. | Subsequent License Renewal | Vaughn Thomas Lance Rakovan | |
07/28/2021 | Oconee Nuclear Station, Units 1, 2, and 3 | Duke Energy Carolinas, LLC | Subsequent License Renewal | Mark Yoo | |
01/22/2021 | Point Beach Nuclear Plant, Units 1 and 2, Two Rivers, Wisconsin | NextEra Energy Point Beach, LLC | Subsequent License Renewal | Chris Tyree | |
10/15/2020 | North Anna, Units 1 and 2 | Dominion Energy | Subsequent License Renewal | Vaughn Thomas |
Opportunities to Request a Hearing or Petition to Intervene
Major Licensing Applications
Deadline for filing hearing request | Facility and Location | Applicant | Licensing Action | ADAMS Accession Number | Contact |
---|---|---|---|---|---|
October 28, 2025 | Dawes County, Nebraska | Crow Butte | License Renewal | Tom Lancaster | |
December 7, 2024 | Urenco USA, The National Enrichment Facility, | Louisiana Energy Services, LLC | The NRC has received, by letter dated November 30, 2023, an application from Louisiana Energy Services, LLC, dba Urenco USA, to amend SNM-2010 at the National Enrichment Facility, located five miles east of Eunice, New Mexico. The National Enrichment Facility is a gas centrifuge uranium enrichment facility authorized to possess, use, and store special nuclear material (SNM), source material, and byproduct material. This amendment request proposes an increase of the enrichment limit in SNM-2010 license from 5.5 weight percent Uranium 235 (U-235) to less than 10 weight percent U-235, which Urenco USA calls Low Enriched Uranium Plus (LEU+). The scope of the request is limited to the systems, structures, and components necessary for the production, handling, and storage of the LEU+ at the Urenco USA site. |
| Jonathan Rowley |
Deadline for Filing Hearing Requests and Intervention Petitions
The deadline for filing a request for a hearing or a petition to intervene, where there is no Federal Register notice of an opportunity for hearing, is determined by the date of the related notice on the NRC's Web site. See 10 CFR 2.309(b)(4)(i). Where an opportunity for hearing is not published in the Federal Register, the information on this page constitutes the Web site notice referenced in 10 CFR 2.309(b)(4)(i), and all determinations of the timeliness of hearing requests and intervention petitions for purposes of Section 2.309(b)(4)(i) will be based upon the date of notice publication on this page. Where an opportunity for hearing is published in the Federal Register, the deadline for hearing opportunity is determined by the date of publication in the Federal Register and not the date of publication on this page.
The NRC will update this page to add notices as the NRC receives new applications or notices of intent for major licensing actions, and as opportunities arise for the public to request a hearing or file a petition to intervene in major licensing proceedings. The NRC will also update this page to remove notices following the deadline for timely filing of a hearing request or intervention petition.
Extensions of Time to File Hearing Requests and Intervention Petitions
Given the early notice that this page provides with respect to licensing applications (and the intent to file applications), together with the information provided on other pages of the NRC's Web site and the broad public disclosure provisions in 10 CFR 2.390, the Commission anticipates that it will very rarely grant extensions of time to file hearing requests or intervention petitions.
Notice of Ownership Change
Deadline for filing hearing request | Facility and Location | Applicant | Licensing Action | ADAMS Accession Number | Contact |
---|---|---|---|---|---|
December 8, 2023, for comments and November 28, 2023 for a hearing. | Vallecitos Nuclear Center | GE-Hitachi Nuclear Energy Americas, LLC | Application for order and conforming license amendments approving the direct transfer of licenses | ML23244A247 (application) | William Allen |
June 21, 2023, for comments and June 12, 2023 for a hearing. See 88 FR 32807 (Dated May 22, 2023) | Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 located on Squaw Creek Reservoir in Somervel County, Texas about 5 miles north-northwest of Glen Rose, Texas, and about 40 miles southwest of Fort Worth in north-central Texas. Beaver Valley Power Station, Unit Nos. 1 and 2 located in Beaver County, Pennsylvania, on the southern shore of the Ohio River, Davis-Besse Nuclear Power Station, Unit No. 1 located on the south-western shore of Lake Erie in Ottawa County, Ohio, approximately 21 miles east of Toledo, Ohio, and Perry Nuclear Power Plant, Unit No. 1 located on the shore of Lake Erie in Lake County, Ohio, approximately 35 mile northeast of Cleveland, Ohio. | Vistra Operations Company LLC (VistraOps) and Energy Harbor Nuclear Corp. | The indirect transfer of control of Facility Operating License Nos. NFP-87 and NFP-89 for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, respectively, and its generally licensed independent spent fuel storage installation (ISFSI); the indirect transfer of control of Renewed Facility Operating License Nos. DPR-66, NPF-73, and NPF-3 for Beaver Valley Power Station, Unit Nos. 1 and 2, and Davis-Besse Nuclear Power Station, Unit No. 1, respectively, and Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1, and their associated generally licensed ISFSIs (collectively, the EH Facilities); and the direct transfer of the operating authority for the EH Facilities to VistraOps. The application also seeks the issuance of conforming amendments for administrative purposes to reflect the proposed transfer. | ML23104A423 ML23110A788 ML23128A161 ML23129A012 | Robert Kuntz |
2/10/2022 for a hearing and, 2/20/2022 for comments | Zion Nuclear Power Station (ZNPS), Units 1 and 2, and the Associated Independent Spent Fuel Storage Installation | EnergySolutions, LLC | NRC Order approving the indirect transfers of: | ML21344A114 – application | Jack Parrott 301-415-6634 |
Notice of Application for Transfer of Control for Material Licenses Under 10 CFR Part 30 and/or Part 40
Pending applications for the proposed transfer of control for 10 CFR Part 30 and/or 10 CFR Part 40 materials licenses are listed below. These applications are listed as a notice pursuant to 10 CFR 2.1301, unless any of these documents are exempt from disclosure under 10 CFR Part 9. In accordance with 10 CFR 2.1305, persons may submit written comments regarding applications within 30 days of the website posting date. Any request for a hearing must be filed in accordance with the NRC's E-Filing Rule, as incorporated into 10 CFR Part 2. Written comments must be submitted to: Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff.
Applicant Affiliation(s) | ADAMS | Deadline for comment | Contact |
---|---|---|---|
HiViz, LLC | October 15, 2025 | Samantha Everett | |
Jaca & Sierra Engineering, PSC | October 3, 2025 | Candace Krout | |
JRGO LLC d/b/a Integrity Assessment Group | October 2, 2025 | Tammy Tomczak | |
IRISNDT, Inc. | September 17, 2025 | Tammy Tomczak |
Material Licensing and Other Related Actions Received on a Monthly Basis
Section 189 of the Atomic Energy Act provides an opportunity to request a hearing to any person whose interest may be affected by the granting, suspending, revoking or amending of a materials license. To ensure that the public is given notice and, thus, the opportunity to request a hearing on these materials licensing actions, the NRC makes available lists of materials licensing actions.
The NRC will continue to update the tables at the Web site sections described below to reflect materials licensing and other related actions received on a monthly basis.
Page Last Reviewed/Updated Monday, September 15, 2025