Materials and Plant Protection (Division 5): Regulatory Guides 5.61 – 5.80
This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).
See also Draft Regulatory Guides for Public Comment.
See NRC Regulatory Guides for more general information.
Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Guide | Title | Revision No. | Issue | Additional Information |
---|---|---|---|---|
5.61 | Intent and Scope of the Physical Protection Upgrade Rule Requirements for Fixed Sites | W | ||
0 | ||||
5.62 | Physical Security Event Notifications, Reports, and Records | 3 | ||
2 | ||||
1 | Reviewed in 2012 – No issues identified | |||
0 | ||||
5.63 | Physical Protection for Transient Shipments | 0 | Reviewed in 2020 – Issues identified for future consideration | |
5.65 | Vital Area Access Controls, Protection of Physical Security Equipment, and Key and Lock Controls | W | ||
0 | ||||
5.66 | Access Authorization Program for Nuclear Power Plants | 2 | ||
1 | 04/2009 | |||
5.67 | Material Control and Accounting for Uranium Enrichment Facilities Authorized To Produce Special Nuclear Material of Low Strategic Significance | W | ||
0 | ||||
5.68 | Protection Against Malevolent Use of Vehicles at Nuclear Power Plants | W | ||
0 | Reviewed in 2013 – No issues identified | |||
5.69 | Guidance for the Application of Radiological Sabotage Design-Basis Threat in the Design, Development and Implementation of a Physical Security Program that Meets 10 CFR 73.55 Requirements (SGI) | 1 | 03/2022 | |
0 | 09/2007 | Reviewed in 2014 – issues identified | ||
5.70 | Guidance for the Application of the Theft and Diversion Design-Basis Treat in the Design Development, and Implementation of a Physical Security Program that Meets CFR 73.45 and 73.46 (Classified) | 1 | 02/2017 | |
0 | 09/2007 | |||
5.71 | Cyber Security Programs for Nuclear Power Reactors | 1 | ||
0 | ||||
5.73 | Fatigue Management for Nuclear Power Plant Personnel | 0 | 10/2019 – Reviewed with issues identified for future consideration | |
5.74 | Managing the Safety/Security Interface | 1 | ||
0 | ||||
5.75 | Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities | 1 | ||
0 | ||||
5.76 | Physical Protection Programs at Nuclear Power Reactors (SGI) | 1 | 11/2020 | |
0 | 07/2009 | |||
5.77 | Insider Mitigation Program | 1 | ||
0 | 03/2009 | |||
5.78 | Physical Protection of Mixed Oxide Fuels in Nuclear Power Plants (SGI) | 0 | 07/2010 | |
5.79 | Protection of Safeguards Information | 0 | ||
5.80 | Pressure-Sensitive And Tamper-Indicating Device Seals For Material Control And Accounting Of Special Nuclear Material | 0 |
Page Last Reviewed/Updated Monday, September 29, 2025
Page Last Reviewed/Updated Monday, September 29, 2025