Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Safety Evaluation Report Related to Disposal of High-Level Radioactive Wastes in a Geologic Repository at Yucca Mountain, Nevada: Repository Safety Before Permanent Closure (NUREG-1949, Volume 2)

On this page:

Download complete document

Publication Information

Manuscript Completed: January 2015
Date Published: January 2015

Office of Nuclear Material Safety and Safeguards
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

Volume 2, "Repository Safety Before Permanent Closure," of this Safety Evaluation Report (SER) documents the U.S. Nuclear Regulatory Commission (NRC) staff's review and evaluation of the U.S. Department of Energy's (DOE) Safety Analysis Report (SAR), entitled, "Repository Safety Before Permanent Closure," provided by DOE on June 3, 2008, as updated by DOE on February 19, 2009. In its application, DOE seeks authorization from the Commission to construct a repository for high-level radioactive waste at Yucca Mountain, Nevada. The NRC staff also reviewed information DOE provided in response to the NRC staff's requests for additional information and other information that DOE provided related to the SAR. In particular, SER Volume 2 documents the results of the NRC staff's evaluation to determine whether the proposed repository design complies with the performance objectives and requirements that apply before the repository is permanently closed. Based on its review, and subject to the proposed conditions of Construction Authorization documented in Volume 2 of this SER, the NRC staff finds, with reasonable assurance, that DOE has demonstrated compliance with the NRC regulatory requirements for preclosure safety. This includes "Performance objectives for the geologic repository operations area through permanent closure" in 10 CFR 63.111, "Requirements for preclosure safety analysis of the geologic repository operations area" in 10 CFR 63.112, and "Preclosure Public Health and Environmental Standards" in 10 CFR Part 63, Subpart K.

Page Last Reviewed/Updated Thursday, March 25, 2021