Commission Papers (SECY) for 2011
As a general policy, SECY Papers will be released to the public unless they contain specific limited types of information which warrant protection. Missing numbers in the listing indicate that these papers involve matters which the Commission has specifically agreed should be withheld: Classified, Safeguards, Allegation, Investigation, Security-Related, Proprietary, Privacy Act Information, Federal/State/Foreign Government and International Agency-Controlled Information, Adjudicatory, Enforcement, Lawyer-Client or Legal Work Product, and limited sensitive matters which contain a specific withhold recommendation and supporting justification. (Reference Internal Commission Procedures, Chapter II.)
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
SECY Number |
Description | Date |
---|---|---|
SECY-11-0184 | Security Regulatory Framework for Certifying, Approving, and Licensing Small Modular Nuclear Reactors (M110329) | 12/29/2011 |
SECY-11-0182 | Annual Review of the Need for Rulemaking or Regulatory Guidance on Extended Storage of Low-Level Radioactive Waste | 12/28/2011 |
SECY-11-0181 | Decommissioning Funding Assurance for Small Modular Nuclear Reactors | 12/22/2011 |
SECY-11-0178 | Insurance and Liability Regulatory Requirements for Small Modular Reactor Facilities | 12/22/2011 |
SECY-11-0177 | Weekly Information Report - Week Ending December 16, 2011 | 12/21/2011 |
SECY-11-0175 | Proposed Rule: Amendments to Material Control and Accounting Regulations (RIN 3150-AI61) | 12/15/2011 |
SECY-11-0172 | Response To Staff Requirements Memorandum COMGEA-11-0001, "Utilization of Expert Judgment in Regulatory Decision Making" | 12/13/2011 |
SECY-11-0171 | Weekly Information Report - Week Ending December 2, 2011 | 12/13/2011 |
SECY-11-0170 | Final Rule: Physical Protection of Byproduct Material (RIN 3150-AI12) | 12/08/2011 |
SECY-11-0169 | U.S. Nuclear Regulatory Commission Implementation Plan for the Radiation Source Protection and Security Task Force Report | 12/07/2011 |
SECY-11-0167 | Weekly Information Report - Week Ending November 25, 2011 | 12/02/2011 |
SECY-11-0165 | Weekly Information Report - Week Ending November 18, 2011 | 11/23/2011 |
SECY-11-0163 | Reprocessing Rulemaking: Draft Regulatory Basis and Path Forward | 11/18/2011 |
SECY-11-0162 | Weekly Information Report - Week Ending November 11, 2011 | 11/16/2011 |
SECY-11-0160 | Weekly Information Report - Week Ending November 4, 2011 | 11/14/2011 |
SECY-11-0159 | Status of the Decommissioning Program—2011 Annual Report | 11/10/2011 |
SECY-11-0157 | Weekly Information Report - Week Ending October 28, 2011 | 11/07/2011 |
SECY-11-0156 | Feasibility of Including Risk Information in Categorizing Structures, Systems, and Components as Safety-Related or Nonsafety-Related | 11/02/2011 |
SECY-11-0155 | Proposed Changes to the Enforcement Policy Associated with Construction Activities | 11/01/2011 |
SECY-11-0154 | An Agencywide Approach to Counterfeit, Fraudulent, and Suspect Items | 10/28/2011 |
SECY-11-0153 | Weekly Information Report - Week Ending October 21, 2011 | 10/31/2011 |
SECY-11-0152 | Development of an Emergency Planning and Preparedness Framework for Small Modular Reactors | 10/28/2011 |
SECY-11-0151 | Annual Update of The Risk-Informed and Performance-Based Plan | 10/27/2011 |
SECY-11-0149 | Summary Findings Resulting from the Staff Review of the 2010 Decommissioning Funding Status Reports for Operating Power Reactor Licensees | 10/26/2011 |
SECY-11-0148 | NRC Participation in the OECD Halden Reactor Project During 2012–2014 | 10/21/2011 |
SECY-11-0147 | Weekly Information Report - Week Ending October 14, 2011 | 10/21/2011 |
SECY-11-0146 | Annual Update on the Status of Emergency Preparedness Activities | 10/19/2011 |
SECY-11-0145 | Final Rule: AP1000 Design Certification Amendment | 10/18/2011 |
SECY-11-0143 | Weekly Information Report - Week Ending October 7, 2011 | 10/13/2011 |
SECY-11-0142 | Final Rule: Advance Notification to Native American Tribes of Transport of Certain Types of Nuclear Waste (RIN 3150-AG41) | 10/07/2011 |
SECY-11-0141 | Weekly Information Report - Week Ending September 30, 2011 | 10/11/2011 |
SECY-11-0140 | Enhancements to the Fuel Cycle Oversight Process | 10/07/2011 |
SECY-11-0138 | Status of the Accident Sequence Precursor Program and the Standardized Plant Analysis Risk Models | 09/30/2011 |
SECY-11-0137 | Prioritization of Recommended Actions to be Taken in Response to Fukushima Lessons Learned | 10/03/2011 |
SECY-11-0136 | Weekly Information Report - Week Ending September 23, 2011 | 09/30/2011 |
SECY-11-0135 | Staff Plans to Develop the Regulatory Basis for Clarifying the Requirements in Title 10 of the Code of Federal Regulations Part 21, “Reporting of Defects and Noncompliance” | 09/29/2011 |
SECY-11-0134 | Annual Review of the Lessons-Learned Program | 09/28/2011 |
SECY-11-0133 | Options to Evaluate Requests to Use Discounted Parent Company Guarantees to Assure Funding of Decommissioning Cost for Power Reactors | 09/28/2011 |
SECY-11-0132 | Revision of the Criteria for Identifying Nuclear Material Licensees for Discussion at the Agency Action Review Meeting | 09/20/2011 |
SECY-11-0129 | Final Rule: Requirements For Distribution Of Byproduct Material, 10 CFR Parts 30, 31, 32, 40, and 70 (RIN 3150-AH91) | 09/15/2011 |
SECY-11-0128 | Weekly Information Report - Week Ending September 9, 2011 | 09/16/2011 |
SECY-11-0127 | Weekly Information Report - Week Ending September 2, 2011 | 09/16/2011 |
SECY-11-0126 | Proposed Rule: Amendments to Material Control and Accounting Regulations (RIN 3150-A-161) | 09/13/2011 |
SECY-11-0125 | Issuance Of Bulletin 2011-01, "Mitigating Strategies" | 09/12/2011 |
SECY-11-0124 | Recommended Actions to be taken Without Delay From The Near-Term Task Force Report | 09/09/2011 |
SECY-11-0123 | Weekly Information Report - Week Ending August 26, 2011 | 09/02/2011 |
SECY-11-0121 | Weekly Information Report - Week Ending August 19, 2011 | 08/26/2011 |
SECY-11-0120 | Weekly Information Report - Week Ending August 12, 2011 | 08/26/2011 |
SECY-11-0119 | Weekly Information Report - Week Ending August 5, 2011 | 08/26/2011 |
SECY-11-0117 | Proposed Charter for the Longer-Term Review of Lessons Learned from the March 11, 2011, Japanese Earthquake and Tsunami | 08/26/2011 |
SECY-11-0115 | Staff Statement in Support of the Uncontested Hearing for Issuance of Combined Licenses for the Virgil C. Summer Nuclear Station, Units 2 and 3 (Docket Nos. 52-027 and 52-028) | 08/19/2011 |
SECY-11-0114 | Periodic Assessment of the Activities of the Committee to Review Generic Requirements from June 1, 2010, through May 31, 2011 | 08/17/2011 |
SECY-11-0112 | Staff Assessment of Selected Small Modular Reactor Issues Identified in SECY-10-0034 | 08/12/2011 |
SECY-11-0111 | Staff Progress in Resolving Issues Associated with Inspections, Tests, Analyses, and Acceptance Criteria | 08/09/2011 |
SECY-11-0110 | Staff Statement in Support of the Uncontested Hearing for Issuance of Combined Licenses and Limited Work Authorizations for Vogtle Electric Generating Plant, Units 3 and 4 (Docket Nos. 52-025 and 52-026) | 08/09/2011 |
SECY-11-0109 | Weekly Information Report - Week Ending July 29, 2011 | 08/09/2011 |
SECY-11-0108 | Regulation of Chemical Security | 08/05/2011 |
SECY-11-0107 | Final Rule: Requirements for Fingerprint-Based Criminal History Records Checks for Individuals Seeking Unescorted Access to Nonpower Reactors (Research or Test Reactors) (RIN 3150-AI25) | 08/04/2011 |
SECY-11-0106 | Final Rule: U.S. Advanced Boiling-Water Reactor Aircraft Impact Design Certification Amendment (RIN 3150-AI84) | 08/04/2011 |
SECY-11-0105 | Proposed Minor Revision to Management Directive 5.12, "International Nuclear Event Scale Participation" | 08/04/2011 |
SECY-11-0104 | Weekly Information Report - Week Ending July 22, 2011 | 08/01/2011 |
SECY-11-0102 | Fourth Report on the Status of Reactivation of Construction and Licensing for Watts Bar Nuclear Plant, Unit 2 | 07/28/2011 |
SECY-11-0101 | Summary of Activities Related to Generic Issues Program | 07/26/2011 |
SECY-11-0100 | Weekly Information Report - Week Ending July 15, 2011 | 07/27/2011 |
SECY-11-0098 | Operator Staffing for Small or Multi-Module Nuclear Power Plant Facilities | 07/22/2011 |
SECY-11-0097 | Denial Of Petition For Rulemaking (PRM-32-6), Association Of State And Territorial Solid Waste Management Officials | 07/19/2011 |
SECY-11-0096 | Weekly Information Report - Week Ending July 8, 2011 | 07/26/2011 |
SECY-11-0094 | Advantages and Disadvantages of Changing the Current Authentication Assurance Level (Level 4) of the National Source Tracking System | 07/13/2011 |
SECY-11-0093 | Near-Term Report and Recommendations for Agency Actions Following The Events in Japan | 07/12/2011 |
SECY-11-0092 | Weekly Information Report - Week Ending July 1, 2011 | 07/12/2011 |
SECY-11-0089 | Options for Proceeding with Future Level 3 Probabilistic Risk Assessment Activities | 07/07/2011 |
SECY-11-0088 | Denial of Petition for Rulemaking Requesting Amendments to 10 CFR Part 50 Regarding Decommissioning and Decommissioning Funding (PRM-50-94) | 07/05/2011 |
SECY-11-0087 | Weekly Information Report - Week Ending June 24, 2011 | 07/07/2011 |
SECY-11-0086 | Weekly Information Report - Week Ending June 17, 2011 | 07/06/2011 |
SECY-11-0084 | Staff Action Plan to Address the Integrated Regulatory Review Service Mission | 06/27/2011 |
SECY-11-0080 | Weekly Information Report - Week Ending June 10, 2011 | 06/17/2011 |
SECY-11-0079 | License Structure for Multi-Module Facilities Related to Small Modular Nuclear Power Reactors | 06/12/2011 |
SECY-11-0078 | U. S. Environmental Protection Agency Revisions to the Protective Action Guidance Manual | 06/09/2011 |
SECY-11-0077 | Weekly Information Report - Week Ending June 3, 2011 | 06/10/2011 |
SECY-11-0076 | Improving the Public Radiation Safety Cornerstone of the Reactor Oversight Process | 06/09/2011 |
SECY-11-0074 | Weekly Information Report - Week Ending May 27, 2011 | 06/07/2011 |
SECY-11-0073 | Staff Proposal to Reintegrate Security into the Action Matrix of the Reactor Oversight Process Assessment Program | 06/05/2011 |
SECY-11-0072 | Weekly Information Report - Week Ending May 20, 2011 | 06/01/2011 |
SECY-11-0071 | Status Report on Power Uprates | 05/25/2011 |
SECY-11-0069 | Weekly Information Report - Week Ending May 13, 2011 | 05/24/2011 |
SECY-11-0068 | Lessons-Learned from the Pilot Plant Transition to a Risk-Informed, Performance-Based Fire Protection Licensing Basis | 05/23/2011 |
SECY-11-0065 | Weekly Information Report - Week Ending May 6, 2011 | 05/18/2011 |
SECY-11-0064 | Weekly Information Report - Week Ending April 29, 2011 | 05/15/2011 |
SECY-11-0063 | Closing Fire Protection Issues—Semiannual Update-May 2011 | 05/13/2011 |
SECY-11-0061 | A Request to Revise the Interim Enforcement Policy for Fire Protection Issues on 10 CFR 50.48(C) to Allow Licensees to Submit License Amendment Requests in a Staggered Approach (RIN 3150-AG48) | 04/29/2011 |
SECY-11-0060 | Weekly Information Report - Week Ending April 22, 2011 | 05/03/2011 |
SECY-11-0059 | Weekly Information Report - Week Ending April 15, 2011 | 04/25/2011 |
SECY-11-0058 | Proposed Final Policy Statement on the Protection of Cesium-137 Chloride Sources | 04/18/2011 |
SECY-11-0056 | Annual Report to the Commission on Licensee Performance in the Materials and Waste Programs Fiscal Year 2010 | 04/14/2011 |
SECY-11-0055 | Weekly Information Report - Week Ending April 8, 2011 | 04/21/2011 |
SECY-11-0054 | Reactor Oversight Process Self-Assessment for Calendar Year 2010 | 04/08/2011 |
SECY-11-0053 | Final Rule: Enhancements to Emergency Preparedness Regulations (10 CFR Part 50 and 10 CFR Part 52) (RIN-3150-AI10) | 04/08/2011 |
SECY-11-0051 | Weekly Information Report - Week Ending April 1, 2011 | 04/14/2011 |
SECY-11-0050 | Progress Report Regarding Encouraging States and Licensees to Complete National Source Tracking System Credentialing and to Use the System Electronically | 04/06/2011 |
SECY-11-0049 | Advisory Committee on the Medical Uses of Isotopes Reporting Structure: Options, Analysis, and Proposed Implementation Plans | 04/01/2011 |
SECY-11-0046 | Status of the Regulatory Guide Update Program | 03/31/2011 |
SECY-11-0045 | Weekly Information Report - Week Ending March 25, 2011 | 04/04/2011 |
SECY-11-0044 | Fiscal Year 2010 Results of the Industry Trends Program for Operating Power Reactors | 03/28/2011 |
SECY-11-0042 | Revisions to Internal Commission Procedures Section on Mandatory Hearings | 03/25/2011 |
SECY-11-0041 | Weekly Information Report - Week Ending March 18, 2011 | 03/28/2011 |
SECY-11-0039 | Final Rule: Definition of Construction in 10 CFR Parts 30, 36, 39, 40, 51, 70, and 150 | 03/18/2011 |
SECY-11-0038 | Weekly Information Report - Week Ending March 11, 2011 | 03/24/2011 |
SECY-11-0036 | Weekly Information Report - Week Ending March 4, 2011 | 03/14/2011 |
SECY-11-0035 | Integrated Plan, Title 10 of the Code of Federal Regulations Part 35, Medical Use of Byproduct Material, Activities and Options for Streamlining the Medical Rulemaking Petition and Rulemaking Processes | 03/10/2011 |
SECY-11-0034 | Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the U.S. Department of Homeland Security on Chemical Facility Anti-Terrorism Standards | 03/09/2011 |
SECY-11-0033 | Proposed NRC Staff Approach to Address Resource Challenges Associated with Review of a Large Number of NFPA 805 License Amendment Requests | 03/04/2011 |
SECY-11-0032 | Consideration of the Cumulative Effects of Regulation in the Rulemaking Process | 03/02/2011 |
SECY-11-0030 | Weekly Information Report - Week Ending February 25, 2011 | 03/07/2011 |
SECY-11-0029 | Plan for the Long-Term Update to the Waste Confidence Rule and Integration with the Extended Storage and Transportation Initiative | 02/28/2011 |
SECY-11-0028 | Options for Implementing an Alternative Interim Regulatory Approach to the Minimum Days Off Provisions of 10 CFR Part 26, Subpart I, "Managing Fatigue" | 02/28/2011 |
SECY-11-0027 | Report to Congress on Abnormal Occurrences Fiscal Year 2010 | 02/27/2011 |
SECY-11-0025 | Weekly Information Report - Week Ending February 18, 2011 | 03/01/2011 |
SECY-11-0024 | Use of Risk Insights to Enhance the Safety Focus of Small Modular Reactor Reviews | 02/18/2011 |
SECY-11-0023 | Jurisdiction for Military Operational Radium-226 | 02/16/2011 |
SECY-11-0022 | Weekly Information Report - Week Ending February 11, 2011 | 02/18/2011 |
SECY-11-0019 | Senior Management Review of Overall Regulatory Approach to Groundwater Protection | 02/09/2011 |
SECY-11-0018 | Weekly Information Report - Week Ending February 4, 2011 | 02/11/2011 |
SECY-11-0016 | Weekly Information Report - Week Ending January 28, 2011 | 02/07/2011 |
SECY-11-0015 | Annual Report on Court Litigation (Calendar Year 2010) | 02/03/2011 |
SECY-11-0014 | Use of Containment Accident Pressure in Analyzing Emergency Core Cooling System and Containment Heat Removal System Pump Performance in Postulated Accidents | 01/31/2011 |
SECY-11-0011 | Weekly Information Report - Week Ending January 21, 2011 | 01/28/2011 |
SECY-11-0009 | Weekly Information Report - Week Ending January 14, 2011 | 01/24/2011 |
SECY-11-0008 | 2010 Annual Report on Commission Adjudication | 01/13/2011 |
SECY-11-0007 | Weekly Information Report - Week Ending January 7, 2011 | 01/14/2011 |
SECY-11-0006 | Proposed Rule—Economic Simplified Boiling-Water Reactor Design Certification | 01/07/2011 |
SECY-11-0005 | Proposed Final Safety Culture Policy Statement | 01/05/2011 |
SECY-11-0004 | Weekly Information Report - Week Ending December 31, 2010 | 01/07/2011 |
SECY-11-0003 | Status of Enforcement Discretion Request and Rulemaking Activities Related to 10 CFR Part 26, Subpart I, "Managing Fatigue" | 01/04/2011 |
SECY-11-0002 | Proposed Rule: AP1000 Design Certification Amendment (RIN 3150-AI81) | 01/03/2011 |
SECY-11-0001 | Weekly Information Report - Week Ending December 24, 2010 | 01/03/2011 |
Page Last Reviewed/Updated Friday, December 02, 2022
Page Last Reviewed/Updated Friday, December 02, 2022