ACRS 2016 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date | Title | Response |
---|---|---|
12/06/2016 | Draft Final Rule 10 CFR 50.155, Mitigation Of Beyond-Design-Basis Events and Associated Regulatory Guidance | 12/16/16 |
11/15/2016 | Report on the Safety Aspects of Dominion Virginia Power Combined License Application for North Anna Unit 3 | 11/15/16 |
11/15/2016 | Monticello Nuclear Generating Plant Licensing Amendment Request for Operation in the Extended Flow Window Domain | 11/15/16 |
11/14/2016 | Review of SECY-16-0106, Proposed Final Rule 10 CFR Part 61, Low-Level Radioactive Waste Disposal | 12/19/16 |
10/17/2016 | Review of RG 1.26, Revision 5, Quality Group Classifications And Standards For Water-, Steam-, And Radioactive-Waste Containing Components of Nuclear Power Plants | 12/13/16 |
10/14/2016 | Report on the Safety Aspects of the License Renewal Application of the Grand Gulf Nuclear Station, Unit 1 | 11/08/16 |
09/22/2016 | Pacific Gas and Electric Diablo Canyon Units One and Two Digital Process Protection System Upgrade License Amendment Request | 10/11/16 |
09/19/2016 | Response to the July 5, 2016 Staff Letter Regarding Interim Staff Guidance JLD-ISG-2016-01 for Focused Evaluations and Integrated Assessments of Reevaluated Flooding Hazards | 10/21/16 |
09/16/2016 | Report on the Safety Aspects of the License Renewal Application of the Fermi 2 Nuclear Power Plant | 10/19/16 |
09/16/2016 | Report on the Safety Aspects of the Florida Power & Light Company's Combined License Application for Turkey Point Units 6 and 7 | |
07/19/2016 | Topical Report WCAP-16996-P, Volumes I, II and III, Revision 1, "Realistic Loss-of-Coolant Accident Evaluation Methodology Applied to the Full Spectrum of Break Sizes" | 08/30/16 |
07/18/2016 | Report on the Safety Aspects of the License Renewal Application of the Lasalle County Station, Units 1 and 2 | 09/14/16 |
07/18/2016 | Draft Final Regulatory Guide 1.230, "Regulatory Guidance on the Alternate Pressurized Thermal Shock Rule," and Draft Final Report NUREG-2163, "Technical Basis for Regulatory Guidance on the Alternate Pressurized Thermal Shock Rule" | 08/30/16 |
05/18/2016 | NuScale Power, LLC Licensing Topical Report, "Risk Significance Determination" | 07/11/16 |
05/18/2016 | Draft Interim Staff Guidance JLD-ISG-2016-01, "Guidance for Activities Related to Near-Term Task Force Recommendation 2.1, Flooding Hazard Reevaluation; Focused Evaluation and Integrated Assessment" | 07/05/16 |
05/17/2016 | NRC Staff Updated Assessment of Fukushima Tier 2 Recommendations Related to Evaluation of Natural Hazards Other Than Seismic and Flooding | 06/17/16 |
04/28/2016 | Review and Evaluation of the NRC Safety Research Program | 09/08/16 |
04/20/2016 | NUREG-1927, Revision 1, "Standard Review Plan for Renewal Of Specific Licenses and Certificates of Compliance for Dry Storage of Spent Nuclear Fuel" | 05/27/16 |
04/19/2016 | Regulatory Guide 1.229, "Risk-Informed Approach for Addressing the Effects of Debris on Post-Accident Long-Term Core Cooling" | 06/03/16 |
04/18/2016 | Exemptions to the AP1000 Certified Design Included in the Levy Nuclear Plant Units 1 and 2 Combined License Application | 05/22/16 |
03/15/2016 | Non-Power Production or Utilization Facilities Proposed License Renewal Rulemaking | 04/07/16 |
03/15/2016 | Closure of Fukushima Tier 3 Recommendations Related to Containment Vents, Hydrogen Control, and Enhanced Instrumentation | 04/21/16 |
02/23/2016 | Draft Final Rule 10 CFR 50.46C, "Emergency Core Cooling System Performance During Loss-Of-Coolant Accidents (LOCA)" And Associated Regulatory Guides | 03/16/16 |
02/17/2016 | Peach Bottom Atomic Power Station Units 2 And 3 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request | 03/14/16 |
Page Last Reviewed/Updated Thursday, July 17, 2025
Page Last Reviewed/Updated Thursday, July 17, 2025