Date | Title | Response |
---|---|---|
12/20/2012 | Response to the EDO October 26, 2012, Letter Regarding Chapter 9 of the Safety Evaluation Report with Open Items for the US-APWR Design Certification Application | |
12/19/2012 | Response to the October 26, 2012, EDO Letter Regarding Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel | |
12/18/2012 | Draft Design Specific Review Standard for mPower iPWR Chapter 7 Instrumentation and Control Systems | 02/06/2013 |
12/17/2012 | Draft Final Regulatory Guide 4.22, "Decommission Planning During Operations" | No Response Required |
11/13/2012 | SECY-12-0110, “Consideration of Economic Consequences within the U.S. Nuclear Regulatory Commission’s Regulatory Framework” | |
11/08/2012 | ACRS Review of Staff’s Draft SECY Paper on Consideration of Additional Requirements for Containment Venting Systems for Boiling Water Reactors with Mark I and Mark II Containment Designs | 12/11/2012 |
11/07/2012 | Response to the August 15, 2012 EDO Letter Regarding ACRS Recommendations in Letter dated July 17, 2012 on the Draft Interim Staff Guidance Documents in Support of Tier 1 Orders | 12/13/2012 |
11/07/2012 | Long-Term Core Cooling for the South Texas Project Advanced Boiling Water Reactor Combined License Application | 12/07/2012 |
10/22/2012 | ACRS Assessment of the Quality of Selected NRC Research Projects – FY 2012 | |
10/18/2012 | Draft Safety Evaluation of WCAP-16793-NP, Revision 2, “Evaluation of Long-Term Cooling Considering Particulate, Fibrous and Chemical Debris in the Recirculating Fluid” | 11/19/2012 |
10/16/2012 | Withdrawal of Regulatory Guide 1.182 | No Response Required |
10/16/2012 | Proposed Regulatory Guide DG-1294 | No Response Required |
10/16/2012 | SECY-12-0064, Recommendations for Policy and Technical Direction to Revise Radiation Protection Regulations and Guidance | |
09/25/2012 | Draft Regulatory Guide DG-1290 (Proposed Revision of Regulatory Guide 1.59), “Design-Basis Floods for Nuclear Power Plants” | |
09/18/2012 | Interim Staff Guidance 8, Revision 3, “Burnup Credit in the Criticality Safety Analyses of PWR Spent Fuel in Transportation and Storage Casks” | |
09/18/2012 | Chapters 5, 8, 10, 11 and 12 of the Safety Evaluation Report with Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application | |
09/18/2012 | Chapter 9 of the Safety Evaluation Report with Open Items for the US-APWR Design Certification Application | |
09/17/2012 | Draft Final NUREG-1022, Revision 3, “Event Reporting Guidelines 10 CFR 50.72 and 50.73” | No Response Required |
09/17/2012 | Draft Final Regulatory Guides | No Response Required |
09/11/2012 | Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel | |
07/23/2012 | Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 2, License Amendment Request for an Extended Power Uprate | 08/10/2012 |
07/19/2012 | Draft Final NUREG-1934 (EPRI 1023259), “Nuclear Power Plant Fire Modeling Analysis Guidelines (NPP FIRE MAG)” | |
07/17/2012 | SECY-12-0081, “Risk-Informed Regulatory Framework for New Reactors” | No Response Required |
07/17/2012 | Draft Interim Staff Guidance Documents in Support of Tier 1 Orders | |
07/16/2012 | Proposed Regulatory Guides DG-1282, DG-3042, and DG-1269 | No Response Required |
06/20/2012 | Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 1, License Amendment Request for an Extended Power Uprate | |
06/19/2012 | NRC Staff’s Draft Plans and Status Summaries for Tier 3 Japan Lessons Learned Recommendations | |
06/18/2012 | Grand Gulf Nuclear Station, Unit 1, Extended Power Uprate License Amendment Request | |
06/18/2012 | Proposed Revision 1 to Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, ASME OM Code" | |
05/18/2012 | Chapters 3, 9, 14, and 19 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Rector Design Certification Application | |
05/17/2012 | Draft Final NUREG-1921, (EPRI Report 1023001),“EPRI/NRC-RES Fire Human Reliability Analysis Guidelines |
06/19/2012 |
05/15/2012 | State-of-the-Art Reactor Consequence Analyses (SOARCA) Project | 07/31/2013 Enclosure |
05/14/2012 | Withdrawal of Regulatory Guides 5.67 and 7.3 | No Response Required |
04/26/2012 | Draft Commission Paper, "Risk-Informed Regulatory Framework for New Reactors" | 05/30/2012 |
04/25/2012 | Spent Fuel Pool Study | 05/23/2012 |
04/25/2012 | Response to the January 24, 2012, EDO Letter Regarding the Progress Energy Florida Combined License Application for Levy Nuclear Plant, Units 1 and 2 | |
04/25/2012 | Chapters 6, 7, 15, and 18 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application | |
04/24/2012 | Report on the Safety Aspects of the License Renewal Application for the Columbia Generating Station | 07/06/2012 |
04/23/2012 | Extremely Low Probability of Rupture Project | 05/30/2012 |
04/16/2012 | Draft Final Regulatory Guide 4.20 | No Response Required |
04/16/2012 | Proposed Regulatory Guides DG-5028 and DG-1279 | No Response Required |
04/16/2012 | Disposition of the ACRS's Review of Draft 10 CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Dai-Ichi Event | |
04/03/2012 | Review and Evaluation of the Nuclear Regulatory Commission Safety Research Program | |
03/20/2012 | Report on the Final Safety Evaluation Report Associated With the Florida Power and Light Turkey Point Nuclear Plant Units 3 and 4 License Amendment Request for an Extended Power Uprate | 04/09/2012 |
03/15/2012 | Draft Final Regulatory Guide 1.82 | No Response Required |
03/15/2012 | Chapters 6, 7, 11, 13, 15, 16, and 18 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Reactor Design Certification Application | |
03/14/2012 | ACRS Review of Proposed Orders in Response to Fukushima Lessons Learned (SECY-12-0025) | 07/06/2012 |
03/13/2012 | Response to February 27, 2012 Letter Regarding Final Disposition of Fukushima-Related ACRS Recommendations in Letters dated October 13, 2011 and November 8, 2011 | |
02/16/2012 | Draft Final Revision 1 to Regulatory Guide 1.93,"Availability of Electric Power Sources" | 03/15/2012 |
02/15/2012 | Draft 10 CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Daiichi Event | 03/21/2012 |
02/13/2012 | Draft Final Regulatory Guides 1.160 and 4.11 | No Response Required |
02/13/2012 | International Isotopes Fluorine Extraction and Depleted Uranium De-Conversion Plant Safety Evaluation | No Response Required |
01/26/2012 | Proposed Draft Rule for 10 CFR 50.46c, "Emergency Core Cooling System Performance During Loss-of-Coolant Accidents" | 02/17/2012 |
01/24/2012 | Draft Final Regulatory Guides 7.4, 3.74, and 7.7 | No Response Required |