| Date |
Title |
| 02/11/1997 |
Draft AEOD Report On Grid Performance Factors |
| 02/12/1997 |
Proposed Final Generic Letter, "Revised Contents Of Monthly Operating Report" |
| 02/12/1997 |
Rulemaking Plan to Amend Financial Protection Requirements For Permanently Shutdown Nuclear Power Reactors --10 CFR 50.54 (W) And 10 CFR 140.11 |
| 02/12/1997 |
Proposed Supplement To Generic Letter 95-06, "Changes In The Operator Licensing Program" |
| 02/12/1997 |
Proposed Revision 3 To Regulatory Guide 1.134, "Medical Evaluation Of Licensed Personnel At Nuclear Power Plants" |
| 02/13/1997 |
Human Performance Program Plan |
| 02/20/1997 |
Proposed Rulemaking for Amendments to 10 CFR Parts 30, 40, 50, 70, and 72 -- Self Guarantee for Non-Profit And Non-Bond Issuing Licensees |
| 02/21/1997 |
Letter to Honorable Albert Gore, Jr., President of the United States Senate |
| 03/14/1997 |
Proposed Generic Letter Regarding Loss Of Reactor Coolant Inventory and Associated Potential For Loss Of Emergency Mitigation Functions While In A Shutdown Condition |
| 03/17/1997 |
Proposed Standard Review Plan Sections And Regulatory Guides For Risk-Informed, Performance-Based Regulation |
| 03/17/1997 |
Publication Of Proposed Journal Article Containing ROSA Test Data |
| 03/19/1997 |
NRC Office Of Nuclear Regulatory Research Program To Demonstrate The Adequacy Of The RELAP5/MOD3 Code To Analyze AP600 Passive Plant Behavior |
| 03/19/1997 |
Draft Regulatory Guide DG-1060, "FASB Standards For Decommissioning Cost Accounting" |
| 03/19/1997 |
Draft Regulatory Guide DG-1067, "Decommissioning Of Nuclear Power Reactors" |
| 03/24/1997 |
Draft Commission Paper to Provide A Status Report And Modified Approach For Fire Protection Rulemaking |
| 03/25/1997 |
Proposed Amendments To 10 CFR Part 55, "Initial Licensed Operator Examination Requirements" |
| 03/25/1997 |
Draft Regulatory Guide DG-1070, "Requirements For Sampling for Dedicating Simple, Metallic Commercial Grade Items In Nuclear Power Plants" |
| 04/08/1997 |
Proposed Regulatory Guidance Related To Implementation Of 10 CFR 50.59 (Changes, Tests and Experiments) |
| 04/08/1997 |
Proposed Rulemaking Plan for Amendments to Subpart H and Appendix A to 10 CFR Part 20 -- Respiratory Protection |
| 04/08/1997 |
Proposed Rule - Financial Assurance Requirements for Decommissioning Nuclear Power Reactors |
| 04/11/1997 |
Risk-Based Regulatory Acceptance Criteria For Plant-Specific Application Of Safety Goals |
| 04/11/1997 |
Proposed Rulemaking Plan for Emergency Planning Requirements for Permanently Shutdown Nuclear Power Plant Sites |
| 04/18/1997 |
Establishing a Benchmark On Risk During Low-Power And Shutdown Operations |
| 05/07/1997 |
Design Basis Verification |
| 05/08/1997 |
Proposed Final Policy Statement On The Restructuring and Economic Deregulation Of The Electric Utility Industry |
| 05/09/1997 |
The Policy Regarding Stockpiling Of Potassium Iodide |
| 06/17/1997 |
Proposed Staff Position Regarding Inclusion Of A Containment Spray System In The AP600 Design |
| 06/17/1997 |
Proposed Final Generic Letter, "Assurance Of Sufficient Net Positive Suction Head For Emergency Core Cooling And Containment Heat Removal Pumps" |
| 06/17/1997 |
Resolution Of The Multiple System Responses Program Issues |
| 06/18/1997 |
Proposed Generic Letter, "Potential For Degradation Of The Emergency Core Cooling System And The Containment Spray System After A Loss-Of-Coolant Accident Because Of Construction And Protective Coating Deficiencies And Foreign Material In The Containment" |
| 06/19/1997 |
Establishing A Benchmark On Risk During Low-Power And Shutdown Operations |
| 06/19/1997 |
Proposed Regulatory Guidance Related to Implementation Of 10 CFR 50.59 (Changes, Tests and Experiments) |
| 06/20/1997 |
Proposed Regulatory Approach Associated With Steam Generator Integrity |
| 06/23/1997 |
Regulatory Guidance For Implementation Of Digital Instrumentation And Control Systems |
| 06/30/1997 |
Proposed Rule, "Frequency Of Reviews And Audits For Emergency Preparedness Programs, Safeguards Contingency Plans, And Security Programs for Nuclear Power Reactors," (10 CFR Parts 50 And 73, PRM 50-59 And 50-60) |
| 07/14/1997 |
Proposed Regulatory Guide And Standard Review Plan Chapter For Risk-Informed, Performance-Based Inservice Inspection |
| 07/14/1997 |
Proposed Final Revisions to 10 CFR Part 26, Fitness-For-Duty Program Requirements |
| 07/15/1997 |
Proposed Final Revision 3 to Regulatory Guide 5.44, "Perimeter Intrusion Alarm System" |
| 07/15/1997 |
Proposed Direct Final Rulemaking: Changes To Paragraph (h) Of CFR 50.55a, "Codes And Standards" |
| 09/09/1997 |
Proposed Revision To Regulatory Guide 8.7, "Instructions For Recording and Reporting Occupational Radiation Exposure Data" |
| 09/09/1997 |
Proposed Revision To Regulatory Guide 5.62, "Reporting Of Safeguards Events" |
| 09/09/1997 |
Proposed Final Generic Letter "Assurance Of Sufficient Net Positive Suction Head For Emergency Core Cooling And Containment Heat Removal Pumps" |
| 09/10/1997 |
Proposed Rulemaking For Shutdown And Fuel Storage Pool Operations At Nuclear Power Plants |
| 09/10/1997 |
Draft Regulatory Guide DG-1069, Fire Protection Program For Permanently Shutdown And Decommissioning Nuclear Power Plants |
| 09/10/1997 |
Boiling Water Reactor Pressure Vessel Shell Weld Inspection Recommendations (BWRVIP-05) |
| 09/10/1997 |
Staff Action Plan To Improve The Senior Management Meeting Process |
| 09/11/1997 |
Proposed Generic Letter, "Laboratory Testing Of Nuclear-Grade Activated Charcoal" |
| 09/11/1997 |
Reporting Reliability and Availability Information For Risk-Significant Systems And Equipment |
| 09/15/1997 |
Proposed Generic Letter and Draft Regulatory Guide DG-1074 Concerning Steam Generator Tube Integrity |
| 09/19/1997 |
Site-To-Site Variation In Risk-Based Regulatory Acceptance Criteria For Plant-Specific Application Of Safety Goals |
| 10/08/1997 |
Human Performance And Human Reliability Implementation Plan |
| 10/09/1997 |
Proposed Changes To 10 CFR 50.59 And Proposed Revision 1 To Generic Letter 91-18 |
| 10/10/1997 |
Resolution Of the Differing Professional Opinion Related To Steam Generator Tube Integrity |
| 10/15/1997 |
Proposed Final Amendments To 10 CFR Part 73, "Changes To Nuclear Power Plant Security Requirements" |
| 10/15/1997 |
Proposed Final Generic Letter, "Degradation Of Steam Generator Internals" |
| 10/15/1997 |
Proposed Final Generic Letter, "Steam Generator Tube Inspection Techniques" |
| 11/13/1997 |
Proposed Final Generic Letter, "Loss Of Reactor Coolant Inventory And Associated Potential For Loss Of Emergency Mitigation Functions While In A Shutdown Condition" |
| 11/14/1997 |
Draft Regulatory Guide DG-1029, Revision 1.7, "Guidelines For Evaluating Electromagnetic And Radio-Frequency Interference In Safety-Related I&C Systems" |
| 12/09/1997 |
Draft Regulatory Guide DG-1071, "Standard Format And Content For Post-Shutdown Decommissioning Activities Report" |
| 12/09/1997 |
Proposed Generic Letter,"Augmented Inspection Pf Pressurized-Water Reactor Class 1 High-Pressure Safety Injection Piping" |
| 12/10/1997 |
Proposed Final Revision 1 To Nureg-1022,"Event Reporting Guidelines 10 CFR 50.72 And 50.73" |
| 12/10/1997 |
Proposed Generic Letter On Interim Guidance For Updating Final Safety Analysis Reports |
| 12/10/1997 |
Year 2000 Computer Issue |
| 12/11/1997 |
Proposed Final Regulatory Guide 1 174 And Standard Review Plan chapter 19 For Risk-Informed, Performance-Based Regulation |
| 12/12/1997 |
Proposed Revisions To 10 CFR 50.59 (Changes, Tests And Experiments) |
| 12/12/1997 |
Credit For Containment Overpressure to Provide Assurance Of Sufficient Net Positive Suction Head For Emergency Core Cooling And Containment Heat Removal Pumps |
| 12/16/1997 |
Treatment Of Uncertainties Versus Point Values In The PRA-Related Decisionmaking Process |