Stakeholder Position Papers
As a part of the NRC's open process to resolve key safety and licensing issues, stakeholders are encouraged to communicate opinions to the staff on technical or policy issues. The NRC has received the following written stakeholder position papers.
Date | Topic | Author Affiliation |
---|---|---|
12/18/20 | NEI Input on Regulatory Priorities for New and Advanced Reactors | NEI |
11/23/20 | NEI Input on NRC Annual Fee Assessment for Non-Light Water Reactors | NEI |
03/30/20 | Advanced Reactor Codes and Standards Needs Assessment | NEI |
03/05/20 | NEI Recommendations for Streamlining Environmental Reviews for Advanced Reactors | NEI |
11/25/19 | Technology Inclusive Content of Application Project for Non-Light Water Reactors Definition of Fundamental Safety Functions for Advanced Non-Light Water Reactors – Draft Report Revision B | Southern/DOE |
11/13/19 | Micro-Reactor Regulatory Issues | NEI |
09/18/19 | Establishing Interface Requirements for "Major Portions" Standard Design Approval | Nuclear Innovation Alliance |
08/26/19 | NEI-18-04 "Risk-Informed Performance-Based Technology Guidance for Non-Light Water Reactors," Rev. 1 | NEI |
05/31/19 | Topical Report EPRI-AR-1(NP), "Uranium Oxycarbide (UCO) Tristructural Isotropic (TRISO) Coated Particle Fuel Performance" | EPRI |
05/31/19 | ANL/NE-16/17, Rev. 1 "Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification" | Argonne National Laboratory |
02/19/19 | Advanced Nuclear Environmental Permitting Reform | Clearpath |
09/28/18 | NEI-18-04 Risk-Informed Performance-Based Guidance for Non-Light Water Reactor Licensing Basis Development, Rev. 0 | NEI |
June 2018 | Nuclear Metal Fuel: Characteristics, Design, Manufacturing, Testing, and Operating History | Fast Reactor Working Group |
05/11/18 | Proposed Guidance for Preparing and Reviewing Molten Salt Nonpower Reactor License Applications | Oak Ridge National Laboratory |
01/24/18 | Addressing the Challenges with Establishing the Infrastructure for the front-end of the Fuel Cycle for Advanced Reactors | NEI |
12/12/17 | Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy | Southern/DOE |
10/11/17 | Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components | Southern/DOE |
06/02/17 | Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors - Probabilistic Risk Assessment Approach | Southern/DOE |
04/24/17 | Clarifying "Major Portions" of a Reactor Design in Support of a Standard Design Approval | NEI/NIA |
04/13/17 | Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors - Selection of Licensing Basis Events, Draft Report Revision 0 | Southern/DOE |
12/14/16 | Proposed Physical Security Requirements for Advanced Reactor Technologi0es Also see additional information provided by NEI on 09/08/17 | NEI |
04/11/16 | White Paper on Strategies for Advanced Reactor Licensing | NIA |
03/23/16 | Proposed Approach to Offsite Power Requirements for Small Modular Reactors and Other New Technologies | NEI |
06/11/14 | NRC Questions on NEI White Paper Describing Proposed Methodology and Criteria Regarding Small Modular Reactor Emergency Planning Zone | NRC |
03/14/14 | White Paper on Proposed Improvements to Tier 1 and the Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) for Small Modular Reactors | NEI |
12/23/13 | White Paper on Proposed Methodology and Criteria for Establishing the Technical Basis for Small Modular Reactor Emergency Planning Zone | NEI |
12/20/13 | Request for NRC Acceptance of an Alternative Process for Small Modular Reactor Design Certification Application Submittals | NEI |
12/27/12 | Small Modular Reactor Source Terms | NEI |
09/04/12 | Development of an Emergency Planning and Preparedness Framework for Small Modular Reactors | NEI |
07/31/12 | Physical Security for Small Modular Reactors | NEI |
09/23/11 | Control Room Staffing For Small Reactors | NEI |
06/06/11 | Insurance and Liability Requirements for Small Reactors | NEI |
01/14/11 | Small Modular Reactor Pre–Application Engagement | NEI |
12/20/10 | License Structure for Multi–Module Small Modular Reactor Facilities | NEI |
11/20/10 | Decommissioning Funding for Small Reactors | NEI |
10/31/10 | NRC Annual Fee Assessment for Small Reactors | NEI |
Page Last Reviewed/Updated Tuesday, February 11, 2025
Page Last Reviewed/Updated Tuesday, February 11, 2025