Issue Date: 02/11/02
NRC INSPECTION MANUAL IIPB
| All Files in ZIP Format | cn 02-005.zip |
| DELETED: | TRANSMITTED: | |||
| Number | Date | Number | Date | |
| 1. | IMC 0305 | 04/24/00 | IMC 0305 | 02/11/02 |
| TRAINING: | No special training requirements have been identified for any documents issued with this change notice. |
| REMARKS: | IMC 0305 (Operating Reactor Assessment Program) has been revised to incorporate lessons learned since its initial issuance. Major areas where changes were made include: (1) Adding a definition of a substantive cross-cutting issue, (2) Adding a process for considering old design issues, and (3) Adding examples of when deviations from the Action Matrix should be considered. |
|
DISTRIBUTION: |
Standard |
END