NRC Inspection Manual PIPB
Table of Contents - (wpd version)
| Table of Contents Current through Change Notice 01-021, Issued 10/11/01 | |||
| PART | CHAPTER | ||
| 0000 | NRC Inspection Manual(1) | ||
| 0030 | Policy and Guidance for Development of NRC Inspection Manual Programs | 04/30/97 (97-005) | |
| 0040 | Preparing, Revising, and Issuing Documents for the NRC Inspection Manual | 08/16/01 (01-015) | |
| 0100 | Program Responsibilities | ||
| 0102 | Oversight and Objectivity of Inspectors and Examiners at Reactor Facilities | 06/29/99 (99-010) | |
| 0111 | Monitoring Activities for the DOE West Valley Demonstration Project | 12/10/85 (85-40) | |
| 0200 | Program Management Reports | ||
| 0230 | Morning Report | 10/30/92 (92-011) | |
| 0300 | Inspection Policy | ||
| 0300 | Announced and Unannounced Inspections | 03/24/94 (94-010) | |
| 0301 | Coordination of NRC Visits to Commercial Reactor Sites | 08/24/01 (01-016) | |
| 0302 | Inspection Program Evaluation Activities | 09/27/95 (95-013) | |
| 0303 | Item Reporting | 11/30/99 (99-008) | |
| 0304 | Plant Performance Review | 09/26/96 (96-020) | |
| 0305 | Operating Reactor Assessment Program | 03/23/01 (01-009) | |
| 0307 | Reactor Oversight Process Self-Assessment Program | 04/12/01 (01-012) | |
| 0312 | Technical Assistance for Radiation Safety Inspections at Nuclear Fuel Cycle Facilities and Materials Licensees' Sites | 08/28/95 (95-010) | |
| 0330 | Guidance for NRC Review of Licensee Draft Documents | 07/08/96 (96-015) | |
| 0350 | Staff Guidelines for Oversight of Operating Reactor Facilities in an Extended Shutdown as a Result of Significant Performance Problems | 03/06/01 (01-006) | |
| 0400 | Enforcement Policy | ||
| 0500 | Tracking Systems | ||
| 0600 | Documentation of Program Findings | ||
| 0608 | Performance Indicator Program | 04/12/01 (01-012) | |
| 0609 | Significance Determination Process | 08/16/01 (01-015) | |
| 0609.01 | Enforcement Review Panel | 04/21/00 (00-007) | |
| 0609.02 | Process For Appealing NRC Characterization of Inspection Findings (SDP Appeal Process) | 08/16/01 (01-015) | |
| 0609.03 | Senior Reactor Analyst Support Objectives | 08/16/01 (01-015) | |
| 0609, App A | Significance Determination of Reactor Inspection Findings for At-Power Situations | 02/05/01 (01-003) | |
| 0609, App B | Emergency Preparedness Significance Determination Process | 12/29/00 (00-030) | |
| 0609, App C | Occupational Radiation Safety Significance Determination Process | 04/21/00 (00-007) | |
| 0609, App D | Public Radiation Safety Significance Determination Process | 04/21/00 (00-007) | |
| 0609, App E | Interim Physical Protection - Significance Determination Process | 08/14/01 (01-014) | |
| 0609, App F | Fire Protection Significance Determination Process | 02/27/01 (01-005) | |
| 0609, App F, Att 1 | Application of Fire Protection Risk-Significant Screening Methodology to Hypothetical Cases | 02/27/01 (01-005) | |
| 0609, App F, Att 2 | Additional Guidance for the Assessment of Findings Using Significance Determination Process Entry | 02/27/01 (01-005) | |
| 0609, App G | Shutdown Operations Significance Determination Process | 02/27/01 (01-005) | |
| 0609, App H | Containment Integrity Significance Determination Process | 04/21/00 (00-007) | |
| 0609, App I | Operator Requalification - Human Performance Significance Determination Process | 12/29/00 (00-030) | |
| 0610 | Inspection Reports | 06/22/98 (98-009) | |
| 0610* | Power Reactor Inspection Reports | 02/27/01 (01-005) | |
| 0620 | Inspection Documents and Records | 07/08/96 (96-015) | |
| 0630 | Analysis of the Impact of Noncompliance with Physical Security Requirements | 10/01/82 (82-09) | |
| 0700 | Communications With Licensees | ||
| 0720 | Nuclear Regulatory Commission Generic Communications Regarding Nuclear Reactor Issues | 03/21/94 (94-009) | |
| 0730 | Generic Communications Regarding Materials and Fuel Cycle Issues | 11/15/99 (99-018) | |
| 0800 | Feedback - Improving the Regulatory Process | ||
| 0801 | Inspector Feedback | 01/01/83 (83-01) | |
| 0900 | Reporting of Events/Incidents | ||
| 0970 | Potentially Generic Questions Identified by Regional Offices | 12/11/00 (00-024) | |
| 1000 | Regional Office Program Interfaces | ||
| 1007 | Interfacing Activities Between Regional Offices of NRC and OSHA | 09/25/01 (01-019) | |
| 1010 | Independent Assessment and Analysis | 01/20/87 (87-02) | |
| 1100 | Notifications of Meetings and Conferences | ||
| 1100 | Notification of Significant Meetings | 08/06/87 (87-27) | |
| 1110 | Potential Abnormal Occurrences | 04/25/78 (78-13) | |
| 1120 | Preliminary Notifications | 12/27/94 (94-021) | |
| 1200 | Inspector Requirements | ||
| 1201 | Conduct of Employees | 06/29/99 (99-010) | |
| 1220 | Processing of NRC Form 241, "Report of Proposed Activities In Non-Agreement States," and Inspection of Agreement State Licensees Operating Under 10 CFR 150.20 | 09/08/97 (97-014) | |
| 1220/001 | Inspection of Agreement State Licensees Operating Under 10 CFR 150.20 | 02/13/01 (01-004) | |
| 1230 | Quality Assurance Program for Radiological Confirmatory Measurements | 10/01/83 (83-12) | |
| 1232 | Collection, Preparation, and Shipment of Independent Measurement Samples | 11/18/86 (86-52) | |
| 1240 | Inspector Access at Power Reactors | 09/18/81 (81-23) | |
| 1245 | Inspector Qualification For the Office of Nuclear Reactor Regulation Inspection Program | 04/09/01 (01-011) | |
| 1245 APP A | Training Requirements For Inspector Classifications | 04/09/01 (01-011) | |
| Sec. I | BWR Operations Inspector | 09/14/99 (99-015) | |
| Sec. II | Westinghouse PWR Operations Inspector | 09/14/99 (99-015) | |
| Sec. III | Combustion Engineering PWR Operations Inspector | 09/14/99 (99-015) | |
| Sec. IV | Babcock & Wilcox PWR Operations Inspector | 09/14/99 (99-015) | |
| Sec. V | Reactor Engineering Support Inspector | 09/14/99 (99-015) | |
| Sec. VI | Reactor Health Physics Inspector | 09/14/99 (99-015) | |
| Sec. VII | Reactor Safeguards Inspector | 09/14/99 (99-015) | |
| Sec. VIII | Reactor Technical Specialist/Team Member | 09/14/99 (99-015) | |
| Sec. IX | Reactor Emergency Preparedness or Health Physics Specialist/Team Member | 09/14/99 (99-015) | |
| Sec. X | Non-Power Reactor Inspector | 09/14/99 (99-015) | |
| Sec. XI | Emergency Preparedness Inspector | 09/14/99 (99-015) | |
| Sec. XII | NRR Vendor Inspector | 10/10/97 (97-017) | |
| Sec. XIII | Reactor Decommissioning Inspector | 09/14/99 (99-015) | |
| Sec. XIV | Technical Assistance Inspector | 09/14/99 (99-015) | |
| Sec. XV | Senior Reactor Analyst | 04/09/01 (01-011) | |
| 1245 APP B | Inspector Training and Qualification Journal | 04/09/01 (01-011) | |
| Sec. I BWR | Operations Inspector | 09/14/99 (99-015) | |
| Sec. II | Westinghouse PWR Operations Inspector | 09/14/99 (99-015) | |
| Sec. III | Combustion Engineering PWR Operations Inspector | 09/14/99 (99-015) | |
| Sec. IV | Babcock & Wilcox PWR Operations Inspector | 09/14/99 (99-015) | |
| Sec. V | Reactor Engineering Support Inspector | 09/14/99 (99-015) | |
| Sec. VI | Reactor Health Physics Inspector | 10/10/97 (97-017) | |
| Sec. VII | Reactor Safeguards Inspector | 10/10/97 (97-017) | |
| Sec. VIII | Reactor Technical Specialist/Team Member | 09/14/99 (99-015) | |
| Sec. IX | Reactor Emergency Preparedness or Health Physics Specialist/Team Member | 10/10/97 (97-017) | |
| Sec. X | Non-Power Reactor Inspector | 10/10/97 (97-017) | |
| Sec. XI | Emergency Preparedness Inspector | 10/10/97 (97-017) | |
| Sec. XII | NRR Vendor Ins pector | 10/10/97 (97-017) | |
| Sec. XIII | Reactor Decommissioning Inspector | 10/10/97 (97-017) | |
| Sec. XIV | Technical Assistance Inspector | 01/21/98 (98-001) | |
| Sec. XV | NRC Senior Reactor Analyst Qualification Journal | 04/09/01 (01-011) | |
| 1246 | Formal Qualification Programs in the Nuclear Material Safety and Safeguards Program Area | 01/05/01 (01-002) | |
| 1246, Appendix A | Training Activities | 01/05/01 (01-002) | |
| Sec. I | Materials License Reviewer | 01/05/01 (01-002) | |
| Sec. II | Materials Health Physics Inspector | 01/05/01 (01-002) | |
| Sec. III | Fuel Cycle Safety Inspector | 01/05/01 (01-002) | |
| Sec. IV | Fuel Cycle Safeguards Inspector - Physical Security | 01/05/01 (01-002) | |
| Sec. V | NMSS Headquarters Fuel cycle Safeguards Inspector - Material Control & Accounting | 01/05/01 (01-002) | |
| Sec. VI | NMSS Headquarters Transportation Packaging & Dry Storage System Safety Inspector | 01/05/01 (01-002) | |
| Sec. VII | Fuel Cycle License Reviewer | 01/05/01 (01-002) | |
| Sec. VIII | Waste Management Inspectors & License Reviewers | 01/05/01 (01-002) | |
| Sec. IX | Decommissioning Inspector | 01/05/01 (01-002) | |
| Sec. X | Decommissioning Project Manager/Technical Reviewer | 01/05/01 (01-002) | |
| Sec. XI | Materials Exempt Distribution License Reviewer | 01/05/01 (01-002) | |
| Sec. XII | Uranium Recovery Inspector | 01/05/01 (01-002) | |
| Sec. XIII | Uranium Recovery Project Manager/Technical Reviewer | 01/05/01 (01-002) | |
| Sec. XIV | High-Level Waste Repository Inspector | 01/05/01 (01-002) | |
| Sec. XV | High-Level Waste Repository License Technical Reviewer | 01/05/01 (01-002) | |
| 1246, Appendix B | NRC Inspector, License Reviewer & Project Manager/Technical Reviewer Training & Qualification Journal | 01/05/01 (01-002) | |
| Sec. I | Materials License Reviewer | 01/05/01 (01-002) | |
| Sec. II | Materials Health Physics Inspector | 01/05/01 (01-002) | |
| Sec. III | Fuel Cycle Safety Inspector | 01/05/01 (01-002) | |
| Sec. IV | Fuel Cycle Safeguards Inspector - Physical Security | 01/05/01 (01-002) | |
| Sec. V | NMSS Headquarters Fuel Cycle Safeguards Inspector - Material Control and Accounting (MC&A) | 01/05/01 (01-002) | |
| Sec. VI | NMSS Headquarters Transportation Packaging & Dry Storage System Safety Inspector | 01/05/01 (01-002) | |
| Sec. VII | Fuel Cycle License Reviewer | 01/05/01 (01-002) | |
| Sec. VIII | Waste Management Inspector & License Reviewer | 01/05/01 (01-002) | |
| Sec. IX | Decommissioning Inspector | 01/05/01 (01-002) | |
| Sec. X | Decommissioning Project Manager/Technical Reviewer | 01/05/01 (01-002) | |
| Sec. XI | Materials Exempt Distribution License Reviewer | 01/05/01 (01-002) | |
| Sec. XII | Uranium Recovery Inspector | 01/05/01 (01-002) | |
| Sec. XIII | Uranium Recovery Project Manager/Technical Reviewer | 01/05/01 (01-002) | |
| Sec. XIV | High-Level Waste Repository Inspector | 01/05/01 (01-002) | |
| Sec. XV | High-Level Waste Repository License Technical Reviewer | 01/05/01 (01-002) | |
| 1300 | Incident Response | ||
| 1301 | Response to Non-Emergency Incidents Involving Radioactive Material | 10/20/00 (00-022) | |
| 1302 | Action Levels For Radiation Exposures and Contamination Associated With Materials Events Involving Members of the Public | 12/31/97 (97-019) | |
| 1303 | Requesting Emergency Acceptance of Radioactive Material by the U.S. Department of Energy (DOE) | 07/27/95 (95-009) | |
| 1330 | Response to Transportation Accidents Involving Radioactive Materials | 07/19/84 (84-22) | |
| 1360 | Use of Physician and Scientific Consultants in the Medical Consultant Program | 01/27/99 (99-001) | |
| 1400 | Reserved | ||
| 1415 | State Contracts for Environmental Monitoring | 06/28/91 (91-009) | |
| 1500 | Reserved | ||
| 1600 | Emergency Preparedness | ||
| 1601 | Communication Protocol For Assessing Offsite Emergency Preparedness Following a Natural Disaster | 09/02/97 (97-013) | |
| 1700 | Reserved | ||
| 1800 | Reserved | ||
| 1900 | Reserved | ||
| 2000 | Reserved | ||
| 2100 | Reserved | ||
| 2200 | Reserved | ||
| 2300 | High Level Waste | ||
| 2300 | Yucca Mountain Pre-Operation Inspection Program | 06/20/01 (01-013) | |
| 2400 | Low Level Waste Program | ||
| 2401 | Near-Surface Low-Level Radioactive Waste Disposal Facility Inspection Program | 02/28/97 (97-003) | |
| 2410 | Conduct of Observation Audits | 07/12/00 (00-012) | |
| 2500 | Reactor Inspection Program | ||
| 2514 | Light Water Reactor Inspection Program - Startup Testing Phase | 08/21/89 (89-013) | |
| 2514 APP. A | Startup Test Program Inspection Procedures | 04/15/94 (94-018) | |
| 2515 | Light-Water Reactor Inspection Program - Operations Phase | 03/06/01 (01-006) | |
| 2515 APP. A | Risk-Informed Baseline Inspection Program | 03/06/01 (01-006) | |
| 2515 APP. B | Supplemental Inspection Program | 03/06/01 (01-006) | |
| 2515 APP. C | Special and Infrequently Performed Inspections | 03/06/01 (01-006) | |
| 2515 APP. D | Plant Status | 04/03/00 (00-003) | |
| 2515/141 | Review of Year 2000 (Y2K) Readiness of Computer Systems at Nuclear Power Plants | 04/13/99 (99-006) | |
| 2515/142
Revision 1 |
Draindown During Shutdown and Common-Mode Failure (NRC Generic Letter 98-02) | 08/02/99 (99-012) | |
| 2515/144 | Performance Indicator Data Collecting and Reporting Process Review | 12/11/00 (00-024) | |
| 2515/145 | Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2001-01) | 09/20/01 (01-018) | |
| 2516 | Policy and Guidance For The License Renewal Inspection Program | 01/08/01 (01-001) | |
| 2530 | Integrated Design Inspection Program | 04/24/85 (85-17) | |
| 2535 | Design Verification Programs | 03/24/89 (89-007) | |
| 2545 | Research and Test Reactor Inspection Program - Operations Phase | 06/13/85 (85-23) | |
| 2561 | Decommissioning Power Reactor Inspection Program | 08/11/97 (97-012) | |
| 2561/003 | Re-Examination of Year 2000 (Y2K) Program Activities at Selected Decommissioining Reactors | 11/30/99 (99-0190 | |
| 2600 | Fuel Cycle Facility Inspection Program | ||
| 2600 | Fuel Cycle Facility Operational Safety and Safeguards Inspection Program | 04/08/96 (96-007) | |
| 2600 App A | 04/08/96 (96-007) | ||
| 2600/002 | Fuel Cycle Inspections of Licensees in States Which Have Been Denied Access to Low-Level Waste Disposal Facilities | 03/11/91 (91-004) | |
| 2600/003 | Operational Safety Review | 01/27/99 (99-001) | |
| 2600/004 | Headquarters Inspections of Critical Mass and Rare-Earth Fuel Cycle Licensees | 01/27/99 (99-001) | |
| 2600/005 | Criticality Safety Programs at Fuel Cycle Facilities | 10/12/99 (99-017) | |
| 2600/006 | Resident Inspection Program For Category I Fuel Cycle Facilities | 07/12/00 (00-012) | |
| 2600/007 | Interim Guidance For Fuel Cycle Facility Core Inspection Program | 08/25/00 (00-014) | |
| 2601 | Team Assessments of Fuel Cycle and Materials Licensees | 05/04/90 (90-004) | |
| 2602 | Decommissioning Inspection Program For Fuel Cycle Facilities and Materials Licensees | 06/04/97 (97-007) | |
| 2603 | Inspection of the Nuclear Chemical Process Safety Program at Fuel Cycle Facilities | 01/16/96 (96-001) | |
| 2603/001 | Chemical Safety Inspections of Fuel Cycle Licensees | 01/16/96 (96-001) | |
| 2605 | Decommissioning Procedures For Fuel Cycle and Material Licensees | 11/12/96 (96-022) | |
| 2610 | Inspection Program at Nuclear Fuel Services Plant Erwin, Tennessee | 01/09/86 (86-01) | |
| 2620 | On-Site Construction Reviews of Remedial Action at Inactive Uranium Mill Tailing Sites (Title I, Uranium Mill Tailing Radiation Control Act) | 01/05/01 (01-020) | |
| 2630 | Gaseous Diffusion Plant Operational Safety and Safeguards Inspection Program | 12/30/96 (96-026) | |
| 2641 | In-Situ Leach Facilities Inspection Program | 08/25/00 (00-014) | |
| 2681 | Physical Protection and Transport of SNM and Irradiated Fuel Inspections of Fuel Facilities | 09/26/96 (96-020) | |
| 2681 | Exh. 5 | 08/20/86 (86-40) | |
| 2681 | Exh. 6 | 08/20/86 (86-40) | |
| 2681/05 | Physical Security Inspection For Category I Fuel Cycle Facilities | 05/04/90 (90-004) | |
| 2681/06 | Protected Area Housekeeping | 07/10/90 (90-006) | |
| 2682 | Technical Assistance for Safeguards MC&A Inspections at Fuel Facilities | 06/18/84 (84-18) | |
| 2683 | MC&A Inspection of Fuel Cycle Facilities | 07/22/99 (99-011) | |
| 2690 | Inspection Program For Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations | 04/09/97 (97-004) | |
| 2690 App A | Inspection Program for an ISFSI Located at a Reactor Site | 04/09/97 (97-004) | |
| 2690 App B | Inspection Program for an ISFSI Located Away From Any Reactor Site | 04/09/97 (97-004) | |
| 2700 | Licensee Contractor and Vendor Inspection Program | ||
| 2700 | Vendor Inspection Program (VIP) | 10/29/90 (90-013) | |
| 2800 | Materials Inspection Program | ||
| 2800 | Materials Inspection Program | 12/01/00 (00-026) | |
| 2800/026, Rev. 2 | Followup Inspection of Formerly-Licensed Sites Identified as Potentially Contaminated | 07/12/00 (00-012) | |
| 2800/029. Rev. 1 | Nuclear Medicine Programs | 08/28/00 (00-013) | |
| 2800/030 | Verification of the Status of Devices Authorized for Use Under a General License | 05/30/00 (00-011) | |
| 2800/031 | Extremity Exposure Monitoring | 12/14/00 | |
| 2801 | Uranium Mill 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program | 08/25/00 (00-014) | |
| 2805 | Inspection at Temporary Job Sites for Licensees Who Operate in More Than One Region | 02/09/87 (87/03) | |
| 2810 | Master Materials License Inspection Program | 02/28/00 (00-002) | |
| 2815 | Construction and Preoperational Inspection of Panoramic, Wet-Source-Storage Gamma Irradiators | 03/27/01 (01-010) | |
| 2882 | Transfer of NRC License Files to Agreement State(s) | 12/05/83 (83-15) | |
| 2900 | Performance Appraisal Program | ||
| 2900 | Performance Appraisal Program DI | 04/04/85 (85-14) | |
| 2901 | Team Inspections | 08/24/01 (01-016) | |
| 2920 | Construction Appraisal Team Inspection Program | 03/29/85 (85-11) | |
| 3000 | Management Meetings | ||
| 30800B | Initial Management Meeting - Materials Licensees | 10/01/76 (76-26) | |
| 3100 | Reserved | ||
| 3200 | Reserved | ||
| 3300 | Reserved | ||
| 3400 | Reserved | ||
| 3500 | Quality Assurance | ||
| 35501 | QA for the Startup Test Program | 01/20/84 (84-04) | |
| 35701 | Quality Assurance Program Review | 09/17/01 (01-017) | |
| 3600 | Organization and Administration | ||
| 36100 | 10 CFR Part 21 Inspections at Nuclear Power Reactors | 08/30/91 (91-011) | |
| 36800 | Organization | 09/17/01 (01-017) | |
| 36801 | Organization, Management, and Cost Controls at Permanently Shutdown Reactors | 08/11/97 (97-012) | |
| 3700 | Design, Design Changes, Modifications | ||
| 37001 | 10 CFR 50.59 Safety Evaluation Program | 06/24/98 (98-010) | |
| 37550 | Engineering | 11/15/99 (99-018) | |
| 37551 | Onsite Engineering | 06/24/98 (98-010) | |
| 37700 | Design Changes, and Modifications | 09/17/01 (01-017) | |
| 3800 | Procurement | ||
| 38703 | Commercial Grade Dedication | 04/08/96 (96-007) | |
| 3900 | Records | ||
| 39701 | Records Program | 09/17/01 (01-017) | |
| 39745 | Class I Non-Power Reactors Organization and Operations and Maintenance Activities | 08/07/92(92-009) | |
| 4000 | Review and Audit | ||
| 40001 | Resolution of Employee Concerns | 06/03/97(97-006) | |
| 40002 | Inspections to Review Allegations | 08/26/96(96-018) | |
| 40500 | Effectiveness of Licensee Process to Identify, Resolve, and Prevent Problems | 05/03/99 (99-008) | |
| 40745 | Class I Non-Power Reactor Review and Audit and Design Change Functions | 08/07/92(92-009) | |
| 40755 | Class III Non-Power Reactors | 08/07/92(92-009) | |
| 40801 | Self-Assessment, Auditing, and Corrective Action at Permanently Shutdown Reactors | 08/11/97(97-012) | |
| 4100 | Training | ||
| 41500 | Training and Qualification Effectiveness | 06/13/95(95-007) | |
| 4200 | Procedures | ||
| 42001 | Emergency Operating Procedures | 06/28/91(91-009) | |
| 42700 | Plant Procedures | 11/15/95(95-015) | |
| 42745 | Class I Non-Power Reactor Procedures | 08/07/92(92-009) | |
| 4300 | Vendor Procedures | ||
| 43001 | Reactive Inspection of Nuclear Vendors | 10/11/94(94-018) | |
| 4400 | Reserved | ||
| 4500 | Geotechnical/Foundation | ||
| 4600 | Structural Concrete | ||
| 4700 | Containment (Post-Tensioning) | ||
| 4800 | Structural Steel and Supports | ||
| 4900 | Piping | ||
| 49001 | Inspection of Erosion/Corrosion Monitoring Programs | 12/11/98 (98-019) | |
| 49055 | Reactor Coolant Pressure Boundary Piping Record Review | 08/16/82(82-07) | |
| 5000 | Mechanical Components and Equipment | ||
| 50001 | Steam Generator Replacement Inspection | 09/06/00 (00-015) | |
| 50002 | Steam Generators | 12/31/96(96-024) | |
| 5100 | Electrical Components and Systems | ||
| 5200 | Instrumentation Systems and Components | ||
| 52001 | Digital Retrofits Receiving Prior Approval | 03/02/98(98-003) | |
| 52002 | Digital Retrofits Not Receiving Prior Approval | 03/02/98(98-003) | |
| 5300 | Containment Penetrations | ||
| 5400 | Cleanliness | ||
| 5500 | Welding | ||
| 55050 | Nuclear Welding General Inspection Procedure | 06/20/83(83-06) | |
| 55100 | Structural Welding General Inspection Procedure | 06/20/83(83-06) | |
| 5600 | Calibration | ||
| 5700 | Nondestructive Examination, Destructive Examination and Fabrication Testing | ||
| 57050 | Visual Testing Examination | 03/09/99 (99-003) | |
| 57060 | Liquid Penetrant Testing Examination | 03/09/99 (99-003) | |
| 57070 | Magnetic Particle Testing Examination | 03/09/99 (99-003) | |
| 57080 | Ultrasonic Testing Examination | 03/09/99 (99-003) | |
| 57090 | Nondestructive Examination Procedure Radiographic Examination Procedure Review/Work Observation/Record Review | 06/14/93(93-005) | |
| 5800 | Special Processes | ||
| 5900 | Reserve Shutdown System | ||
| 6000 | Fuel Fabrication, Handling and Storage | ||
| 60705 | Preparation for Refueling | 07/27/95(95-009) | |
| 60710 | Refueling Activities | 07/27/95(95-009) | |
| 60745 | Class I Non-Power Reactor Fuel Movement | 10/03/94(94-017) | |
| 60801 | Spent Fuel Pool Safety at Permanently Shutdown Reactors | 08/11/97(97-012) | |
| 60851 | Design Control of ISFSI Components | 05/22/00 (00-010) | |
| 60852 | ISFSI Component Fabrication By Outside Fabricators | 07/12/00 (00-012) | |
| 60853 | On-Site Fabrication of Components and Construction of an ISFSI | 09/07/00 (00-016) | |
| 60854 | Preoperational Testing of an ISFSI | 05/09/96(96-011) | |
| 60855 | Operation of an ISFSI | 02/01/96(96-003) | |
| 60856 | Review of 10 CFR 72.212(b) Evaluations | 11/30/99 (99-019) | |
| 60857 | Review of 10 CFR 72.48 | 03/09/01 (01-007) | |
| 6100 | Surveillance | ||
| 61705 | Calibration of Nuclear Instrumentation Systems | 05/12/86(86-25) | |
| 61706 | Core Thermal Power Evaluation | 07/14/86(86-36) | |
| 61707 | Determination of Reactor Shutdown Margin | 10/11/85(85-31) | |
| 61708 | Isothermal and Moderator Temperature Coefficient Determinations | 10/11/85(85-31) | |
| 61709 | Total Power Coefficient of Reactivity at Pressurized Water Reactors | 07/14/86(86-36) | |
| 61710 | Control Rod Worth Measurements (PWR) | 10/11/85(85-31) | |
| 61715 | Verification of Containment Integrity | 12/23/86(86-60) | |
| 61720 | Containment Local Leak Rate Testing | 10/03/85(85-30) | |
| 61726 | Surveillance Observations | 06/24/98(98-010) | |
| 61728 | Independent Measurement of RCS Leak Rates for a PWR | 01/01/84(84-02) | |
| 61745 | Class I Non-Power Reactor Surveillance | 08/07/92(92-009) | |
| 6200 | Maintenance | ||
| 62002 | Inspection of Structures, Passive Components, and Civil Engineering Features at Nuclear Power Plants | 12/31/96(96-024) | |
| 62003 | Inspection of Steel and Concrete Containments at Nuclear Power Plants | 06/11/97(97-008) | |
| 62700 | Maintenance Program Implementation | 04/04/00(00-005) | |
| 62706 | Maintenance Rule | 12/13/00 (00-028) | |
| 62709 | Configuration Risk Assessment and Risk Management Process | 12/28/00 (00-029) | |
| 62708 | Motor-Operated Valve Capability | 09/12/00 (00-018) | |
| 62801 | Maintenance and Surveillance at Permanently Shutdown Reactors | 08/11/97(97-012) | |
| 6300 | Construction Testing | ||
| 6400 | Fire Prevention/Protection | ||
| 64704 | Fire Protection Program | 06/24/98(98-010) | |
| 6500 | Reserved | ||
| 6600 | Reserved | ||
| 6700 | Reserved | ||
| 6800 | Reserved | ||
| 6900 | Non-Power Reactor Inspection | ||
| 69001 | Class II Non-Power Reactors | 04/09/97(97-004) | |
| 69003 | Class I Non-Power Reactor Operator Licenses, Requalification, and Medical Activities | 04/09/97(97-004) | |
| 69004 | Class I Non-Power Reactor Effluent and Environmental Monitoring | 04/09/97(97-004) | |
| 69005 | Class I Non-Power Reactor Experiments | 04/09/97(97-004) | |
| 7000 | Preoperational Testing | ||
| 70307 | Containment Integrated Leak Rate Test - Procedure Review | 03/07/86(86-13) | |
| 70313 | Containment Integrated Leak Rate Test | 11/12/85(85-36) | |
| 70323 | Containment Leak Rate Test Results Evaluation | 10/03/85(85-30) | |
| 70370 | Testing Piping Support and Restraint Systems | 03/07/86(86-13) | |
| 7100 | Operations (License & TS Requirements) | ||
| 71001 | Licensed Operator Requalification Program Evaluation | 09/18/00 (00-019) | |
| 71002 | License Renewal Inspection | 02/03/99 (99-002) | |
| 71111 | Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity | 12/11/00 (00-024) | |
| 71111.01 | Adverse Weather Protection | 04/03/00 (00-003) | |
| 71111.02 | Evaluation of Changes, Tests, or Experiments | 09/12/00 (00-018) | |
| 71111.04 | Equipment Alignment | 04/03/00 (00-003) | |
| 71111.05 | Fire Protection | 03/23/01 (01-009) | |
| 71111.06 | Flood Protection Measures | 04/03/00 (00-003) | |
| 71111.07 | Heat Sink Performance | 04/03/00 (00-003) | |
| 71111.08 | Inservice Inspection Activities | 10/11/01 (01-021) | |
| 71111.11 | Licensed Operator Requalification Program | 08/16/01 (01-015) | |
| 71111.12 | Maintenance Rule Implementation | 04/03/00 (00-003) | |
| 71111.13 | Maintenance Risk Assessments and Emergent Work Evolutions | 11/30/00 (00-025) | |
| 71111.14 | Personnel Performance During Nonroutine Plant Evolutions | 03/06/01 (01-006) | |
| 71111.15 | Operability Evaluations | 04/03/00 (00-003) | |
| 71111.16 | Operator Workarounds | 04/03/00 (00-003) | |
| 71111.17 | Permanent Plant Modifications | 09/12/00 (00-018) | |
| 71111.19 | Post Maintenance Testing | 04/03/00 (00-003) | |
| 71111.20 | Refueling and Outage Activities | 03/06/01 (01-006) | |
| 71111.21 | Safety System Design and Performance Capability | 04/03/00 (00-003) | |
| 71111.22 | Surveillance Testing | 04/03/00 (00-003) | |
| 71111.23 | Temporary Plant Modifications | 04/03/00 (00-003) | |
| 71114 | Reactor Safety-Emergency Preparedness | 04/12/01 (01-012) | |
| 71114.01 | Exercise Evaluation | 04/12/01 (01-012) | |
| 71114.02 | Alert and Notification System Testing | 04/03/00 (00-003) | |
| 71114.03 | Emergency Response Organization Augmentation Testing | 04/03/00 (00-003) | |
| 71114.04 | Emergency Action Level and Emergency Plan Changes | 04/03/00 (00-003) | |
| 71114.05 | Correction of Emergency Preparedness Weaknesses and Deficiencies | 04/03/00 (00-003) | |
| 71114.06 | Drill Evaluation | 04/03/00 (00-003) | |
| 71121 | Occupational Radiation Safety | 04/03/00 (00-003) | |
| 71121.01 | Access Control to Radiologically Significant Areas | 04/03/00 (00-003) | |
| 71121.02 | ALARA Planning and Controls | 04/03/00 (00-003) | |
| 71121.03 | Radiation Monitoring Instrumentation | 04/03/00 (00-003) | |
| 71122 | Public Radiation Safety | 04/03/00 (00-003) | |
| 71122.01 | Radioactive Gaseous and Liquid Effluent Treatment Monitoring Systems | 04/03/00 (00-003) | |
| 71122.02 | Radioactive Material Processing and Transportation | 04/03/00 (00-003) | |
| 71122.03 | Radiological Environmental Monitoring Program | 04/03/00 (00-003) | |
| 71130 | Physical Protection | 04/03/00 (00-003) | |
| 71130.01 | Access Authorization Program (Behavior Observation Only) | 09/12/00 (00-018) | |
| 71130.02 | Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization) | 09/12/00 (00-018) | |
| 71130.03 | Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy) | 09/12/00 (00-018) | |
| 71130.04 | Security Plan Changes | 09/12/00 (00-018) | |
| 71150 | Discrepant or Unreported Performance Indicator Data | 03/06/01 (01-006) | |
| 71151 | Performance Indicator Verification | 03/06/01 (01-006) | |
| 71152 | Identification and Resolution of Problems | 03/06/01 (01-006) | |
| 71153 | Event Followup | 03/06/01 (01-006) | |
| 71707 | Plant Operations | 12/31/98 (98-020) | |
| 71714 | Cold Weather Preparations | 09/17/01 (01-017) | |
| 71715 | Sustained Control Room and Plant Observation | 04/14/92(92-004) | |
| 71750 | Plant Support Activities | 06/24/98(98-010) | |
| 71801 | Decommissioning Performance and Status Review at Permanently Shutdown Reactors | 08/11/97(97-012) | |
| 71841 | Human Performance | 12/12/00 (00-027) | |
| 71846B | Review of Conduct of Operations | 10/01/76(76-24) | |
| 7200 | Startup Testing | ||
| 72300 | Startup Test Procedure Review | 01/20/84(84-04) | |
| 72301 | Startup Test Results Evaluation | 01/20/84(84-04) | |
| 72302 | Startup Test Witnessing and Observation | 01/20/84(84-04) | |
| 72400B | Overall Startup Test Program | 07/01/80(80-16) | |
| 72500B | Initial Fuel Loading Procedure | 04/30/75(75-16) | |
| 72502B | Initial Criticality Procedure Review (BWR) | 04/30/75(75-16) | |
| 72504B | Heatup Phase Procedure Review | 04/30/75(75-16) | |
| 72508B | Power Ascension Procedure Review: HPCI System | 07/01/80(80-16) | |
| 72509B | Power Ascension Procedure Review: Control Rod Drive System | 07/01/80(80-16) | |
| 72510B | Power Ascension Procedure Review - Relief Valves and MSIVs | 04/30/75(75-16) | |
| 72512B | Startup Test Procedure Review - RCIC or Recirculation Pump Trip | 04/30/75(75-16) | |
| 72514B | Startup Test Procedure Review - Turbine Trip/Generator Trip | 07/01/80(80-16) | |
| 72516B | Startup Test Procedure Review - Shutdown From Outside the Control Room (Group A) | 07/01/80(80-16) | |
| 72517B | Startup Test Procedure Review: Loss of Offsite Power (Group A & B) | 07/01/80(80-16) | |
| 72518B | Startup Test Procedure Review - Core Performance | 07/01/80(80-16) | |
| 72524 | Initial Fuel Loading Witnessing | 01/20/84(84-04) | |
| 72526 | BWR Initial Criticality Witnessing | 01/20/84(84-04) | |
| 72532 | Power Level Plateau Data Review (BWR) | 01/20/84(84-04) | |
| 72564B | Precritical Test Procedure Review - Protective Trip Circuit or Rod Drop Measurement | 07/01/80(80-16) | |
| 72566B | Precritical Test Procedure Review - RES Lead Test or or Pressurizer Effectiveness | 07/01/80(80-16) | |
| 72570B | Initial Criticality Procedure Review (PWR) | 07/01/80(80-16) | |
| 72572B | Low Power Test Procedures Review Moderator Temperature Coefficient and Boron Worth or Control Rod Worth and Pseudo Rod Ejection Worth | 07/01/80(80-16) | |
| 72576B | Power Ascension Test Procedure Review - Natural Circulation or Power Reactivity Coefficient Measurement | 07/01/80(80-16) | |
| 72578B | Power Ascension Test Procedure Review - Evaluation of Core Performance | 07/01/80(80-16) | |
| 72580B | Power Ascension Test Procedure Review - Turbine Trip or Generator Trip | 07/01/80(80-16) | |
| 72582B | Power Ascension Test Procedure Review - Loss of Offsite Power (Group A) | 07/01/80(80-16) | |
| 72583B | Power Ascension Test Procedure Review: Shutdown from Outside the Control Room (Group B) | 07/01/80(80-16) | |
| 72584B | Power Ascension Test Procedure Review - Evaluation of Flux Asymmetry or Pseudo Rod Ejection Test | 04/30/75(75-16) | |
| 72592 | PWR Initial Criticality Witnessing | 01/20/84(84-04) | |
| 72596B | Precritical Data Review 07/01/80 (80-16) | ||
| 72600B | Power Level Plateau Data Review (25% PWR) | 07/01/80(80-16) | |
| 72608B | Power Level Plateau Data Review (50% PWR) | 07/01/80(80-16) | |
| 72616B | Power Level Plateau Data Review (75% PWR) | 07/01/80(80-16) | |
| 72624B | Power Level Plateau Data Review (100% PWR) | 07/01/80(80-16) | |
| 72701 | Modification Testing | 04/14/92(92-004) | |
| 7300 | Inservice Inspection | ||
| 73051 | Inservice Inspection - Review of Program | 01/14/86(86-03) | |
| 73052 | Inservice Inspection - Review of Procedures | 01/14/86(86-03) | |
| 73753 | Inservice Inspection | 06/24/98(98-010) | |
| 73755 | Inservice Inspection - Data Review and Evaluation | 01/14/86(86-03) | |
| 73756 | Inservice Testing of Pumps and Valves | 07/27/95(95-009) | |
| 7400 | Reserved | ||
| 7500 | Reserved | ||
| 7600 | Reserved | ||
| 7700 | Reserved | ||
| 7800 | High Level Waste | ||
| 7900 | Water Chemistry | ||
| 79702 | Control and Monitoring of Radiological Source Term | 07/17/00 (00-006) | |
| 8000 | Environmental Protection | ||
| 80721 | Radiological Environmental Monitoring | 09/17/01 (01-017) | |
| 8100 | Physical Security | ||
| 81001 | Independent Spent Fuel Storage Installations | 09/17/01 (01-017) | |
| 81018 | Security Plan and Implementing Procedures | 05/09/84(84-15) | |
| 81020 | Management Effectiveness - Security Program | 05/09/84(84-15) | |
| 81022 | Security Organization | 05/09/84(84-15) | |
| 81034 | Security Program Audit | 05/09/84(84-15) | |
| 81038 | Records and Reports | 05/09/84(84-15) | |
| 81042 | Testing and Maintenance | 05/09/84(84-15) | |
| 81046 | Locks, Keys, and Combinations | 05/09/84(84-15) | |
| 81052 | Physical Barriers - Protected Areas | 05/09/84(84-15) | |
| 81054 | Physical Barriers - Vital Areas, Material Access Areas, and Controlled Access Areas | 05/09/84(84-15) | |
| 81058 | Security System Power Supply | 05/09/84(84-15) | |
| 81062 | Lighting | 05/09/84(84-15) | |
| 81064 | Compensatory Measures | 05/09/84(84-15) | |
| 81066 | Assessment Aids | 05/09/84(84-15) | |
| 81070 | Access Control - Personnel | 05/09/84(84-15) | |
| 81072 | Access Control (Power Reactor) - Packages | 05/09/84(84-15) | |
| 81073 | Access Control (Fuel Facility) - Packages, Material, and SSNM | 05/09/84(84-15) | |
| 81074 | Access Control - Vehicles | 05/09/84(84-15) | |
| 81078 | Detection Aids - Protected Areas | 05/09/84(84-15) | |
| 81080 | Detection Aids - VA, MAA, and CAA | 05/09/84(84-15) | |
| 81084 | Alarm Stations | 05/09/84(84-15) | |
| 81088 | Communications | 05/09/84(84-15) | |
| 81110 | Operational Safeguards Response Evaluation (OSRE) | 09/08/00 (00-017) | |
| 81310 | Physical Protection of Shipments of Irradiated Fuel | 02/20/86(86-09) | |
| 81335 | Physical Protection of Shipments of SNM of Moderate Strategic Significance (MSNM) | 02/20/86(86-09) | |
| 81340 | Physical Protection of Shipments of SNM of Low Strategic Significance (LSNM) | 02/20/86(86-09) | |
| 81360 | General Requirements for Physical Protection of Formula Quantities of Special Nuclear Material in Transit | 08/20/86(86-40) | |
| 81365 | Records, Reports, and Planning for Physical Protection of Formula Quantities of Special Nuclear Material in Transit | 08/20/86(86-40) | |
| 81370 | Specific Requirements for Physical Protection of Formula Quantities of Special Nuclear Materials in Transit | 08/20/86(86-40) | |
| 81401 | Plans, Procedures, and Reviews | 09/17/01 (01-017) | |
| 81402 | Reports of Safeguards Events | 06/13/85(85-23) | |
| 81403 | Receipt of New Fuel at Reactor Facilities | 09/17/01 (01-017) | |
| 81411 | Physical Protection for Reactors with Formula Quantities of Special Nuclear Material | 11/04/85(85-34) | |
| 81421 | Fixed Site Physical Protection of Special Nuclear Material of Moderate Strategic Significance | 06/13/85(85-23) | |
| 81431 | Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance | 09/17/01 (01-017) | |
| 81501 | Personnel Training and Qualification - General Requirements | 05/09/84(84-15) | |
| 81502 | Fitness For Duty Program | 05/31/91(91-008) | |
| 81601 | Safeguards Contingency Plan - Implementation Review | 05/09/84(84-15) | |
| 81700 | Physical Security Program for Power Reactors | 07/01/97(97-010) | |
| 81810 | Protection of Safeguards Information | 02/09/87(87-03) | |
| 81815 | Authorizations for Access to National Security Information (NSI) and Restricted Data (RD) | 04/30/97(97-005) | |
| 81820 | Physical Protection Facility Approval and Safeguarding of National Security Information (NSI) and Restricted Data (RD) | 04/30/97(97-005) | |
| 81910 | Alarm Stations | 02/19/91(91-003) | |
| 81911 | Assessment | 02/19/91(91-003) | |
| 81912 | Badge Control | 02/19/91(91-003) | |
| 81913 | Communications | 02/19/91(91-003) | |
| 81914 | Duress Alarms | 02/19/91(91-003) | |
| 81915 | EECP Machine Performance - Explosive Detectors | 02/19/91(91-003) | |
| 81916 | EECP Machine Performance - Metal Detectors | 02/19/91(91-003) | |
| 81917 | EECP Machine Performance - X-ray | 02/19/91(91-003) | |
| 81918 | Emergency Power Supply | 02/19/91(91-003) | |
| 81919 | Interior Alarms | 02/19/91(91-003) | |
| 81920 | Intrusion Detection System | 02/19/91(91-003) | |
| 81921 | Isolation Zone | 02/19/91(91-003) | |
| 81922 | Keys, Locks, and Combinations | 02/19/91(91-003) | |
| 81923 | Lighting | 02/19/91(91-003) | |
| 81924 | MAA Barriers | 02/19/91(91-003) | |
| 81925 | Personnel Searches | 02/19/91(91-003) | |
| 81926 | Preventative Maintenance | 02/19/91(91-003) | |
| 81927 | Protected Area Barriers | 02/19/91(91-003) | |
| 81928 | Protected Area Housekeeping | 02/19/91(91-003) | |
| 81929 | Strategic Special Nuclear Material Exit Searches | 02/19/91(91-003) | |
| 81930 | Tactical Response Team Exercises | 02/19/91(91-003) | |
| 81931 | Vehicle Barriers | 02/19/91(91-003) | |
| 81932 | Vehicle Escorts | 02/19/91(91-003) | |
| 81933 | Vehicle Searches | 03/18/91(91-005) | |
| 81934 | Warehouse Searches | 03/18/91(91-005) | |
| 81935 | Weapons Qualification | 02/19/91(91-003) | |
| 8200 | Emergency Planning | ||
| 82001 | Evaluation of Emergency Preparedness | 05/22/00 (00-010) | |
| 82301 | Evaluation of Exercises for Power Reactors | 12/31/96(96-024) | |
| 82302 | Review of Exercise Objectives and Scenarios for Power Reactors | 06/24/98(98-010) | |
| 82701 | Operational Status of the Emergency Preparedness Program | 12/31/96(96-024) | |
| 82745 | Research Reactor Emergency Plan | 08/07/92(92-009) | |
| 8300 | Radiation Protection | ||
| 83100 | Occupational Exposure During SAFSTOR and DECON | 12/30/91(91-022) | |
| 83501 | Significant Uncontrolled Radiation Exposures | 04/17/00 (00-006) | |
| 83502 | Evaluation of Public Radiation Safety | 04/17/00 (00-006) | |
| 83502.01 | Radioactive Gaseous and Liquid Treatment and Monitoring Systems | 04/17/00 (00-006) | |
| 83502.02 | Evaluation of Public Radiation Safety | 04/17/00 (00-006) | |
| 83502.03 | Radiological Environmental Monitoring Program and Radioactive Material Control Program | 04/17/00 (00-006) | |
| 83521 | Radiation Protection - Startup | 01/01/84(84-01) | |
| 83722 | Radiation Protection, Plant Chemistry, and Radwaste: Organization and Management Controls (Minimum/Basic) | 09/17/01 (01-017) | |
| 83723 | General Employee, Radiation Safety, Plant Chemistry, Radwaste, and Transportation Training | 04/07/00 (00-006) | |
| 83724 | External Occupational Exposure Control and Personal Dosimetry | 04/17/00 (00-006) | |
| 83725 | Internal Exposure Control and Assessment | 04/17/00 (00-006) | |
| 83726 | Control of Radioactive Materials and Contamination, Surveys, and Monitoring | 09/17/01 (01-017) | |
| 83727 | Facilities and Equipment (Basic) | 09/17/01 (01-017) | |
| 83728 | Maintaining Occupational Exposures ALARA | 04/17/00 (00-006) | |
| 83729 | Occupational Exposure During Extended Outages | 12/31/91(91-021) | |
| 83743 | Class I Non-Power Reactors Radiation Protection | 10/03/94(94-017) | |
| 83750 | Occupational Radiation Exposure | 03/15/94(94-006) | |
| 83801 | Inspection of Final Surveys at Permanently Shutdown Reactors | 08/11/97(97-012) | |
| 83822 | Radiation Protection | 09/07/00 (00-016) | |
| 83890 | Closeout Inspection and Survey | 03/07/94(94-004) | |
| 83895 | Radiation Protection - Followup on Expired Licenses | 11/08/83(83-13) | |
| 83895 | Tbl I | 07/11/85(85-24) | |
| 8400 | Radioactive Waste Management | ||
| 84100 | Special Nuclear Material Inspections At Near Surface Low- Level Waste Disposal Facilities In Agreement States | 05/29/92(92-006) | |
| 84101 | Radioactive Waste Management | 12/30/91(91-022) | |
| 84521 | Radwaste - Startup | 01/01/84(84-01) | |
| 84750 | Radioactive Waste Treatment, and Effluent and Environmental Monitoring | 03/15/94(94-006) | |
| 84850 | Radioactive Waste Management - Inspection of Waste Generator Requirements of 10 CFR 20 and 10 CFR 61 | 09/17/01 (01-017) | |
| 84900 | Low-Level Radioactive Waste Storage | 10/20/00 (00-022) | |
| 8500 | Material Control and Accountability | ||
| 85102 | Material Control and Accounting - Reactors | 03/29/85(85-10) | |
| 85200 | MC&A for Licensees Possessing Less Than or Equal to One Effective Kilogram of SNM | 04/10/85(85-15) | |
| 85203 | Facility Organization and Management Controls | 01/17/86(86-04) | |
| 85205 | Facility Operations and Internal Controls | 04/10/85(85-15) | |
| 85207 | Measurement Systems | 01/17/86(86-04) | |
| 85209 | Measurement Control and Statistics | 04/10/85(85-15) | |
| 85211 | Physical Inventory | 01/17/86(86-04) | |
| 85215 | Records and Reports | 01/17/86(86-04) | |
| 85301 | MC&A for Imports and Exports | 07/18/84(84-22) | |
| 85303 | MC&A Management Structure and Personnel Training and Qualification | 03/18/91(91-005) | |
| 85305 | Item Monitoring | 03/18/91(91-005) | |
| 85307 | Process Monitoring | 03/18/91(91-005) | |
| 85309 | Measurement Systems and Control | 03/18/91(91-005) | |
| 85311 | Physical Inventory | 03/18/91(91-005) | |
| 85313 | Alarm Resolution | 03/18/91(91-005) | |
| 85315 | Accounting and Internal Control | 03/18/91(91-005) | |
| 85401 | Management Structure | 07/22/99 (99-011) | |
| 85402 | Measurement Program | 07/22/99 (99-011) | |
| 85403 | Measurement Control Program | 07/22/99 (99-011) | |
| 85404 | Physical Inventory | 10/23/96(96-021) | |
| 85405 | Item Control Program | 07/22/99 (99-011) | |
| 85406 | Resolution Program | 10/23/96(96-021) | |
| 85407 | Assessment Program | 07/22/99 (99-011) | |
| 85408 | Recordkeeping | 07/22/99 (99-011) | |
| 85420 | Inspection of IAEA Safeguards for Inspectors at Power Reactors | 06/22/88(88-07) | |
| 85425 | Implementation of US/IAEA Safeguards Agreement at Fuel Facilities | 06/22/88(88-07) | |
| 85501 | Inventory Program | 07/22/99 (99-011) | |
| 85502 | Detection Program | 07/22/99 | |
| 85503 | Resolution Program | 07/22/99 | |
| 8600 | Spent Fuel and Other Radioactive Material Packaging and Shipping | ||
| 86001 | Design, Fabrication, Testing, and Maintenance of Transportation Packagings | 10/23/96(96-021) | |
| 86700 | Spent Fuel Pool Activities | 09/17/01 (01-017) | |
| 86721 | Transportation (Basic) | 09/17/01 (01-017) | |
| 86730 | Transportation of Radioactive Materials (49 CFR Parts 100-179 and 10 CFR Part 71) | 04/17/00 (00-006) | |
| 86740 | Inspection of Transportation Activities | 09/17/01 (01-017) | |
| 86750 | Solid Radioactive Waste Management and Transportation of Radioactive Materials | 03/15/94(94-006) | |
| 8700 | Materials Safety Inspection | ||
| 87101 | Performance Evaluation Factors | 02/11/97(97-002) | |
| 87102 | Maintaining Effluents From Materials Facilities As Low As Is Reasonably Achievable (ALRA) | 04/04/00(00-005) | |
| 87103 | Inspection of Materials Licensees Involved in an Incident or Bankruptcy Filing | 11/03/00 (00/023) | |
| 87104 | Decommissioning Inspection Procedure for Materials Licensees | 06/04/97(97-007) | |
| 87110 | Industrial/Academic/Research Programs | 04/05/99 (99-005) | |
| 87110 Appendix A | Industrial Academic/Research Inspection Record | 06/18/99 (99-009) | |
| 87110 Appendix B | Industrial/Academic/Research Inspection References | 04/05/99 (99-005) | |
| 87111 | Materials Processor/Manufacturer Programs | 06/11/98(98-008) | |
| 87111 Appendix A | Materials Processor/Manufacture Inspection Record | 06/18/99 (99-009) | |
| 87112 | Irradiator Programs | 06/11/98(98-008) | |
| 87112 Appendix A | Irradiator Inspection Record | 06/18/99 (99-009) | |
| 87113 | Well Logging Programs | 06/11/98(98-008) | |
| 87113 Appendix A | Well Logging Inspection Record | 06/18/99 (99-009) | |
| 87114 | Fixed and Portable Gauge Programs | 06/11/98(98-008) | |
| 87114 Appendix A | Fixed and Portable Gauge Inspection Record | 06/18/99 (99-009) | |
| 87115 | Nuclear Medicine Programs | 08/28/00 (00-013) | |
| 87116 | Medical Teletherapy Programs | 08/28/00 (00-013) | |
| 87117 | Radiopharmacy Programs | 05/07/98(98-007) | |
| 87117 Appendix A | Radiopharmacy Inspection Record | 06/18/99 (99-009) | |
| 87118 | Brachytherapy Programs | 08/28/00 (00-013) | |
| 87119 | Medical Broad-Scope Programs | 08/28/00 (00-013) | |
| 87120 | Industrial Radiography Programs | 05/03/99 (99-008) | |
| 87120, App A | Industrial Radiography Inspection Record | 06/18/99 (99-009) | |
| 87120, App B | Industrial Radiography Inspection References | 05/03/99 (99-008) | |
| 87250 | Locating Missing Materials Licensees | 01/11/97(97-002) | |
| 87654 | Uranium Mill Site Decommissioning Inspection | 09/02/97(97-013) | |
| 8800 | Fuel Facility Inspection | ||
| 88001 | On-Site Construction | 04/15/94(94-011) | |
| 88002 | Operational Event Review and Feedback Programs at Fuel Cycle Facilities | 12/20/96(96-025) | |
| 88003 | Reactive Inspection For Events At Fuel Cycle Facilities | 08/10/98(98-012) | |
| 88005 | Management Organization and Controls | 05/23/84(84-17) | |
| 88010 | Operator Training/Retraining | 05/23/84(84-17) | |
| 88015 | Headquarters Nuclear Criticality Safety Program | 12/20/96(96-025) | |
| 88020 | Regional Criticality Safety Inspection Program | 12/20/96(96-025) | |
| 88025 | Maintenance and Surveillance Testing | 05/23/84(84-17) | |
| 88035 | Radioactive Waste Management | 05/23/84(84-17) | |
| 88045 | Environmental Protection | 05/23/84(84-17) | |
| 88050 | Emergency Preparedness | 04/08/96(96-007) | |
| 88055 | Fire Protection | 01/14/91(91-001) | |
| 88056 | Process Safety Information | 01/16/96(96-001) | |
| 88057 | Hazard Identification Information | 01/16/96(96-001) | |
| 88058 | Standard Operating Procedures | 01/16/96(96-001) | |
| 88059 | Site-Wide Safety Procedures | 01/16/96(96-001) | |
| 88060 | Detection and Monitoring | 01/16/96(96-001) | |
| 88061 | Chemical Safety Training | 01/16/96(96-001) | |
| 88062 | Maintenance and Inspection | 01/16/96(96-001) | |
| 88063 | Management of Change | 01/16/96(96-001) | |
| 88064 | Emergency Response Procedures | 01/16/96(96-001) | |
| 88065 | Incident Investigation | 01/16/96(96-001) | |
| 88066 | Audits and Inspection | 01/16/96(96-001) | |
| 88100 | Plant Operations | 12/30/96(96-026) | |
| 88101 | Configuration Control | 12/30/96(96-026) | |
| 88102 | Surveillance Observations | 12/30/96(96-026) | |
| 88103 | Maintenance Observations | 12/30/96(96-026) | |
| 88104 | Decommissioning Inspection Procedure For Fuel Cycle Facilities | 06/04/97(97-007) | |
| 88105 | Management Organization and Controls | 12/30/96(96-026) | |
| 8900 | Fuel Facility and Materials Special Program | ||
| 89001 | In-Situ Leach (ISL) Facilities | 09/02/97(97-013) | |
| 9000 | Reportable Matters and Report Reviews | ||
| 90501B | Reportable Matters - Startup Test Program | 04/30/75(75-16) | |
| 90712 | Inoffice Review of Written Reports of Nonroutine Events at Power Reactor Facilities | 12/31/98 (98-020) | |
| 90713 | In Office Review of Periodic and Special Reports | 09/17/01 (01-017) | |
| 90714 | Nonroutine Reporting Program | 09/17/01 (01-017) | |
| 9100 | Title 10 Requirements | ||
| 9200 | Planned Non-Routine Activities | ||
| 92050 | Review of Quality Assurance For Extended Construction Delay | 04/04/00 (00-005) | |
| 92700 | Onsite Followup of Written Reports of Nonroutine Events at Power Reactor Facilities | 12/31/98 (98-020) | |
| 92701 | Followup | 03/14/94(94-005) | |
| 92702 | Followup on Corrective Actions for Violations and Deviations | 03/14/94 (94-005) | |
| 92703 | Followup of Confirmatory Action Letters | 09/17/01 (01-017) | |
| 92709 | Licensee Plans for Coping With Strikes | 08/21/92(92-010) | |
| 92711 | Continued Implementation of Strike Plans During an Extended Strike | 08/21/92(92-010) | |
| 92712 | Resumption of Normal Operations After a Strike | 08/21/92(92-010) | |
| 92901 | Followup - Plant Operations | 09/17/01 (01-017) | |
| 92902 | Followup - Maintenance | 09/17/01 (01-017) | |
| 92903 | Followup - Engineering | 09/17/01 (01-017) | |
| 92904 | Followup - Plant Support | 09/17/01 (01-017) | |
| 9300 | Non-Routine Activities | ||
| 93001 | OHSA Interface Activities | 05/22/89(89-009) | |
| 93702 | Prompt Onsite Response To Events At Operating Power Reactors | 09/17/01 (01-017) | |
| 93800 | Augmented Inspection Team | 04/03/00 (00-003) | |
| 93801 | Safety System Functional Inspection (SSFI) | 07/25/96(96-016) | |
| 93802 | Operational Safety Team Inspection (OSTI) | 11/27/89(89-015) | |
| 93803 | Safety Systems Outage Modifications Inspection | 04/27/89(89-008) | |
| 93804 | Risk-Based Operational Safety and Performance Inspection | 01/15/92(92-001) | |
| 93805 | Maintenance Program | 08/06/93(93-070) | |
| 93806 | Operational Readiness Assessment Team Inspections | 09/29/98(98-015) | |
| 93807 | Systems Based Instrumentation and Control Inspection | 01/29/93(93-001) | |
| 93809 | Safety System Engineering Inspection (SSEI) | 06/23/97(97-009) | |
| 93810 | Service Water System Operational Performance Inspection (SWSOPI) | 09/14/98 (98-013) | |
| 93811 | Electrical Distribution System Functional Inspection (EDSFI) | 02/03/99 (99-002) | |
| 93812 | Special Inspection | 03/06/01 (01-006) | |
| 9400 | Technical Activities of an Administrative Nature | ||
| 9500 | Strategic Determination Actions | ||
| 95001 | Inspection For One or Two White Inputs in a Strategic Performance Area | 03/06/01 (01-006) | |
| 95002 | Inspection For One Degraded Cornerstone or any Three White Inputs in a Strategic Performance Area | 03/06/01 (01-006) | |
| 95003 | Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input | 04/03/00 (00-003) | |
| 9600 | Reserved | ||
| 9700 | Reserved | ||
| 9800 | Reserved | ||
| 9900 | Technical Guidance(2) | ||
| 99000 | Technical Guidance | 05/12/86(86-26) | |
| 99100 | Health Physics Positions | 10/30/92(92-011) | |
| Reg. Guide 1.16, Para. C.2.a(2) and C.2.b(2) | Reporting Requirements - Degraded Mode | 04/01/79 (79-05) | ||
| Reg. Guide 1.16, Para. C.2.a(3) | Reporting Requirements - Abnormal Degradation | 04/01/78 (78-11) | ||
| Reg. Guide 1.16, Para. C.2.a(4) | Reporting Requirements - Reactivity Anomalies | 07/01/78 (78-24) | ||
| Reg. Guide 1.33 | "Procedure Implementation" as used in Section 6.8.1 of Standard Technical Specifications | 04/01/77 (77-05) | ||
| Reg. Guide 1.58 | Qualifications of Nuclear Power Plant Inspection, Examination and Testing Personnel | 04/01/77 (77-05) | ||
| ASME Secton III | American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code, Section III | 06/16/89 (89-011) | ||
| ASME Section III | American Society of Mechanical Engineers ASME Boiler and & XI Pressure Vessel Code, Section III & XI | 11/12/96 (96-022) | ||
| ASME Section IX | American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code, Section IX | 05/12/86 (86-26) | ||
| ASME Section XI | American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code, Section XI | 12/08/86 (86-54) | ||
| ASME Section XI | American Society of Mechanical Engineers ASME, Section XI | 05/12/86 (86-26) | ||
| IEEE | Institute of Electrical and Electronic Engineers IEEE Standard 450-1975 | 05/12/86 (86-26) | ||
| ANSI | American National Standards Institute ANSI N18.7-1972 Section 5.1.5 | 05/12/86 (86-26) | ||
| ANSI | ANSI N18.7, Section 5.2.7 - Design and Construction Type Activities Conducted During the Operations Phase (Maintenance and Modifications) | 04/01/77 (77-05) | ||
| ANSI | ANSI N45.2.9, Section 5.5 - Records Storage Facility | 1/01/82 (81-28) | ||
| ANSI | ANSI N45.2.9, Section 5.6 - NRC Criteria for Records Storage Facilities | 07/01/80 (80-17) | ||
| ANSI | ANSI/ASME NQA-1-1989, Supplement 17S-1, Section 5 | 09/17/90 (CN-010) (90-010) | ||
| STS Sec 1.0 | Operability | 05/12/86 (86-26) | ||
| STS Sec 1.0 | Definitions | 12/08/86 (86-54) | ||
| STS Sec 1.0 | Operable/Operability | 10/31/91 (91-015) | ||
| STS Sec 3.0 | Acceptable Measurement Tolerances for Technical Specification Limits | 10/01/78 (78-35) | ||
| STS Sec 3.0 | Operability and Action Statement Requirements | 07/01/80 (80-17) | ||
| STS Sec 3.0 | Voluntary Entry Into Action Statement | 01/01/82 (81-28) | ||
| STS Sec 3.0 | Resolution of Degraded and Noncomforming Conditions 1 | 0/23/97 (97-018) [STS30DEG.TG] | ||
| STS Sec 3.0.3 | Limiting Conditions for Operations | 08/31/87 (87-30) | ||
| STS Sec 3.0 | Limiting Conditions for Operation and and 4.0 Surveillance Requirements | 07/22/87 (87-26) | ||
| STS Sec 3/4.6.4 | Containment and Drywell Isolation Valves | 06/09/88 (88-06) | ||
| STS Sec 3.7.5 | Ultimate Heat Sink | 11/25/88 (88-17) | ||
| STS Sec 3/4.8.1 | TDI Diesel Generator Air Roll Tests | 06/09/88 (88-06) | ||
| STS Sec 4.2.8.X.X | Surveillance Requirements - 125-Volt Battery Bank | 10/01/79 (79-22) | ||
| STS Sec 4.5.1 | Standard Technical Specifications (BWR) | 05/12/86 (86-26) | ||
| STS Sec 4.7.9 | Surveillance of Snubber Piston Settings | 04/01/81 (81-08) | ||
| STS Sec 4.7.9.1.a | Establishment of Visual Inspection Intervals for Snubbers | 10/01/78 (78-35) | ||
| STS Sec 4.7.9.1(a) | Hydraulic Snubber Inspection Schedule | 01/01/79 (78-48) | ||
| STS Sec 4.7.9.6 | Operability of Hydraulic Snubbers With Empty Reservoirs | 10/01/80 (80-24) | ||
| STS Sec 4.8.1.1.2 | - | 05/12/86 (86-26) | ||
| STS Sec 6.5.1 | Onsite Committee Review of Unit Operations to Detect Potential Nuclear Safety Hazards | 10/01/80 (80-24) | ||
| STS Sec 6.5.1.1 | Licensee Review Responsibility for Matters Related to Nuclear Safety | 01/01/82 (81-28) | ||
| STS Sec 6.5.1.6c | Licensee Review Responsibility and 6.5.2.7d for Proposed Changes to Facility Technical Specifications | 01/01/82 (8 1-28) | ||
| STS Sec 6.5.2.8 | Requirements for Off-Site Committee Audit Functions | 10/01/78 (78-35) | ||
| STS Sec 6.9.1.7 | Reporting Requirements - Reportable Occurrences | 04/01/78 (78-11) | ||
| STS | Surveillance Sections - Locked or Otherwise Secured Components | 10/01/77 (77-25) | ||
| STS | Interp Licensee Technical Specification Interpretations | 02/03/97 (97-001) | ||
| Maintenance | ||||
| Voluntary Entry Into Limiting Conditions For Operation Action Statements To Perform Preventive Maintenance | 04/20/99 (99-023) | |||
| Assessing On-Line Leak Sealing of ASME Code Class 1 & 2 | 07/15/97 (97-011) | |||
| Filled Organic Coatings Used in Maintenance of Safety Related Equipment | 10/11/94 (94-018) | |||
| Preconditioning of Structures, Systems, and Components (SSCs) Before Determining Operability) | 09/28/98 (98-014) | |||
| Mechanical | ||||
| Freeze Plugs | 06/14/93 (93-005) | |||
| Steam Generator Plugs and Sleeving Repairs | 08/01/94 (94-014) | |||
| Steam Generator Tube Primary-to-Secondary Leakage | 10/11/01 (01-021) | |||
| Operations | ||||
| Procedural Adherence | 01/14/91 (91-001) | |||
| Notice of Enforcement Discretion | 12/12/00 (00-027) | |||
| Notice of Enforcement Discretion For Gaseous Diffusion Plants | 05/03/99 (99-008) [NOEDGAS.TG] | |||
| Safety and Compliance | 09/09/97 (97-015) [SAFETY.TG] | |||
| Guidance on 10 CFR | ||||
| CFR Discussions Containment Integrated Leak Rate Testing | 12/08/86 (86-54) | |||
| Title 10 of the Code of Federal Regulations | 12/08/86 (86-54) | |||
| 10 CFR 30 | License Condition, "Used by or under the supervision of...." | 10/01/79 (79-23) | ||
| 50 | Byproduct Material Produced in Non-Power Reactors | 09/30/88 (88-14) | ||
| 50.34(a) & (b) | Status of PSAR After FSAR is Submitted | 12/30/87 (87-39) | ||
| 50.36 | Changes to Facility Technical Specifications | 01/01/77 (76-39) | ||
| 50.54(o) | Guidance Relating to the Application of Appendix J - Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors | 04/01/78 (78-11) | ||
| 50.55(e) | Construction Deficiency Reporting | 01/31/89 (89-002) | ||
| 50.55a | Codes and Standards | 02/22/73 (73-9) | ||
| 50.55a(g) | Pump Operability Requirements | 07/01/80 (80-17) | ||
| 50.59 | Interim Guidance on the Requirements Related to Changes to Facilities, Procedures and Tests (or Experiment) | 03/13/01 (01-008) [50_59.CFR] | ||
| 50.109 | Backfitting | 01/01/82 (81-28) | ||
| Part 50, App A | Definition of Leak-Before-Break Analysis | 09/26/96 (96-020) | ||
| Part 50, App B | Responsibility - Review and Approval of Licensee QA Plans for Operation | 10/01/80 (80-24) | ||
| Part 50, App B | Applicability of Appendix B to Chemicals and Reagents, | 04/01/77 (77-05) | ||
| Part 50, App B | Criterion II - Maintenance of Proficiency for Personnel Performing Activities Affecting Quality | 07/01/81 (81-19) | ||
| Part 50, App B | Criterion VII - Guidance - Use of Certificate of Conformance | 04/01/80 (80-08) | ||
| Part 50, App B | Criterion VII - Guidance - Procurement of Spare and Replacement Parts, | 01/01/82 (81-28) | ||
| Part 50, App B | Criterion VII - Control of Purchased Materials, Equipment and Services | 06/02/71 (71-16) | ||
| Part 50, App B | Criterion X & XVII - Inspection Documentation Guidance | 01/14/88 (88-01) | ||
| Part 50 | Appendix J, Containment Integrated Leak Rate Testing | 12/08/86 (86-54) | ||
| 70.51 | Material Balance, Inventory, and Records Requirements | 12/19/74 (74-11) | ||
| 70.52 | Report of Accidental Criticality or Loss of Special Nuclear Material | 11/15/74 (74-010) | ||
1. The date and numbers in parentheses to the right of the chapter/inspection procedure title are the issue date and the change notice number under which the title was issued. [XXXX.XX] attached to each document in Part 9900, is the file name for that document.