Change Notice 97-018

IM001

NRC INSPECTION MANUAL PIPB

 

  DELETED:   TRANSMITTED:  
  Number Date Number Date
1. ---- ---- 2600/003 10/23/97
2. 9900 10 CFR Guidance 50.59 04/09/96 9900 10 CFR Guidance 50.59 10/08/97
3. 9900 STS Section 3 10/31/91 9900 STS Section 3 10/08/97

TRAINING: No special training requirements have been identified for any documents issued with this change notice.

REMARKS:

TI 2600/003 (Operational Safety Review) is issued to supplement the scope of Inspection Procedure (IP) 88020, "Regional Nuclear Criticality "Safety Inspection Program," for an interim period of one year. The TI is necessary because of inadvertent omissions of certain safety aspects from IP 88020, during its last revision. The current IP 88020 just addresses nuclear criticality safety at fuel cycle facilities, whereas the previous version also addressed radiological, industrial, chemical, and fire safety.

10 CFR Guidance - 50.59 (Interim Guidance on the Requirements Related to Changes to Facilities, Procedures and Tests (or Experiment)

9900 STS Section 3 (Resolution of Degraded and Nonconforming Conditions)

These two 9900 guidance documents have been revised to reflect changes to staff practice regarding the relationship of 10 CFR 50.59 to the resolution of degraded and nonconforming conditions as discussed in SECY-97-205, approved by the Commission SRM dated October 2, 1997.

DISTRIBUTION: Standard