Power Reactor Status Report for March 30, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 84 Coastdown To Refueling Outage
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 60 Reduced Power For Maintenance *
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 *
Susquehanna 1 0 2022-03-28 Refueling Outage *
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2022-02-26 Refueling Outage;
Brunswick 1 0 2022-03-05 Refueling Outage
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 98 Coastdown To Refueling Outage *
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 93 Coastdown To Refueling Outage
McGuire 2 100
North Anna 1 100
North Anna 2 0 2022-03-06 Refueling Outage
Oconee 1 100
Oconee 2 100
Oconee 3 99 Coastdown To Refueling Outage *
Robinson 2 100
Saint Lucie 1 99 Holding power due to condensate pump design margin issue.
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 0 2022-03-12 Refueling Outage
Vogtle 1 100
Vogtle 2 0 2022-03-06 Refueling Outage
Watts Bar 1 100
Watts Bar 2 0 2022-03-02 Refueling Outage;

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 89 Coastdown To Refueling Outage *
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 0 2022-03-05 Refueling Outage *
Dresden 2 100 *
Dresden 3 100
Fermi 2 0 2022-02-05 Refueling Outage
LaSalle 1 100 *
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 97 Reduced Power For Maintenance *
Point Beach 1 0 2022-03-26 Refueling Outage *
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 0 2022-03-21 Refueling Outage

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100 *
Cooper 100
Diablo Canyon 1 0 2022-03-27 Refueling Outage
Diablo Canyon 2 100
Grand Gulf 1 0 2022-02-27 Refueling Outage
Palo Verde 1 96 Coastdown To Refueling Outage *
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 97 Coastdown To Refueling Outage *
Wolf Creek 1 100 *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.