Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Power Reactor Status Report for October 25, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 High System Voltage Action
Beaver Valley 2 0 2021-10-10 Refueling Outage High System Voltage Action
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 48 Holding power for equipment repair. *
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2021-10-08 Refueling Outage *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 0 2021-10-25 *
Salem 1 100
Salem 2 0 2021-10-02 Refueling Outage
Seabrook 1 0 2021-10-02 Refueling Outage
Susquehanna 1 100 *
Susquehanna 2 100 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 2021-10-17 Refueling Outage *
Catawba 2 100
Farley 1 100
Farley 2 98 Reduced Power due to potential inaccuracies in flow measurement systems
Harris 1 100
Hatch 1 99 Reduced power while conducting surveillance. *
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 97 Plant Computer Maintenance
Oconee 1 100
Oconee 2 99 Coastdown To Refueling Outage
Oconee 3 100
Robinson 2 0 2021-10-19 Outage to replace RCP Seal
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2021-10-02 Refueling Outage *
Summer 0 2021-10-09 Refueling Outage
Surry 1 100
Surry 2 0 2021-10-24 Refueling Outage *
Turkey Point 3 0 2021-10-09 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 95 Coastdown To Refueling Outage
Watts Bar 2 95 Holding power due to S/G conditions

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 0 2021-10-18 Refueling Outage
Byron 1 100
Byron 2 100
Clinton 0 2021-09-27 Refueling Outage
D.C. Cook 1 100 High System Voltage Action
D.C. Cook 2 100 High System Voltage Action
Davis-Besse 100 High System Voltage Action
Dresden 2 84 Coastdown to Refueling Outage *
Dresden 3 0 2021-10-17 Forced Outage *
Fermi 2 100
LaSalle 1 100 High System Voltage Action
LaSalle 2 100 High System Voltage Action
Monticello 100
Palisades 100
Perry 1 100 High System Voltage Action *
Point Beach 1 100
Point Beach 2 0 2021-10-09 Refueling Outage
Prairie Island 1 100
Prairie Island 2 0 2021-10-02 Refueling Outage
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2021-09-25 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 2021-10-03 Refueling Outage
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 15 Increasing Power *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2021-10-09 Refueling Outage
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 0 2021-10-09 Refueling Outage
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.