Power Reactor Status Report for April 11, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 0 2021-04-11 High System Voltage Action, Refueling Outage *
Beaver Valley 2 100 High System Voltage Action
Calvert Cliffs 1 97 Grid dispatcher request High System Voltage Action
Calvert Cliffs 2 100 High System Voltage Action
FitzPatrick 100
Ginna 100
Hope Creek 1 77 Coastdown To Refueling Outage
Indian Point 2 0 2020-04-30 Reactor defueled for permanent shutdown
Indian Point 3 85 Coastdown To Refueling Outage
Limerick 1 96 Increasing Power *
Limerick 2 80 Coastdown To Refueling Outage *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 27 Startup in Progress *
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100 High System Voltage Action *
Salem 2 100 High System Voltage Action *
Seabrook 1 100
Susquehanna 1 100 High System Voltage Action
Susquehanna 2 0 2021-03-22 Refueling Outage High System Voltage Action

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 0 2021-02-26 Refueling Outage
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 98 Increasing Power *
Catawba 1 100
Catawba 2 0 2021-03-28 Refueling Outage
Farley 1 0 2021-03-22 Refueling Outage *
Farley 2 100
Harris 1 98 Coastdown To Refueling Outage *
Hatch 1 100
Hatch 2 54 Increasing Power *
McGuire 1 100
McGuire 2 100
North Anna 1 0 2021-03-14 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 2021-04-10 Planned Maintenance Outage *
Saint Lucie 2 100
Sequoyah 1 0 2021-04-10 Refueling Outage *
Sequoyah 2 100
Summer 100
Surry 1 97 Reduced Power For Unplanned Maintenance Until Outage
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 90 Max Power until Steam Generator Replacement.

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 0 2021-04-05 Refueling Outage
Braidwood 2 100
Byron 1 100 *
Byron 2 100 *
Clinton 98 Full Electrical Output
D.C. Cook 1 100 High System Voltage Action
D.C. Cook 2 100 High System Voltage Action
Davis-Besse 100 High System Voltage Action
Dresden 2 100 High System Voltage Action
Dresden 3 100 High System Voltage Action
Fermi 2 100
LaSalle 1 100 High System Voltage Action
LaSalle 2 0 2021-02-22 Refueling Outage, High System Voltage Action
Monticello 82 Coastdown To Refueling Outage
Palisades 100
Perry 1 93 Increasing Power - Limited Due to Ambient Conditions *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2021-04-10 Refueling Outage *
Arkansas Nuclear 2 100
Callaway 0 2020-12-25 See EN# 55049
Columbia Generating Station 93 Coastdown To Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 2021-02-04 Forced Outage and Refueling Outage *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 2021-04-10 Refueling Outage *
River Bend Station 1 79 Increasing Power *
South Texas 1 100
South Texas 2 0 2021-03-20 Refueling Outage *
Waterford 3 99 Holding Power
Wolf Creek 1 0 2021-03-25 Refueling Outage

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.