Power Reactor Status Report for July 16, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 92 | REDUCED POWER DUE TO SEPARATOR DRAIN RECEIVER PUMP MOTOR FAILURE | * | ||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | SOLAR ACTIVITY WARNING | |||
Ginna | 100 | ||||
Hope Creek 1 | 100 | MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL | |||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | * | |||
Limerick 1 | 100 | * | |||
Limerick 2 | 100 | ||||
Millstone 2 | 85 | "B" CIRC WATER PUMP OOS - DAMAGED | |||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | * | |||
Nine Mile Point 2 | 28 | INCREASING POWER TO 100% | * | ||
Oyster Creek | 100 | HOT WEATHER ALERT IN EFFECT | * | ||
Peach Bottom 2 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 68 | REDUCED POWER DUE TO SOLAR MAGNETIC ACTIVITY CAUSING HIGH CIRCULATING CURRENT IN UNIT 1 TRANSFORMER - POWER LIMITED TO 85% BASED ON GENERATOR STATOR COOLING DELTA T LIMIT - SWITCHYARD MAINTENANCE ON-GOING UNTIL APPROX. 7/17/12 | * | ||
Susquehanna 1 | 100 | HOT WEATHER ALERT IN EFFECT | * | ||
Susquehanna 2 | 100 | HOT WEATHER ALERT IN EFFECT | * | ||
Three Mile Island 1 | 100 | HOT WEATHER ALERT IN EFFECT | * | ||
Vermont Yankee | 100 | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONTAINMENT TENSIONING ON HOLD | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | HOT WEATHER ALERT | |||
North Anna 2 | 100 | HOT WEATHER ALERT | |||
Oconee 1 | 48 | REDUCED POWER TO INVESTIGATE RCS LEAKAGE INSIDE THE RCB | * | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 99 | ||||
Saint Lucie 2 | 82 | COASTDOWN TO REFUELING OUTAGE | * | ||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | HOT WEATHER ALERT | |||
Surry 2 | 100 | HOT WEATHER ALERT | |||
Turkey Point 3 | 0 | 02/26/2012 | REFUELING OUTAGE | ||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | HOT WEATHER ALERT IN EFFECT | * | ||
Braidwood 2 | 100 | HOT WEATHER ALERT IN EFFECT | * | ||
Byron 1 | 88 | DEGRADED NATURAL DRAFT TOWER PERFORMANCE | |||
Byron 2 | 85 | DEGRADED NATURAL DRAFT TOWER PERFORMANCE | * | ||
Clinton | 97 | 100% ELECTRICAL CAPABILITY. HOT WEATHER ALERT; CONSERVATIVE OPS. | * | ||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 99 | FUEL CONDITIONING HOLD - SOLAR ALERT IN EFFECT UNTIL 1600 CDT | * | ||
Fermi 2 | 0 | 06/25/2012 | FORCED OUTAGE - SEE EN #48047 | ||
Kewaunee | 100 | HOT WEATHER ALERT; CONSERVATIVE OPS. | * | ||
La Salle 1 | 100 | HOT WEATHER ALERT IN EFFECT | * | ||
La Salle 2 | 100 | HOT WEATHER ALERT IN EFFECT | * | ||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | SOLAR ALERT UNTIL 0400 EDT 7/17 | * | ||
Point Beach 2 | 100 | SOLAR ALERT UNTIL 0400 EDT 7/17 | * | ||
Prairie Island 1 | 100 | GRID CONDITION YELLOW - CONSERVATIVE OPS | * | ||
Prairie Island 2 | 100 | GRID CONDITION YELLOW - CONSERVATIVE OPS | * | ||
Quad Cities 1 | 100 | HOT WEATHER ALERT ON 7/17 - 7/18 | * | ||
Quad Cities 2 | 100 | HOT WEATHER ALERT ON 7/17 - 7/18 | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 85 | ECONOMIC DISPATCH | |||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | 10% DOWNPOWER FOR PLANNED MAINTENANCE THIS MORNING | * | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021