Power Reactor Status Report for December 9, 2006
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | * | |||
| Indian Point 3 | 100 | * | |||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 93 | FLUX SHAPING AND CONDENSER BAY MAINTENANCE | * | ||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | GENERATOR VOLTAGE REGULATOR IN MANUAL | |||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | * | |||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
| Browns Ferry 2 | 100 | 1 OF 2 161 KV LINES OOS AND 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE | |||
| Browns Ferry 3 | 15 | 1 OF 2 161 KV LINES OOS AND 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE. DRYWELL LEAK INSPECTION AND 3 "B" RECIRC RBCC MAINTENANCE | * | ||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 0 | 11/10/2006 | DEFUELED | ||
| Catawba 2 | 64 | MAIN FEED PUMP REPAIR | * | ||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 0 | 10/06/2006 | COMING OUT OF REFUELING OUTAGE - HEATUP IN PROGRESS | * | |
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 0 | 11/26/2006 | LOADING FUEL | * | |
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 0 | 10/30/2006 | REACTOR CRITICAL AT 0425 12/9/06 | * | |
| Vogtle 1 | 100 | 100% ELECTRICAL CAPABILITY | * | ||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 85 | HOLDING FOR FUEL PRECONDITIONING | * |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | MAINTENANCE ON 69 KV OFFSITE SUPPLY LINE | * | ||
| D.C. Cook 2 | 100 | MAINTENANCE ON 69 KV OFFSITE SUPPLY LINE | * | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 67 | ROD PATTERN ADJUSTMENT | * | ||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 100 | ||||
| Kewaunee | 99 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 0 | 11/14/2006 | REFUELING OUTAGE | ||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 95 | 100% ELECTRICAL CAPABILITY | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | SWITCHYARD MAINTENANCE UNTIL 12/9 | |||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | * | |||
| Comanche Peak 2 | 100 | * | |||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | MAINTENANCE ON 500 KV OUTPUT BREAKER | * | ||
| Diablo Canyon 2 | 100 | MAINTENANCE ON 500 KV OUTPUT BREAKER | * | ||
| Fort Calhoun | 70 | HOLDING POWER WHILE TROUBLESHOOTING RPS TRIP UNIT | |||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 99 | REDUCED FOR S/G BLOWDOWNS | * | ||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | STEAM GENERATOR TUBE PLUGGING LIMITATION | |||
| San Onofre 3 | 0 | 10/16/2006 | PREPARING FOR STARTUP | * | |
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 11/25/2006 | REFUELING OUTAGE | ||
| Wolf Creek 1 | 100 |