Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 0 02/14/1999 EXITING MAINTENANCE OUTAGE - STARTUP IN PROGRESS *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 73   COASTDOWN TO REFUELING OUTAGE *  
HOPE CREEK 1 0 02/12/1999 REFUELING OUTAGE- CORE OFFLOAD IN PROGRESS    
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 98   COASTDOWN TO REFUELING OUTAGE    
MILLSTONE 2 0 02/20/1996 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100     *  
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 60   DECREASING TO 30% POWER TO PERFORM PLANNED MAINTENANCE ON MAIN TURBINE GOVER *  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100        
MCGUIRE 2 90   COASTDOWN TO REFUELING OUTAGE *  
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 0 02/23/1999 ENTERING PLANNED MAINTENANCE OUTAGE FOR STEAM GENERATOR RISER LEAK REPAIR *  
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 98   HOLDING POWER AT THIS LEVEL TO INVESTIGATE FEEDWATER PROBLEMS *  
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 96   COASTDOWN TO REFUELING OUTAGE *  
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 90   COASTDOWN TO REFUELING OUTAGE *  
VOGTLE 2 100        
WATTS BAR 1 65   COASTDOWN TO REFUELING OUTAGE *  

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 0 09/06/1996 REFUELING OUTAGE    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 99        
DRESDEN 3 0 01/29/1999 REFUELING OUTAGE    
DUANE ARNOLD 1 100        
FERMI 2 97        
KEWAUNEE 1 97   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING    
LASALLE 1 100        
LASALLE 2 0 09/20/1996 REFUELING OUTAGE - DEFUELED    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 98   COASTDOWN TO REFUELING OUTAGE    
POINT BEACH 1 100        
POINT BEACH 2 0 02/02/1999 EXITING REFUELING OUTAGE - PLANT HEATUP IN PROGRESS - RCS CURRENTLY AT 370�F *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 0 02/20/1999 OUTAGE TO PERFORM TECH SPEC SURVEILLANCE TESTING *  

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 01/09/1999 EXITING REFUELING OUTAGE - STARTUP IN PROGRESS *  
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 0 02/07/1999 REFUELING OUTAGE - DEFUELED    
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 0 02/21/1999 REPLACING CONDENSER EXPANSION JOINT (RUBBER BOOT) THAT GAVE WAY - PLAN TO IN *  
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 90   POWER SUPPRESSED DUE TO FUEL LEAKERS    
SAN ONOFRE 2 0 01/02/1999 EXITING REFUELING OUTAGE - LOW POWER PHYSICS TESTING IN PROGRESS *  
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 100        
WATERFORD 3 0 02/19/1999 REFUELING OUTAGE *  
WOLF CREEK 1 100        