Event Notification Report for June 22, 2024
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
06/21/2024 - 06/22/2024
EVENT NUMBERS
57187
57187
Power Reactor
Event Number: 57187
Facility: Vogtle 1/2
Region: 2 State: GA
Unit: [2] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Matthew Henson
HQ OPS Officer: Karen Cotton-Gross
Region: 2 State: GA
Unit: [2] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Matthew Henson
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 06/22/2024
Notification Time: 11:44 [ET]
Event Date: 06/22/2024
Event Time: 07:28 [EDT]
Last Update Date: 06/22/2024
Notification Time: 11:44 [ET]
Event Date: 06/22/2024
Event Time: 07:28 [EDT]
Last Update Date: 06/22/2024
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(iv)(A) - Valid Specif Sys Actuation
10 CFR Section:
50.72(b)(3)(iv)(A) - Valid Specif Sys Actuation
Person (Organization):
Suggs, LaDonna (R2DO)
Suggs, LaDonna (R2DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | M/R | N | 0 | Hot Standby | 0 | Hot Standby |
MANUAL ACTUATION OF REACTOR PROTECTION SYSTEM (RPS)
The following information was provided by the licensee via email:
"At 0728 EDT on 06/22/2024, with Unit 2 in Mode 3 at zero percent power and the reactor trip breakers closed, a manual actuation of the RPS was initiated during the withdrawal of the shutdown rods in preparation for Mode 2. This was procedurally directed due to a shutdown rod being misaligned from the other rods in the bank due to a malfunction.
"Units 1, 3 and 4 were not affected.
"Due to the manual actuation of the RPS, this event is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(iv)(A).
"There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified."
The following information was provided by the licensee via email:
"At 0728 EDT on 06/22/2024, with Unit 2 in Mode 3 at zero percent power and the reactor trip breakers closed, a manual actuation of the RPS was initiated during the withdrawal of the shutdown rods in preparation for Mode 2. This was procedurally directed due to a shutdown rod being misaligned from the other rods in the bank due to a malfunction.
"Units 1, 3 and 4 were not affected.
"Due to the manual actuation of the RPS, this event is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(iv)(A).
"There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified."