Event Number: 57132
Facility: Beaver Valley
Region: 1 State: PA
Unit: [1] [] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: Shawn Keener
HQ OPS Officer: Thomas Herrity
Region: 1 State: PA
Unit: [1] [] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: Shawn Keener
HQ OPS Officer: Thomas Herrity
Notification Date: 05/19/2024
Notification Time: 01:21 [ET]
Event Date: 05/19/2024
Event Time: 00:30 [EDT]
Last Update Date: 05/19/2024
Notification Time: 01:21 [ET]
Event Date: 05/19/2024
Event Time: 00:30 [EDT]
Last Update Date: 05/19/2024
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS Actuation - Critical 50.72(b)(3)(iv)(A) - Valid Specif Sys Actuation
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS Actuation - Critical 50.72(b)(3)(iv)(A) - Valid Specif Sys Actuation
Person (Organization):
Carfang, Erin (R1DO)
Carfang, Erin (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | M/R | Y | 14 | Power Operation | 0 | Hot Standby |
MANUAL REACTOR TRIP
The following information was provided by the licensee via email:
"At 0030 [EDT] on 5/19/24, with Beaver Valley Unit 1 in mode 1 at 14 percent power, the reactor was manually tripped due to inability to control the 'A' steam generator water level. The trip was not complex, with all systems responding normally post-trip. The turbine driven auxiliary feedwater pump automatically started on a valid actuation signal. All control rods inserted into the core. Operations responded and stabilized the plant. Decay heat is being removed by the feedwater system and the main condenser. Beaver Valley Unit 2 is unaffected.
"Due to the reactor protection system system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B). Due to the emergency safety feature system actuation (automatic start of the turbine driven auxiliary feedwater pump) while critical, this event is being reported as an eight-hour, non-emergency notification per 10CFR 50.72(b)(3)(iv)(A).
"There was no impact on the health and safety of the public or plant personnel.
"The NRC Resident Inspector has been verbally notified."
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
Unit 1 is stable on off-site power, normal configuration. All emergency systems are available.
The following information was provided by the licensee via email:
"At 0030 [EDT] on 5/19/24, with Beaver Valley Unit 1 in mode 1 at 14 percent power, the reactor was manually tripped due to inability to control the 'A' steam generator water level. The trip was not complex, with all systems responding normally post-trip. The turbine driven auxiliary feedwater pump automatically started on a valid actuation signal. All control rods inserted into the core. Operations responded and stabilized the plant. Decay heat is being removed by the feedwater system and the main condenser. Beaver Valley Unit 2 is unaffected.
"Due to the reactor protection system system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B). Due to the emergency safety feature system actuation (automatic start of the turbine driven auxiliary feedwater pump) while critical, this event is being reported as an eight-hour, non-emergency notification per 10CFR 50.72(b)(3)(iv)(A).
"There was no impact on the health and safety of the public or plant personnel.
"The NRC Resident Inspector has been verbally notified."
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
Unit 1 is stable on off-site power, normal configuration. All emergency systems are available.