Event Notification Report for July 2, 2003
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 07/01/2003 - 07/02/2003 ** EVENT NUMBERS ** 39631 39970 39971 39972 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39631 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SAINT LUCIE REGION: 2 |NOTIFICATION DATE: 03/02/2003| | UNIT: [1] [2] [] STATE: FL |NOTIFICATION TIME: 16:00[EST]| | RXTYPE: [1] CE,[2] CE |EVENT DATE: 03/02/2003| +------------------------------------------------+EVENT TIME: 14:30[EST]| | NRC NOTIFIED BY: CHARLES PIKE |LAST UPDATE DATE: 07/01/2003| | HQ OPS OFFICER: GERRY WAIG +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |WALTER RODGERS R2 | |10 CFR SECTION: |DAVID AYRES R2 | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION TO STATE AGENCY OF EXPIRED GREEN SEA TURTLE FOUND AT | | BARRIER NET | | | | "NRC notification [is] being made due to state notification to [the] Florida | | Wildlife Commission regarding a Green Sea Turtle found dead at barrier net | | pursuant to 10 CFR 50.72(b)(2)(xi)." | | | | The turtle was found on the surface at the barrier net with no injuries or | | abnormalities except for fresh cuts common for turtles coming through pipes. | | The cause of death is unknown at this time. A necropsy is planned. | | | | The NRC Resident Inspector will be notified by the licensee. | | | | * * * UPDATE ON 3/15/03 @ 1033 EST FROM TEREZAKIS TO CROUCH * * * | | | | "On 3-15-03, a green sea turtle was retrieved from the plant's intake canal. | | The turtle was determined to be in need of rehabilitation. The injuries to | | the turtle are not causal to plant operation. Per the plant's turtle permit, | | the Florida Fish and Wildlife Conservation Commission (FWCC) was notified at | | 0920 EST. This non-emergency notification is being made pursuant to 10 CFR | | 50.72(b)(2)(xi) due to the notification of FWCC." | | | | The NRC Resident Inspector will be notified by the licensee. | | | | * * * UPDATE ON 3/19/03 AT 1222 EST FROM E. SUMNER TO RIPLEY * * * | | | | "On 03/19/03 @ 1105 hrs., one loggerhead turtle was retrieved from the | | plant's intake canal. The turtle was determined to be in need of | | rehabilitation. The injury to the turtle is not causal to plant operation. | | Per the plant's turtle permit, the Florida Fish and Wildlife Conservation | | Commission (FWCC) was notified at 1115 EST." | | | | The NRC Resident Inspector was notified. | | | | * * * UPDATED ON 3/31/03 AT 1159 EST FROM W.L. PARK TO A. COSTA * * * | | | | "On 3-31-03 [1105 EST], a loggerhead sea turtle was retrieved from the | | plant's intake canal. The turtle was determined to be in need of | | rehabilitation. The injuries to the turtle are not causal to plant | | operation. Per the plant's turtle permit, the Florida Fish and Wildlife | | Conservation Commission (FWCC) was notified at 1105 EST. This non-emergency | | notification is being made pursuant to 10 CFR 50.72(b)(2)(xi) due to the | | notification of FWCC." | | | | The NRC Resident Inspector will be notified. | | | | * * * UPDATE 1235EST ON 4/9/03 FROM ANDY TEREZAKIS TO S.SANDIN * * * | | | | "On 4-9-03, a loggerhead sea turtle was retrieved from the plant's Intake | | canal. The turtle was determined to be in need of rehabilitation. The | | injuries to the turtle are not causal to plant operation. Per the plant's | | turtle permit, the Florida Fish and Wildlife Conservation Commission (FWCC) | | was notified at 1100 EST. This non-emergency notification is being made | | pursuant to 10CFR50.72(b)(2)(xi) due to the notification of FWCC." | | | | The licensee informed the NRC resident inspector. Notified R2DO(Landis). | | | | *** UPDATE ON 5/2/03 AT 1826 FROM S. OEHRLE TO A. COSTA *** | | | | "On 5/2/03, a green sea turtle was retrieved from the intake canal. The | | turtle required rehabilitation. The injuries were not causal to plant | | operation. Per the plant's turtle permit, the Florida Fish and Wildlife | | Conservation Commission was notified at 1445 EDT. This non-emergency | | notification is being made pursuant to 10 CFR 50.72 (b)(2)(xi) due to | | offsite notification." | | | | The Licensee will notify the NRC Resident Inspector. Notified R2DO | | (Munday). | | | | **** update on 05/24/03 at 1417 EDT FROM JOE HESSLING TO JOHN MACKINNON | | **** | | | | "On 5-24-03, a loggerhead sea turtle was retrieved from the plant's intake | | canal. The turtle was determined to be in need of rehabilitation. The | | turtle was very underweight and lethargic, no injuries or anomalies noted. | | Turtle's condition is not causal to plant operation. Per the plant's turtle | | permit the Florida Fish and Wildlife Conservation Commission (FWCC) was | | notified at 1345 EDT. This non-emergency notification is being made | | pursuant to 10 CFR 50.72(b)(2)(xi) due to the notification of FWCC. NRC R2DO | | (TOM DECKER) notified. | | | | The NRC Resident Inspector was by notified of this event by the licensee. | | | | ****UPDATE ON 5/27/03 AT 10:49 FROM HESSLING TO LAURA**** | | | | "On 5-27-03, a loggerhead sea turtle was retrieved from the plant's intake | | canal. The turtle was determined to be in need of rehabilitation. The turtle | | was underweight, and missing lower posterior marginals on left side. | | Turtle's injuries are not causal to plant operation. Per the plant's turtle | | permit, the Florida Fish and Wildlife Conservation Commission (FWCC) was | | notified at 0850 EDT. This non-emergency notification is being made pursuant | | to 10 CFR 50.72(b)(2)(xi) due to the notification of FWCC." | | | | Notified R2DO (T. Decker) | | | | * * * UPDATE ON 06/17/03 AT 12:45 EDT FROM CALVIN WARD TO ARLON COSTA * * * | | | | "At approximately 12:45 p.m. on 6/17/03 a loggerhead turtle was rescued from | | the St. Lucie Plant intake canal. The turtle was injured and will be | | transported to the State authorized sea turtle rehabilitation facility. The | | Florida Dept. of Environmental Protection (FDEP) was notified at 1:09 p.m. | | as required by the St. Lucie Plant Sea Turtle Permit - see the attached sea | | turtle stranding report (1 page). | | | | "Notification to the state government agency requires a four (4) Hr. | | Non-Emergency Notification to the NRC per 10 CFR 50.72(b)(2)(xi). There were | | no unusual plant evolutions in progress which may have contributed to this | | event." | | | | The licensee notified the NRC Resident Inspector. | | | | Notified R2DO (L. Wert). | | | | * * * UPDATE 0605 EDT ON 6/26/03 FROM STEVE MERRILL TO S. SANDIN * * * | | | | The licensee was informed by the FWCC that the green sea turtle requiring | | rehabilitation which was retrieved from the plant's intake canal on 3/15/03 | | had expired within 10 days of removal. Consequently, the licensee is | | updating their 3/15/03 report to include this additional information. The | | licensee will inform the NRC Resident Inspector. Notified R2DO(C. Ogle). | | | | * * * UPDATE 1506 EDT ON 07/01/03 FROM CALVIN WARD TO GOTT * * * | | | | On 04/02/03, a green sea turtle was retrieved from the intake canal. The | | turtle required rehabilitation. The injuries were not causal to plant | | operation. Per the plant's turtle permit, the Florida Fish and Wildlife | | Conservation Commission was notified. This non-emergency notification is | | being made pursuant to 10 CFR 50.72 (b)(2)(xi) due to offsite notification. | | On 07/01/03 licensee QA discovered that the injury had occurred and that the | | NRC had not been notified within the 4 hours. The failure to report the | | event within the regulatory time is being investigated and has been entered | | into the stations corrective action program. | | | | The licensee notified the NRC Resident Inspector. | | | | Notified R2DO (Munday) | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39970 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: MONTICELLO REGION: 3 |NOTIFICATION DATE: 07/01/2003| | UNIT: [1] [] [] STATE: MN |NOTIFICATION TIME: 00:04[EDT]| | RXTYPE: [1] GE-3 |EVENT DATE: 06/30/2003| +------------------------------------------------+EVENT TIME: 15:45[CDT]| | NRC NOTIFIED BY: DAVID BARNETT |LAST UPDATE DATE: 07/01/2003| | HQ OPS OFFICER: MIKE RIPLEY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |BRENT CLAYTON R3 | |10 CFR SECTION: | | |AINA 50.72(b)(3)(v)(A) POT UNABLE TO SAFE SD | | |AINB 50.72(b)(3)(v)(B) POT RHR INOP | | |AINC 50.72(b)(3)(v)(C) POT UNCNTRL RAD REL | | |AIND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | HIGH ENERGY LINE BREAK (HELB) DOOR NOT LATCHED | | | | "On June 30, 2003 at approximately 1545 [CDT] it was identified that a High | | Energy Line Break (HELB) door separating Divisional Motor Control Centers | | was not latched as required. It was determined that this condition existed | | for a maximum of 15 minutes. This condition is being reported as an event | | or condition that could have prevented the fulfillment of a safety function | | in accordance with 10 CFR 50.72(b)(3)(v)." | | | | The licensee notified the NRC Resident Inspector and the State Emergency | | Management Agency. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39971 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: LASALLE REGION: 3 |NOTIFICATION DATE: 07/01/2003| | UNIT: [1] [2] [] STATE: IL |NOTIFICATION TIME: 12:13[EDT]| | RXTYPE: [1] GE-5,[2] GE-5 |EVENT DATE: 07/01/2003| +------------------------------------------------+EVENT TIME: 08:00[CDT]| | NRC NOTIFIED BY: JOHN WASHKO |LAST UPDATE DATE: 07/01/2003| | HQ OPS OFFICER: BILL GOTT +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |BRENT CLAYTON R3 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | PRESS RELEASE DUE TO SIREN MALFUNCTION | | | | The licensee provided the following information via facsimile: | | | | "At approximately 0800 (CDT) on July 1, 2003, LaSalle County Station | | management decided to issue a press release related to a single | | malfunctioned warning siren. The warning siren had malfunctioned and | | erroneously operated for nearly 90 minutes early this morning. LaSalle | | County Generating Station will begin replacing the faulty warning siren's | | electronics today. The press release is tentatively expected to occur today | | at 1130 CDT. No other emergency notification systems or sirens | | malfunctioned. | | | | "The siren, located in LaSalle County on East 25th Road approximately | | one-half mile west of the station, is currently out of service. It is | | expected to return to service on Wednesday July 2." | | | | The licensee notified the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39972 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SEQUOYAH REGION: 2 |NOTIFICATION DATE: 07/02/2003| | UNIT: [1] [2] [] STATE: TN |NOTIFICATION TIME: 00:17[EDT]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 07/01/2003| +------------------------------------------------+EVENT TIME: 18:45[EDT]| | NRC NOTIFIED BY: KEN STEVENS |LAST UPDATE DATE: 07/02/2003| | HQ OPS OFFICER: STEVE SANDIN +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |JOEL MUNDAY R2 | |10 CFR SECTION: |HAROLD CHRISTENSEN R2 | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION |ROBERTA WARREN TAS | |NINF INFORMATION ONLY | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNACCOUNTED FOR SECURITY WEAPON | | | | Unaccounted for security weapon. Immediate compensatory measures taken upon | | discovery. TVA security and NRC Resident Inspector notified. Refer to HOO | | Log for additional details. | | | | * * * UPDATE ON 07/02/03 AT 0150 FROM HERBERT EAVES TO ARLON COSTA * * * | | | | TVA Police made offsite notification on 07/01/03 at 2300 EDT to the National | | Crime Information Center pertaining to the unaccounted for security weapon. | | The NRC Resident Inspector will be notified of this event update. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021