Event Notification Report for July 22, 1999
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 07/21/1999 - 07/22/1999 ** EVENT NUMBERS ** 35941 35942 35943 35944 +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 35941 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 07/21/1999| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 08:54[EDT]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 07/20/1999| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 14:30[CDT]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 07/21/1999| | CITY: PADUCAH REGION: 3 +-----------------------------+ | COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION | |LICENSE#: GDP-1 AGREEMENT: Y |PATRICK HILAND R3 | | DOCKET: 0707001 |DON COOL NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: KEVIN BEASLEY | | | HQ OPS OFFICER: DICK JOLLIFFE | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |NBNL RESPONSE-BULLETIN | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | NRC BULLETIN 91-01, 24 HOUR REPORT - | | | | At 1430 CDT on 07/20/99, the Plant Shift Superintendent was notified that | | during calibration of C-335 air plant moisture meter, air was added to C-335 | | Unit 3 Cell 7 without independently verifying that the enrichment was less | | than 1.0 weight percent U-235, in violation of NCSA GEN 10-01. Independent | | assay verification is required if the air moisture content exceeds 1300 ppm | | or if the moisture meter is inoperable. With the moisture meter out of | | service, dry air was added to C-335 Unit 3 Cell 7, which had an assay of | | 1.01 weight percent U-235. The cell was thought to be less than 1.0 weight | | percent U-235. However, a previously completed independent assay | | verification was not referenced. Moisture content was less than 1300 ppm | | prior to removing the meter from service. After placing the moisture meter | | back in service, it was determined that the dry air never exceeded 1300 ppm | | while the meter was out of service. During the period of time that the | | meter was out of service, the air equipment was operated in a steady state | | condition with no manipulations performed and no abnormal or unusual process | | conditions observed. | | | | SAFETY SIGNIFICANCE OF EVENT: | | Double contingency was not maintained since the independent verification of | | assay was not performed. Independent verification of assay is required to | | preclude exposure of an unsafe mass deposit with the enrichment greater than | | 1.0 weight percent U-235 to wet air. Removal of the moisture meter requires | | that the system not be pressured with air or independent verification of | | assay less than 1.0 weight percent U-235 prior to applying air. However, a | | criticality was not possible because the moisture content did not exceed | | 1300 ppm. | | | | POTENTIAL CRITICALITY PATHWAYS INVOLVED (BRIEF SCENARIO OF HOW CRITICALITY | | COULD OCCUR): | | In order for a criticality to be possible, a deposit of unsafe mass would | | have to be present. This deposit would then have to be exposed to | | sufficient air with a moisture content exceeding 1300 ppm to moderate the | | deposit. | | | | CONTROLLED PARAMETERS (MASS, MODERATION, GEOMETRY, CONCENTRATION, ETC.): | | Two controls on assay. | | | | ESTIMATED AMOUNT, ENRICHMENT, FORM OF LICENSED MATERIAL (INCLUDE PROCESS | | LIMIT AND % WORST CASE CRITICAL MASS): | | Enrichment of 1.01 weight percent U-235 as determined by Independent Assay | | Verification. | | | | NUCLEAR CRITICALITY SAFETY CONTROL(S) OR CONTROL SYSTEM(S) AND DESCRIPTION | | OF THE FAILURES OR DEFICIENCIES: | | Double contingency for this scenario is established by implementing two | | controls of assay. | | | | The first leg of the double contingency is based on verification that the | | assay of the equipment that the air is being applied to is less than 1.0 | | weight percent U-235. It was believed the cell assay was less than 1.0 | | weight percent U-235. However, verification of assay was not performed. It | | was later determined that the cell assay exceeded 1.0 weight percent U-235. | | Therefore, the control was violated. | | | | The second leg of double contingency is based on the independent | | verification that the assay of the equipment that the air is being applied | | to is less than 1.0 weight percent U-235. However, the Independent | | verification of assay was not performed. Therefore, this control was | | violated. | | | | Since double contingency was based on two controls on assay, a loss of one | | or both controls would result in a loss of double contingency. In this | | instance, both controls were violated and double contingency was not | | maintained. | | | | CORRECTIVE ACTIONS TO RESTORE SAFETY SYSTEMS AND WHEN EACH WAS IMPLEMENTED: | | The moisture meter was returned to service following calibration. | | | | This event is being categorized as a 24 hour event in accordance with Safely | | Analysis Report Table 6.9-1, Criteria A.4.a and NRC Bulletin 91-01, | | Supplement 1. | | | | The NRC Senior Resident Inspector has been notified of this event. | | | | PGDP Problem Report No. ATR-99-4250, PGDP Event Report No. PAD-1999-053. | | Responsible Division: Operations. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 35942 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: H. C. NUTTING COMPANY |NOTIFICATION DATE: 07/21/1999| |LICENSEE: H. C. NUTTING COMPANY |NOTIFICATION TIME: 13:44[EDT]| | CITY: HARRISON REGION: 3 |EVENT DATE: 07/21/1999| | COUNTY: STATE: OH |EVENT TIME: 08:00[EDT]| |LICENSE#: AGREEMENT: N |LAST UPDATE DATE: 07/21/1999| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |PATRICK HILAND R3 | | |JOHN HICKEY NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: HAROLD WIDENER | | | HQ OPS OFFICER: DOUG WEAVER | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAB1 20.2201(a)(1)(i) LOST/STOLEN LNM>1000X | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | STOLEN NUCLEAR MOISTURE DENSITY GAUGE | | | | The licensee reported the theft of a Humbolt model 5001 nuclear moisture | | density gauge. The gauge contains 40 mCi of Am-241 and 8 mCi of Cs-137. | | The theft occurred overnight at the residence of one of the company's | | employees in Harrison, OH. The Hamilton County Sheriff's Office was | | notified of this event. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35943 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: INDIAN POINT REGION: 1 |NOTIFICATION DATE: 07/21/1999| | UNIT: [2] [] [] STATE: NY |NOTIFICATION TIME: 18:48[EDT]| | RXTYPE: [2] W-4-LP,[3] W-4-LP |EVENT DATE: 07/21/1999| +------------------------------------------------+EVENT TIME: 18:00[EDT]| | NRC NOTIFIED BY: MIKE VASELY |LAST UPDATE DATE: 07/21/1999| | HQ OPS OFFICER: DOUG WEAVER +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |JAMES NOGGLE R1 | |10 CFR SECTION: | | |AOUT 50.72(b)(1)(ii)(B) OUTSIDE DESIGN BASIS | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |2 N Y 99 Power Operation |99 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OUTSIDE DESIGN BASIS - SILICONE SEALANT NOT PROPERLY APPLIED TO SOME | | EQUIPMENT | | | | During an engineering inspection of the condition of the sealant used to | | satisfy environmental qualification requirements, several components were | | found to have seal conditions that did not meet the Con Edison design | | specifications. In each case it is believed that the degraded condition | | identified will not prevent the associated equipment from performing its | | intended safety functions and operability determinations are being completed | | to document these conclusions. The specific problems identified are as | | follows: | | | | - MSIV limit switches | | - Auxiliary feedwater flow indication | | - Motor driven auxiliary feedwater pumps recirculation valves | | - City water backup solenoid valves and limit switches to motor driven | | auxiliary feedwater pumps. | | | | An inspection plan is being developed to determine the extent of this | | condition. | | | | The licensee informed the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 35944 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: IDAHO NAT ENGR & ENVIRONMENTAL LAB |NOTIFICATION DATE: 07/21/1999| |LICENSEE: IDAHO NAT ENGR & ENVIRONMENTAL LAB |NOTIFICATION TIME: 22:17[EDT]| | CITY: Idaho Falls REGION: 4 |EVENT DATE: 07/21/1999| | COUNTY: STATE: ID |EVENT TIME: 19:55[MDT]| |LICENSE#: AGREEMENT: N |LAST UPDATE DATE: 07/22/1999| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |ELMO COLLINS R4 | | |LARRY CAMPER NMSS | +------------------------------------------------+FRANK CONGEL IRO | | NRC NOTIFIED BY: JOE GARCIA |CHARLIE BAGWELL FEMA | | HQ OPS OFFICER: DOUG WEAVER |BILL BEECHER PAO | +------------------------------------------------+DOE (fax) | |EMERGENCY CLASS: ALE | | |10 CFR SECTION: | | |AAEC 50.72 (a) (1) (I) EMERGENCY DECLARED | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ALERT DECLARED DUE TO A BRUSH FIRE ON SITE PROPERTY | | | | The licensee declared an ALERT due to a brush fire that has burned onto the | | Idaho National Engineering and Environmental Laboratory (INEEL) site | | property. No radioactive material is currently threatened by the fire. The | | use of some communications towers has been interrupted because the fire | | burned a telephone pole connecting the towers to the facility. | | | | The licensee notified the state of Idaho and local county officials, DOE and | | the Fort Hall Indian Reservation. | | | | * * * UPDATE AT 0047 ON 07/22/99 FROM ED BROWN TO JOLLIFFE * * * | | | | The brush fire has burned to within 11 miles of the nearest site building. | | The wind is presently blowing from 320� (Southeast, away from site | | buildings) at 4 MPH. The outside temperature is 65�F. The fire is being | | fought by the Bureau of Land Management. There is no threat to site | | facilities. | | | | * * * UPDATE AT 0137 ON 07/22/99 FROM ED BROWN TO JOLLIFFE * * * | | | | The wind is now blowing from 224� (Northeast, away from site buildings). | | | | * * * UPDATE AT 0211 ON 07/22/99 FROM ED BROWN TO JOLLIFFE * * * | | | | At 2347 MDT on 07/21/99, the licensee terminated the ALERT. The fire is now | | under control and there is now no ongoing fire on INEEL site property. | | | | The licensee notified the state of Idaho and local county officials, DOE and | | the Fort Hall Indian Reservation of the termination of the ALERT. | | | | The NRC Operations Officer notified R4DO Collins, NMSS EO Camper, IRO | | Congel, FEMA Bagwell, PAO Beecher, DOE (fax), USDA (fax), HHS (fax) and EPA | | (NRC) (fax) of the termination of the ALERT. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021