Event Notification Report for March 17, 1999
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 03/16/1999 - 03/17/1999 ** EVENT NUMBERS ** 35469 35475 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35469 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SOUTH TEXAS REGION: 4 |NOTIFICATION DATE: 03/12/1999| | UNIT: [] [2] [] STATE: TX |NOTIFICATION TIME: 19:02[EST]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 03/12/1999| +------------------------------------------------+EVENT TIME: 14:12[CST]| | NRC NOTIFIED BY: TIM FRAWLEY |LAST UPDATE DATE: 03/16/1999| | HQ OPS OFFICER: DICK JOLLIFFE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |GARY SANBORN R4 | |10 CFR SECTION: |WILLIAM BECKNER, EO NRR | |AESF 50.72(b)(2)(ii) ESF ACTUATION |ROSEMARY HOGAN IRO | |NLCO TECH SPEC LCO A/S | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - PARTIAL LOSS OF OFFSITE POWER DUE TO A FAULT IN A SWITCHYARD CIRCUIT | | BREAKER - | | | | AT 1412 CST ON 03/12/99, DURING PLANT SWITCHYARD ACTIVITIES, UNIT 2 | | EXPERIENCED A LOSS OF POWER TO THE #2 STANDBY TRANSFORMER DUE TO A FAULT IN | | A SWITCHYARD CIRCUIT BREAKER. THIS CONDITION CAUSED TRAIN 'B' AND TRAIN 'C' | | 4160-VOLT ESF BUSES TO ACTUATE ON A LOSS OF OFFSITE POWER. THE FOLLOWING | | ESF SYSTEMS ACTUATED: TRAIN 'B' AND TRAIN 'C' ESF EDGs, ESSENTIAL COOLING | | WATER SYSTEM, ESSENTIAL CHILLED WATER SYSTEM, COMPONENT COOLING WATER | | SYSTEM, CONTROL ROOM HVAC SYSTEM, AND AUXILIARY FEEDWATER SYSTEM (ON RECIRC | | MODE). | | | | DURING THIS EVENT, THE SPENT FUEL POOL TEMPERATURE INCREASED APPROXIMATELY | | 1.5�F, AND THE TRAIN 'B' ESF EDG (#22) OUTPUT BREAKER FAILED TO CLOSE | | AUTOMATICALLY. THE LICENSEE DECLARED THE TRAIN 'B' ESF EDG (#22) | | INOPERABLE, EVEN THOUGH IT IS FUNCTIONAL (72-HOUR LCO). | | | | THERE WAS NO FIRE, AND NO PERSONNEL WERE INJURED. THE LICENSEE RESTORED ALL | | SYSTEMS TO NORMAL. UNIT 2 IS STABLE AND OPERATING AT 100% POWER. | | | | THE LICENSEE IS INVESTIGATING THE CAUSE OF THE FAULT IN THE SWITCHYARD | | CIRCUIT BREAKER AND THE TRAIN 'B' ESF EDG (#22) OUTPUT BREAKER FAILING TO | | CLOSE AUTOMATICALLY. | | | | THE LICENSEE PLANS TO SUBMIT A LICENSEE EVENT REPORT ON THIS EVENT TO THE | | NRC. | | | | THIS EVENT HAD NO IMPACT ON UNIT 1. | | | | THE NRC RESIDENT INSPECTOR WAS ON SITE DURING THIS EVENT AND REPORTED IT TO | | REGION 4. | | REGION 4 PERSONNEL WERE AWARE OF THIS EVENT PRIOR TO THE LICENSEE REPORTING | | IT TO THE NRC OPERATIONS OFFICER. | | | | | | * * * UPDATE AT 1207 ON 03/13/99 FROM TIM FRAWLEY TO JOLLIFFE * * * | | | | AT 1412 CST ON 03/12/99, DURING THE LOSS OF POWER TO #2 STANDBY TRANSFORMER, | | THE LICENSEE ENTERED TECH SPEC 3.0.3 FOR UNIT 2 DUE TO THE LOSS OF POWER TO | | TWO 13.8-KV STANDBY BUSES AND THE INOPERABLE CONDITION OF THE TRAIN 'B' ESF | | EDG (#22); THIS CONDITION IS NOT COVERED UNDER THE ACTIONS OF TECH SPEC | | 3.8.1.1 (AC ELECTRICAL POWER SOURCES). | | | | AT 1530 CST ON 03/12/99, THE LICENSEE RESTORED POWER TO THE TWO 13.8-KV | | STANDBY BUSES. | | | | AT 1553 CST ON 03/12/99, THE LICENSEE EXITED TECH SPEC 3.0.3 FOLLOWING | | SATISFACTORY PERFORMANCE OF SURVEILLANCE REQUIREMENT 4.8.1.1.1.a. THIS | | CONDITION IS REPORTABLE TO THE NRC UNDER SECTION 2.G OF FACILITY OPERATING | | LICENSE NPF-80. | | | | UNIT 2 IS STABLE AND OPERATING AT 100% POWER. | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS | | OFFICER NOTIFIED THE R4DO (GARY SANBORN), NRR EO (BILL BECKNER), AND IRO MGR | | (ROSEMARY HOGAN). | | | | * * * UPDATE 1916 3/16/99 FROM MERTINK TAKEN BY STRANSKY * * * | | | | "ON 3/12/99 STANDBY DIESEL GENERATOR 22 AUTO STARTED IN RESPONSE TO A LOSS | | OF OFFSITE POWER TO THE 4.15 kV ENGINEERED SAFETY FEATURES BUS (ESF) E2B. | | THE DIESEL GENERATOR OUTPUT BREAKER FAILED TO AUTOMATICALLY CLOSE. | | OPERATIONS PERSONNEL MANUALLY CLOSED THE OUTPUT BREAKER USING THE REMOTE | | HANDSWITCH IN THE CONTROL ROOM AND ENERGIZED THE ENGINEERED SAFETY FEATURES | | BUS. DURING THE TROUBLESHOOTING OF THIS EVENT IT WAS DETERMINED THAT THE | | CELL SWITCH IN E2B 480 VOLT LOAD CENTER CUBICLE 3F FOR ESSENTIAL CHILLER 216 | | WAS FOUND TO BE IN DEGRADED CONDITION. THIS FUNCTION OF THIS CELL SWITCH IS | | TO ALLOW THE SEQUENCER TO RECOGNIZE THE BREAKER AS OPEN AND PERFORM THE | | REQUIRED SEQUENCING OF ESF LOADS, STARTING WITH THE CLOSING OF THE DIESEL | | GENERATOR OUTPUT BREAKER. THIS BREAKER HAD BEEN RACKED OUT SINCE 2/28/99 FOR | | MAINTENANCE ON THE CHILLER. | | | | "SINCE THE PERFORMANCE OF RACKING OUT THIS BREAKER DID NOT VERIFY CELL | | SWITCH OPERATION AS DIRECTED BY OPERATING PROCEDURES, DIESEL GENERATOR 22 | | WAS INOPERABLE SINCE THE RACKING OUT OF THE CHILLER BREAKER ON 2/28/99. WITH | | THIS DIESEL GENERATOR INOPERABLE, TECHNICAL SPECIFICATIONS REQUIRE | | PERFORMANCE OF CONDITIONAL SURVEILLANCES FOR VERIFICATION OF OPERABILITY OF | | AC OFFSITE SOURCES. SINCE THIS TECHNICAL SPECIFICATION REQUIREMENT WAS NOT | | SATISFIED, THIS EVENT IS REPORTABLE AS A CONDITION PROHIBITED BY TECHNICAL | | SPECIFICATIONS AND NOTIFICATION IS MADE PER NPF-80, SECTION 2G." | | | | The NRC resident inspector has been informed of this update by the licensee. | | Notified R4DO (Harrell). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35475 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: ROBINSON REGION: 2 |NOTIFICATION DATE: 03/16/1999| | UNIT: [2] [] [] STATE: SC |NOTIFICATION TIME: 01:20[EST]| | RXTYPE: [2] W-3-LP |EVENT DATE: 03/15/1999| +------------------------------------------------+EVENT TIME: 22:12[EST]| | NRC NOTIFIED BY: DAVID COOK |LAST UPDATE DATE: 03/16/1999| | HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |EDWARD MCALPINE R2 | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |2 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | COURTESY NOTIFICATION REGARDING A FATALITY WITHIN THE OWNER CONTROLLED AREA | | OUTSIDE THE 1,400-FOOT BARRIER | | | | The following text is a portion of a facsimile received from the licensee: | | | | "At approximately 2212 on 03/15/99, Robinson Security [personnel] notified | | the Control Room of an automobile with a fatality on the West Entrance Road | | access to the plant outside the site boundary. The cause of the fatality is | | unknown, and this occurrence is being investigated by local law enforcement | | agencies and the State Law Enforcement Division. Due to the fatality | | occurring off-site, but on CP&L property adjacent to the site boundary, and | | [due to] the interaction of several off-site agencies responding to the | | scene, the NRC Operations Center is being notified as a courtesy. This call | | is for informational purposes only and does not fall within the reporting | | criteria of 10 CFR 50.72." | | | | The licensee notified the NRC resident inspector. The licensee does not | | plan to issue a press release. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021