Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Draft Final Regulatory Guide DG-1105, "Procedures and Criteria for Assessing Seismic Soil Liquefacti

July 15, 2003

MEMORANDUM TO: William D. Travers
Executive Director for Operations
    /RA/
   
FROM: John T. Larkins, Executive Director
Advisory Committee on Reactor Safeguards
   
SUBJECT: DRAFT FINAL REGULATORY GUIDE DG-1105, "PROCEDURES AND CRITERIA FOR ASSESSING SEISMIC SOIL LIQUEFACTION AT NUCLEAR POWER PLANT SITES"

During the 504th meeting of the Advisory Committee on Reactor Safeguards, July 9-11, 2003, the Committee considered the draft final Regulatory Guide DG-1105, "Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites," and decided not to review it. The Committee has referred this Regulatory Guide to the Advisory Committee on Nuclear Waste for possible consideration.

Reference:

Memorandum dated July 2, 2003, from Michael E. Mayfield, Director, Division of Engineering Technology, RES, to John T. Larkins, Executive Director, ACRS, Subject: Request for ACRS Review of Draft Final of DG-1105, "Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites"

cc: A. Vietti-Cook, SECY
I. Schoenfeld, OEDO
A. Thadani, RES
M. Mayfield, RES
Y. Li, RES
J. Garrick, ACNW, w/ref.
H. Larson, ACNW, w/ref.

Page Last Reviewed/Updated Monday, August 15, 2016

Page Last Reviewed/Updated Monday, August 15, 2016