Proposed Revision 3 to Regulatory Guide 1.52, “Design, Inspection, and Testing Criteria for Air Filt

July 18, 2000

MEMORANDUM TO:   William D. Travers
Executive Director for Operations
/RA/
FROM: John T. Larkins, Executive Director
Advisory Committee on Reactor Safeguards
SUBJECT:   PROPOSED REVISION 3 TO REGULATORY GUIDE 1.52, "DESIGN, INSPECTION, AND TESTING CRITERIA FOR AIR FILTRATION AND ADSORPTION UNITS OF POST-ACCIDENT ENGINEERED-SAFETY-FEATURE ATMOSPHERE CLEANUP SYSTEMS IN LIGHT-WATER-COOLED NUCLEAR POWER PLANTS."

During the 474th meeting of the Advisory Committee on Reactor Safeguards, July 12-14, 2000, the Committee considered the subject draft regulatory guide. The Committee has no objection to the publication of this regulatory guide.

Reference:

Draft Regulatory Guide DG-1102, Proposed Revision 3 to Regulatory Guide 1.52, "Design, Inspection, And Testing Criteria For Air Filtration And Adsorption Units of Post-Accident Engineered-Safety-Feature Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants," July 7, 2000.

cc:   A. Vietti-Cook, SECY
J. Craig, OEDO
G. Millman, OEDO
S. Collins, NRR
G. Holahan, NRR
J. Hannon, NRR
J. Segala, NRR

Page Last Reviewed/Updated Monday, July 25, 2016

Page Last Reviewed/Updated Monday, July 25, 2016